Loading ...
Loading ...
Loading ...
EN
8
8
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
center of the area in which the hood will be installed.
Draw a horizontal line at 24” above the hob.
• Place bracket 7.2.1 on the wall as shown about 1/16” from the ceiling or upper limit aligning
the center (notch) with the vertical reference line.
Mark the wall at the centers of the holes in the bracket.
Place bracket 7.2.1 on the wall as shown at X” below the first bracket (X = height of the up-
per chimney section supplied), aligning the center (notch) with the vertical line.
Mark the wall at the centers of the holes in the bracket.
Mark a reference point as indicated at 4” 9/16 from the vertical reference line and 13” 3/8
above the horizontal reference line.
Repeat this operation on the other side.
Drill ø 5/16” holes at all the center points marked.
Insert the wall plugs 11 in the holes.
Fix the brackets using the 12a screws supplied.
Insert the two screws 12a supplied in the hood body fixing holes, leaving a gap of 3/16 ”
between the wall and the head of the screw.
11
12a
12"5/8
X
÷1/16"
4"9/16
24"
7.2.1
4"9/16
Loading ...
Loading ...
Loading ...