Loading ...
Loading ...
Loading ...
C2648 E
Remote Condenser Models - User Manual
May 2017
Page 15
Adjustments
Bridge Thickness - For A Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove left curtain.
4. Use a box wrench and rotate the bridge thickness
adjustment screw in 1/8 turn increments CW
to increase bridge thickness. Rotate CCW to
decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain to its normal position.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water purge setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings or
left on automatic.
purge
setting
1 - Minimum 2 - Moderate 3 - Standard 4 - Heavy 5 - Maximum A - Automatic
Water
Type
RO water or
equivalent
Factory
Setting for
typical water
High TDS
water
Any with
conductivity not
less than 10
microSiemens/cm
To set:
1. Switch the machine OFF by holding the Off button
in until a number or the letter A shows on the
display.
2. Press and release the On button repeatedly until
the number on the display corresponds to the
desired setting.
3. Press and release the Off switch again to return to
the normal control state.
Ice Thickness Sensor
Ice Bridge Thickness Measurement
Too Big
Just Right,
Small Cube
Just Right,
Medium Cube
Too Small
1/8 to 3/16” bridge
Loading ...
Loading ...
Loading ...