MOUNT-VP07DP Vivo Projector

User Manual - Page 3

For MOUNT-VP07DP.

PDF File Manual, 8 pages, Read Online | Download pdf file

Loading ...
Loading ...
3
ASSEMBLY STEPS
STEP 1
TOOLS NEEDED
Phillips
Screwdriver
Drill
Remove plastic plug from Ceiling Plate (D).
29.7 lbs
(13.5 kg)
DO NOT EXCEED WEIGHT CAPACITY.
Failure to do so may result in serious injury.
STEP 2
Insert toggles at end of Y-Cable (E) into 2 of the 16 slots on the top of the Ceiling Plate, making sure
the slots chosen will provide optimal support for the mount with projector. Place Ceiling Plate into
suspended-ceiling grid. Thread end of cable through the side hole in the lock in the direction of the
arrow, wrap cable around beam or other support, then insert cable down through center hole in lock
and pull down to secure.
Loading ...
Loading ...
Loading ...