Cybex SHOULDER PRESS Ion Single Stations

User Manual - Page 24

For SHOULDER PRESS.

PDF File Manual, 36 pages, Download pdf file

Loading ...
Loading ...
Loading ...
23. Thread cable end through the jam nut and into the rod end bearing a minimum of 12mm.
Item Description Qty.
1 Rod End Bearing 1
2 Jam Nut, M10 1
3 Cable 1
24. Install screw, washers, and locknut securing the bushing and rod bearing end to the main frame using an 8mm Allen wrench.
Item Description Qty.
1 Rod End Bearing 1
2 Bushing 1
3 Washer, Flat 3/8" 2
4 Nut, M10 x 1.5, Hex Nylock 1
5 Screw, M10 x 1.5, 50mm 1
Tighten hardware to 20-25  (27.1-33.9 Nm).
Install Front and Top Caps
1. Set front shrouds into the bottom cap. Install screws securing the front cap to the tower frame using a 10 mm wrench.
Item Description Qty.
1 Front Cap 1
2 Front Shroud,  1
3 Front Shroud, Right 1
4 Screw, M6, HCS, 50 mm 4
Tighten hardware to 10-13 in-lb (1.1-1.5 Nm).
Page 22 of 34
Loading ...
Loading ...
Loading ...