Loading ...
Loading ...
Loading ...
GB
Owners manual
PLATINUM PRO
7
Step 2:
Front handlebars and upright tube
assembly
1. Install the upright tube cover (31)
onto the upright tube (2), making sure
it is facing the correct direction as in
the picture below. Run the two cables
(44, 45) through the bottom of the
upright tube and out the top opening.
2. Install the Upright tube (2) into the
receiving tube of the Main Frame (1)
with six 5/16” × 5/8” Hex Head Bolts
(68), four 5/16” × 18mm Flat Washers
(76) on the sides of the tube and
two 5/16” × 19mm Curved Washers
(83) on the front of the tube. Pull
slightly on the cables while installing
the upright tube to avoid cutting the
cables.
3. Remove the white Styrofoam pad
(installed by factory to prevent bolts
from being accidentally dropped into
the Bike).
4. Install the Computer Cable (44) and
Hand Pulse Sensor Assembly W/
Cable (45) into the connector in the
back of the Console (19). Install the
console onto the mounting plate
with four M5×12mm Phillips Head
Screws (99). Be careful not to pinch
the cables between the console and
the mounting plate. This could short
circuit the cables and damage the
electronics.
5. Install the Fixed Handle bar Assembly
(3) onto the Upright tube (2) with two
5/16” × 5/8” mm Hex Head Bolts (68),
two 5/16” × 18mm Flat Washers (76)
and two 5/16” Split Washers (82)
Loading ...
Loading ...
Loading ...