BUILD AND INSTALL THE ZONELINE
BASE PLATFORM
1. Construct a 23
1
4 min. x 23
1
4min. square platform
with legs to raise the platform a minimum of 8.
NOTE: The platform must have a load-bearing
capacity of 175 lbs. minimum.
1
Installation Instructions
18
WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION
• Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions
provided with the plenum.
IMPORTANT: The wall plenum is not designed to carry structural loads.
Proper wall header construction is required. The plenum requires proper flashing,
shim and caulk for a weather resistant installation.
Properly square
and level plenum.
Proper header for structural
support.
Apply proper caulking
and flashing.
Architectural Louver—
RAVAL1
Exterior/Outside Wall
Case
Wall Plenum
RAVWP6 – 6D x 19
3
4W x 32H
RAVWP8 – 8D x 19
3
4W x 32H
RAVWP12 – 12D x 19
3
4W x 32H
RAVWP15 – 15D x 19
3
4W x 32H
2. Make drain hole cutout(s):
Primary Drain – Centerline of drain is
approximately 5
1
4 from left platform edge
and 8
1
2 from back platform edge.
Secondary Drain – Centerline of drain
is approximately 6
1
2 from left platform edge
and 5
1
4 from back platform edge.
3. Place the platform in the utility closet
with the following clearance between it
and the interior surface of the walls/door/panel:
4 min. from front of the case –
Unit to be installed through FRONT of case
5 min. from front of the case –
Unit to be installed through SIDE of case
3 min. from two sides of the case
4. Align the platform with the opening of
the wall plenum and secure to the floor
using appropriate brackets and bolts.
23
1
4 min.
8 min.
for drain
access
Cutout for drain
connection(s)
(see NOTE below)
Back of platform
Left side of platform
NOTE: Specific cutout size
for drain connections needs
to be determined by the installer
for the given installation situation.
5
1
4
23
1
4 min.
5
1
4
6
1
2
8