Loading ...
A
D
E
F
www.SereleneLifeHome.com
B
C
A
Step 5
• Slide the top tube assembly into repair
stand base assembly, push the collar down
until it stop. Using 3mm hex wrench tight
the botton screw on collar. Set top tube
assembly at desired height and fully tight
the hand knob on collar.
Note: Do not set height beyond "max" line
on top tube assembly.
C
B
C
C
Step 4
• Disassemble the clamp assembly
and install into top tube assembly as
image shown.
Step 2
• Slide the Yoke down the Large Vertical Upright
(#A) until it bottoms out on the Hard Stop (#F).
Insert the M6 Flange Nut (#E) into the hex pocket
in the Yoke. From the other side of the Yoke insert
the Knob(#D) into the hole in the Yoke. Screw in the
Knob (#D) until it is fully tightened. Fully tightened is
when both anges on the Yoke come into contact with
each other.
Step 3
• Assemble and install the hardware and
mating pieces in the order shown through
each leg. Using a 4mm hex wrench and a
10mm at wrench, tighten the M6x60mm
screw (#K.b) to 5Nm.
Loading ...
Loading ...