Loading ...
Loading ...
Loading ...
11
©IMPEX INC. www.marcypro.com
STEP 3 (See Diagram 3)
A.) Attach the 92” Upper Cable (#42) to the open bracket under the Upper Frame (#13).
B.) Attach a Pulley (#41) to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#52), one
Cable Retainer (#36),one cable Retainer Bushing(#37), two Ø ¾” Washers (#55), and one
M10 Aircraft Nut (#57). Make sure the ball stopper on the Cable is situated under the
bracket.
C.) Draw the Cable over the Pulley then downward. Attach a Pulley to the Cable. Attach the
Pulley to the top holes on the two Double Floating Pulley Brackets (#21). Secure the
Pulley to the Brackets with one M10 x 2” Allen Bolt (#51), two Ø ¾” Washers (#55), two
Cable Retainers (#36), two cable Retainer Bushings(#37),and one M10 Aircraft Nut (#57).
D.) Draw the Cable around the Pulley then upward to the opening on the Weight Glide Post
(#12). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#50), two
Ø 1” x ½” Pulley Bushings (#33), and one M10 Aircraft Nut (#57). Let the Brackets
hanging for now.
E.) Draw the Cable around the Pulley then downward to the triangular bracket on the Sliding
Weight Post (#14). Secure the end of Cable to the bracket with one M10 x 1” Allen Bolt
(#53), two Ø ¾” Washers (#55), and one M10 Aircraft Nut (#57).
Loading ...
Loading ...
Loading ...