Manitowoc UNF0300A161 29" Air Cooled Undercounter Nugget Ice Machine with 330 lbs. Daily Ice Production, 50 lbs. Storage Capacity and Slide Up Door in Stainless Steel - 115v/60

User Manual - Page 18

For UNF0300A161.

PDF File Manual, 28 pages, Read Online | Download pdf file

UNF0300A161 photo
Loading ...
Loading ...
Loading ...
18 Part Number 000015236 Rev 00 11/17
Installation Instructions Section 2
Installation Check List
All Manitowoc ice machines are factory-operated and
adjusted before shipment. Adjustments and maintenance
procedures outlined in this manual are the responsibility of
the owner/operator and are not covered by the warranty.
Is the ice machine level?
Is the ice machine and adapter (when used) secured to
the dispenser?
Have all of the electrical and water connections been
made?
Has the supply voltage been tested and checked against
the rating on the nameplate?
Is there proper clearance around the ice machine for air
circulation?
Is the ice machine grounded and polarity correct?
Has the ice machine been installed where ambient
temperatures will remain in the range of 50° - 110°F
(10° - 43°C)?
Has the ice machine been installed where the incoming
water temperature will remain in the range of 37° - 90°F
(3° - 32°C)?
Is there a separate drain for the water-cooled
condenser?
Is there a separate drain for the dispenser?
Is the ice making water turned on?
Are all electrical leads free from contact with
refrigeration lines and moving equipment?
Has the owner/operator been instructed regarding
maintenance and the use of Manitowoc Cleaner and
Sanitizer?
Has the owner/operator completed the warranty
registration card?
Has the ice machine and bin been sanitized?
Is the rocker switch set to ON?
Additional Checks for QuietQube Models
Is the line set length, rise and drop within the
guidelines?
Are the suction and liquid line shut-off valves open?
Is the line set routed properly?
Are both refrigeration lines to remote condensing
unit run so they do not lay in water and are properly
insulated?
Does the condenser fan motor(s) operate properly after
start-up?
Have all the refrigeration fittings and joints been leak
checked?
Has the condenser/condensing unit been installed to
prevent any roofing damage?
Have the refrigeration lines been insulated and secured
properly to prevent vibration?
Has the RCUF remote condensing unit been located
where ambient temperatures will remain in the range of
-20° to 120°F (-29° to 48.9°C)?
Is a refrigeration oil trap (S-trap) installed if the
condenser is installed 21 to 35 feet (6 to 11 m) above
the ice machine head?
Loading ...
Loading ...
Loading ...