Loading ...
Loading ...
Loading ...
23. Thread cable end through the jam nut and into the rod end bearing a minimum of 12mm.
Item Description Qty.
1 Rod End Bearing 1
2 Jam Nut, M10 1
3 Cable 1
24. Install screw, washers, and locknut securing the bushing and rod bearing end to the main frame using an 8mm Allen wrench.
Item Description Qty.
1 Rod End Bearing 1
2 Bushing 1
3 Washer, Flat 3/8" 2
4 Nut, M10 x 1.5, Hex Nylock 1
5 Screw, M10 x 1.5, 50mm 1
Tighten hardware to 20-25 (27.1-33.9 Nm).
Install Front and Top Caps
1. Set front shrouds into the bottom cap. Install screws securing the front cap to the tower frame using a 10 mm wrench.
Item Description Qty.
1 Front Cap 1
2 Front Shroud, 1
3 Front Shroud, Right 1
4 Screw, M6, HCS, 50 mm 4
Tighten hardware to 10-13 in-lb (1.1-1.5 Nm).
Page 22 of 34
Loading ...
Loading ...
Loading ...