GE - General Electric AKV08FB GE Mechanical 115 Volt Room Air Conditioner

User Manual - Page 16

For AKV08FB.

PDF File Manual, 48 pages, Download pdf file

Loading ...
Loading ...
Loading ...
16
Consumer Support
Troubleshooting Tips Operating Instructions Safety InstructionsInstallation Instructions
Install the Case in the Window
Carefully position the case in the window
until the bottom mounting rail drops into the
channels in the supports. Center the case and
lower the window behind the top mounting
rail. The case should be slightly tilted to the
outside. Use a level; about a 1/2 bubble will
be the correct case slant to the outside.
Attach the bottom of the case to the support
rail with a Type C screw, one on each side.
Extend the left and right accordion panels
to the vertical window sashes, drill 1/8 pilot
holes, and attach the top corners with 2 Type B
screws. Use an accordion panel clamp on each
lower corner to trap the panels. Drill 1/8
pilot holes and attach the panel clamps with
Type B screws.
NOTE: Seal any openings around the case or accordion
panels with sealer or foam gaskets.
C
B
A
Window installation instructions.
Secure the Case in the Window and Install the Foam Top Window Gasket
Drill a 1/8 pilot hole and attach the top
mounting rail to the sash with a Type B screw.
Cut the foam top window gasket to the
window width.
Stuff the foam between the glass and the
window to prevent air and insects from
getting into the room.
Attach the window locking bracket with
2 Type B screws.
D
C
B
A
10
11
Type B
screw
Type B
screw
Panel clamp and
Type B screw
Top mounting rail
Panel clamp and
Type B screw
Type B screw
Top mounting rail
Loading ...
Loading ...
Loading ...