Loading ...
Loading ...
Loading ...
31
ENGLISH
Speia Reuirements for
Manufatured or Moie Homes
Any installation in a manfacted o mobile home mst
comply with the Manfacted Home Constction and
dcw l bpbq rgjc 02 ADP* Np 106. mp l bpb
AL-A x02. F l b jmaj ambcq l b mpbgl l acq, Gd
yo ae ncetain whethe yo poposed installation
will comply with these standads, please contact a
sevice and installation pofessional fo assistance.
• eq bpwcp k sq c ncpk l cl jw af cb m f c djmmp,
• rf c cjcapgaj aml l cagml dmp l cjcapga bpwcp k sq
c 2gpc aml l cagml , mpc bcgjcb gl dmpk gml
concening the electical connection is povided in the
section Connecting Electic Dyes.
• rm pcbsac f c pgqi md amk sqgml l b dgpc* f c bpwcp
mst be vented to the otside.
• BM LMr tcl f c bpwcp sl bcp k l sdaspcb f mk c mp
mobile home.
• Cjcapga bpwcpq k w c tcl cb m f c msqgbc sqgl e f c
back, left, ight, o bottom panel.
• Eq bpwcpq k w c tcl cb m f c msqgbc sqgl e f c
back, left, o bottom panel. Gas dyes may not be
vented to the otside sing the ight side panel
becase of the bne hosing.
• rf c bpwcp cvf sq bsa k sq c ddgvcb qcaspcjw m
the manfacted o mobile home stcte, and the
ehast dct mst be made of a mateial that will esist
fie and combstion.
It is ecommended that yo se a igid o fleible metal
dct.
• BM LMr aml l ca f c bpwcp cvf sq bsa m l w mf cp
dct, vent, chimney, o othe ehast dct.
• i c qspc f c bpwcp f q bcosc aacqq m msqgbc
fesh ai to ense pope opeation. The opening fo
msqgbc dpcqf gp k sq c jcq 03 gl
0
/ 41 ak
0
).
• G gq gk nmpl f f c ajcpl ac md f c bsa dpmk l w
amk sqgjc aml qpsagml c jcq 0 gl af cq 3 ak *
and when venting the dye to the otdoos, the dye
al c gl qjjcb gf ajcpl ac md / gl af 0,3 ak
the sides and back of the dye.
• Njcqc c pc f tcl gl e k cpgjq pc l m qsnnjgcb
with the dye. Yo shold obtain the venting mateials
necessay fo pope installation.
Fina Instaation Che
Once yo have completed the installation of the dye
and it is in its final location, confim pope opeation
with the following tests and Installation Test (Dct
Check) on the following page.
Testing dryer heating
E MBC
Close the dye doo, pess the On/Off btton to tn the
dye on, and stat the dye on a heat setting.
When the dye stats, the ignite shold ignite the main
bne.
C CARPGA MBC
Close the dye doo, pess the On/Off btton to tn
the dye on, and stat the dye on a heat setting. The
ehast ai shold be wam afte the dye has been
mncpgl e dmp 1 k gl scq,
Checking airflow
Effective dye opeation eqies pope aiflow.
The adeqacy of the aiflow can be meased by
evalating the static pesse. Static pesse in the
ehast dct can be meased with a manomete,
njacb ml f c cvf sq bsa nnpmvgk cjw 0 d, 4. ,7 ak
fom the dye.
ga npcqqspc gl f c cvf sq bsa qf msjb l m cvaccb . ,4
gl af cq / ,3 ak , rf c bpwcp qf msjb c af cai cb f gjc f c
dye is nning with no load.
Checking levelness
Once the dye is in its final location, echeck the dye
to be se it is level. Make se it is level font to back
l b qgbc m qgbc* l b f jj 2 jctcjgl e dcc pc dgpk jw ml
the floo.
NOTE
If all ai is not pged fom the gas line, the gas ignite
may tn off befoe the main bne ignites. If this
happens, the ignite will eattempt gas ignition afte
appoimately two mintes.
INSTALLATION INSTruCTIONS
MFL67731040_en_170712.indd 31 2017.7.12 5:17:59 PM
Loading ...
Loading ...
Loading ...