Friedrich PZE09K3SB Electric Heat Packed Terminal Air Condit

User Manual - Page 4

For PZE09K3SB.

PDF File Manual, 31 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
4
GeneralSpecifications
Typical Unit Components and Dimensions
MODEL NUMBER
3
Series
PZ = Friedrich Digital PTAC
System
E = Cooling with electric heat
H = Heat Pump with Auxiliary Heat
Nominal Capacity
Engineering Digit
Design Series
Chassis
S = Standard
07 = 7,000 Btuh
09 = 9,000 Btuh
Voltage
12 = 12,000 Btuh
15 = 15,000 Btuh
Nominal Heater Size (230V or 265V)
3 = 3 KW
5.0 kw only available on 15,000 BTU models
K = 230/208V - 1 Ph. - 60 Hz.
R = 265V - 1 Ph. - 60 Hz.
InstallationChecklist
Inspect all components and accessories for damage before and after
installation.
Remove the cardboard wall sleeve support and grill weatherboard.
Check for proper wall sleeve installation in accordance with the wall
sleeve installation instructions.
Check for a subbase kit or other means of structural support which
is required for ALL installations projecting more than 8" into room.
Install the recommended Condensate Drain Kits for complete
condensate removal.
Ensure that the chassis is installed in a 16" high x 42” wide wall sleeve
that is no deeper than 13 ¾".A baffle kit is required if the sleeve
exceeds that depth.
Ensure that chassis and chassis front cover are installed and secured
properly.
Ensure that drapes, bed, bedspread, furniture, etc.DO NOT block
either return or discharge air grilles.
Inspect the condenser air inlet and outlet for any obstructions
(shrubbery, etc ).
Ensure that 'reset' button is pressed on LCD device (only on cord
connected models).
B
OUTDOOR GRILLE
WALL SLEEVE
DISCHARGE GRILLE
FILTERS
RETURN AIR GRILLE
CHASSIS
FRONT COVER
Loading ...
Loading ...
Loading ...