Loading ...
Loading ...
Loading ...
ENGLISH
35
17
When the green light starts  ashing slowly. Turn the control
dial to the
position. The red light turns on.
18
Empty the large container and the drip tray and place them back.
Rinsing Cycle 2
19
Rinse the water tank and  ll it up to the MAX level with fresh water.
Put it back in the machine.
20
When the green light turns on, turn the control dial to the
position.
21
The machine dispenses through the hot water/steam wand until
the water tank is empty.
22
After this, the machine turns o . The red light switches o . Turn
the control dial to the
position.
23
Rinse the drip tray and put it back. Reinstall the Pannarello and
Intenza water lter (as applicable).
24
Rinse the water tank and  ll it up to the MAX level with fresh water.
Put it back in the machine.
25
To make co ee, turn on the machine.
Loading ...
Loading ...
Loading ...