LG Electronics LMU240HHV AirCONDITIONER

User Manual - Page 47

For LMU240HHV.

PDF File Manual, 54 pages, Read Online | Download pdf file

LMU240HHV photo
Loading ...
Loading ...
Loading ...
Installation Manual 47
Test Running
ENGLISH
Prepare remote control
Remove the battery cover by pulling it according
to the arrow direction.Insert new batteries making
sure that the (+) and (–) of battery are installed
correctly. Reattach the cover by pushing it back
vinto position.
Evaluation of the performance
Operate unit for 15~20 minutes, then check the system refrigerant charge:
- Measure the pressure of the gas side service valve.
- Measure the temperature of the intake and discharge of air.
- Ensure the difference between the intake temperature and the discharge is more than 8°C.
- For reference, the gas side pressure of optimum condition is as below.(Cooling)
- Check that all tubing and wiring have been properly connected.
- Check that the gas and liquid side service valves are fully open.
Bolt
Tubing connection
Discharge
temperature
Discharge air
Intake temperature
Discharge
temperature
Discharge air
Intake temperature
Discharge
temperature
Discharge air
Intake temperature
Test Running
:
• Use 2 AAA(1.5volt) batteries. Do not use rechargeable
batteries.
Remove the batteries from the remote control if the
system is not going to be used for a long time.
NOTICE
:
If the actual pressure are higher than shown, the system is most likely over-charged, and charge
should be removed. If the actual pressure are lower than shown, the system is most likely
undercharged, and charge should be added. The air conditioner is now ready for use.
NOTICE
Refrigerant
Outside
ambient
TEMP.
The pressure of the
gas side service
valve.
R410A 35°C (95°F)
8.5~9.5kg/cm2G
(120~135 P.S.I.G.)
Loading ...
Loading ...
Loading ...