Loading ...
Loading ...
Loading ...
April, 2016
Page 11
C0530E through C1030E
Remote Condenser Models - User Manual
Plumbing Requirements
All models require connection to cold, potable water.
A hand actuated valve within site of the machine
is required. There is a single 3/8” FPT inlet water
connection.
Water Filters Install a new cartridge if the lters were
used with a prior machine.
All models require drain tubing to be attached to them.
There is a single ¾” FPT drain tting in the back of the
cabinet.
Install new tubing when replacing a prior ice machine,
as the tubing will have been sized for the old model
and might not be correct for this one.
1. Connect water supply to water inlet tting.
Note: This NSF listed model has a 1" anti-back ow
air gap between the potable water inlet tube end and
the highest possible reservoir water level, no back
ow device is required.
2. Connect drain tubing to drain tting.
3. Route the drain tubing to building drain. Follow
local codes for drain air gap.
Use rigid drain tubes and route them separately – do
not Tee into the bin’s drain.
Vent the reservoir drain. A vertical vent at the back of
the drain, extended about 8 – 10” will allow the
gravity drain to empty and also keep any surges
during draining from discharging water.
Horizontal runs of drain tubing need a ¼” per fall per
foot of run for proper draining.
Follow all applicable codes.
Water Fitting
Water Supply
Drain Must Be
Vented
Drains Must Be
Separate
Field Supplied
Water Supply and Drain Illustration
Loading ...
Loading ...
Loading ...