Friedrich WSE Wall Sleeve

User Manual - Page 2

For WSE.

PDF File Manual, 7 pages, Read Online | Download pdf file

WSE photo
Loading ...
INSTALLATION REQUIREMENTS:
STEP 1 The "WSE" SLEEVE should be positioned so that the DRAIN EXTENSION extends a minimum of 9/16" beyond the
OUTSIDE WALL (See Figure 1).
STEP 2 The "WSE" SLEEVE must extend a minimum of 7/8" beyond the INSIDE WALL.
STEP 3 The "WSE" SLEEVE must be installed level side to side.
STEP 4 The "WSE" SLEEVE must also be installed with a downward tilt toward the outside of the building. If a level is placed
so that it rests on the FRONT and BACK UNIT REST as shown in Figure 2, a properly installed unit provides a
3/8” slope to the outside
of the building.
CAU
TION: SLEEVE projections and leveling precautions must be observed to prevent the entry of water into the room.
FIGURE
2
SLE
EVE INSTALLATION:
STEP 1 After unpacking the "WSE" SLEEVE from the carton, remove the FRONT PANEL.
For immediate installation of sleeve and chassis (skip if installing chassis into sleeve at a later date):
Remove the rear WEATHER PANEL. Reverse grille and place lower edge into sleeve tab (Friedrich logo facing
out). Align slots with screw holes. Secure grille with screws.
Place "WSE" SLEEVE in the wall opening following the instructions given in the INSTALLATION
REQUIREMENTS section. Attach the SLEEVE to the INSIDE WALL by driving two #12A x 2" screws in each side
of the SLEEVE (see Figure 1.). Shim at the top of the SLEEVE, midway between the sides. Drive one #12A x 2"
screw in the top of the sleeve, close to the shim. Install screws from inside the SLEEVE. If the wall opening is not
framed with wood, use expansion anchor bolts or molly (toggle) bolts (not provided).
STEP 2
Once the SLEEVE has been installed, check the LEVEL again to be sure the 3/8” slope downward tilt is mainta
ined.
Apply shims, if required, to maintain the proper slope.
STEP 3 Caulk the perimeter of the entire opening on the inside and the outside between the SLEEVE and the WALL.
STEP 4 The front panel removed in Step 1 above must be remounted back in place if masonry work is to be done
and/or if the "WSE" CHASSIS is to be installed at a later date.
2
SHIM TO
PROPER SPACING
FRONT UNIT REST
LEVEL
BACK UNIT REST
CAULK
(AS NEEDED)
CAULK
(AS NEEDED)
CAULK
(AS NEEDED)
BACK OF UNIT
FRONT OF UNIT
3/8 SLOPE
Loading ...
Loading ...
Loading ...