Loading ...
Loading ...
Loading ...
English - 11
Installation and Operation Guide
Start Your Job (Continued)
Drainage (Important)
Press the Manual Drainage button to process drainage manually. It will last for 25
seconds and won’t stop dehumidification or defrosting process.
If the water tank is full or not positioned horizontally, the water tank full indicator light
will go on. Any dehumidification or defrosting process will pause and the machine will
automatically process drainage for 25 seconds. Afterwards, if the water tank is still
detected full, an error code will be displayed (See Page 9: Error Codes or Page 14:
Troubleshooting Guide).
When turned off, the machine will automatically process drainage for 25 seconds.
Please wait until this process completes.
Please do not lift the drainage hose higher than 16 feet (5 m) above the machine.
Calculate the usage time
Please remember to write down the ending time right before the machine
shuts down.
Compare the starting time and the ending time to calculate the usage time.
CT
F/C
:
°C
%RH
TOTAL TIME
(Continued)
Secondary Intake (Opened)
Secondary Intake (Closed)
Secondary Filter Case
Important: Close the secondary intake when environment temperature falls
under 68 °F (20 °C) or in contaminated environment for better efciency.
To close the secondary intake, remover the filter case, rotate and re-install.
!
Loading ...
Loading ...
Loading ...