Loading ...
Loading ...
Loading ...
4
Installation
This Owner’s Guide provides specific operating
instructions for your model. Use the freezer only as
instructed in this Use & Care Manual. Before starting
the freezer, follow these important first steps.
LOCATION
• Chooseaplacethatisnearagroundedelectrical
outlet. Do Not use an extension cord or an adapter
plug.
• Forthemostefcientoperation,thefreezershouldbe
located where surrounding temperatures will not drop
below 40°F (5°C) or exceed 110°F (43°C).
• Allowthefollowingclearancesforeaseofinstallation,
proper air circulation, and electrical connections:
Sides 3/8”
Back & Top 1”
• DoNotblockthetoegrilleonthelowerfrontofyour
freezer. Sufficient air circulation is essential for the
proper operation of your freezer.
DOOR OPENING
Installation
Refrigerator
Freezer
NOTE
The exterior walls of the freezer may become quite
warm as the compressor works to transfer heat from
the inside. Temperatures as much as 30°F warmer than
room temperature can be expected.
NOTE
If your freezer is placed with the door hinge side against
a wall, you may have to allow additional space so the
door can be opened wider.
LEVELING
The freezer must have all bottom corners resting firmly on
asolidoor.Theoormustbestrongenoughtosupport
a fully loaded freezer. NOTE: It is Very Important for
your freezer to be level in order to function properly. If
the freezer is not leveled during installation, the door may
be misaligned and not close or seal properly, causing
cooling, frost,
or moisture
problems.
To Level
Freezer:
After discarding
crating screws
and wood
base, use a
carpenter’s
level to level
the freezer
from front-to-
back. Adjust the
plastic leveling
feet in front, ½
bubble higher,
so that the door
closes easily
when left halfway open.
Leveling Instructions for all Refrigerator/Freezer Pair:
• Removetwoleglevelersprovidedinliteraturebag.
While unit is lying on its back for wood skid removal,
install both leg levelers in rear of unit.
• Leveldoorofrstunitusingallfourlevelersandslide
unit into place. Recheck for levelness and adjust if
necessary.
• Measuredistancefromoortobottomofdooron
first unit. Adjust and level second unit so door height
matches.
• LegLevelAdjustments
- One full turn of all four leg levelers will raise door
5/32”.
- One full turn of both front leg levelers will raise
door 3/16” and tilt top of door back 7/16”.
- One full turn of both rear leg levelers will lower
door 1/32” and tilt top of door forward 7/16”.
- One full turn of both side leg levelers will raise
door 3/16” and tilt top of door 3/8”.
• Slidesecondunitintoplaceleavingaminimumgap
of 3/16” between units for door swing clearance.
• Thislaststepmayrequireatleastoneextractionof
the second unit to properly align units in a “built-in”
application.
Loading ...
Loading ...
Loading ...