Zephyr AK9434BS Monsoon 36" Stainless Steel Connect Insert

User Manual - Page 14

For AK9434BS.

PDF File Manual, 88 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
14
Monsoon Connect Use, Care, and Installation Guide
MONSOON
CONNECT
INSERT
CORE
Installation Instructions
Preparation & Installation
At least two installers are required due to the
weight and size of the liner.
CAUTION
1. Remove all packing materials and protective
film prior to installation. Use caution during
installation to prevent scratches or damage to
the stainless steel. Remove safety screw on top
of hood body.
2. Cut out an opening in the bottom of the
cabinet by following the dimensions in FIG. B.
3. Prepare liner for installation into cabinet by
following the steps on page 15-16 for vertical
ducting and 17-19 for horizontal ducting and
20-22 for dual blower installation, if desired.
4. Lift liner into bottom opening of cabinet and
secure to interior of cabinet using (8) #8 x 1/2”
stainless steel screws; (4) screws in the front
and (4) screws in the sides. FIG. C.
28-3/8” or 34-3/8” or 40-3/8” or 46-1/4”
19
-
3/
8
cut o
u
t
(AK9428)
(AK9434)
(AK9446)
(AK9440)
1/4 po
1-1/8 po
Make sure the surface you are securing the liner
to is capable of holding the weight of AK94.
Failure to do so may cause personal injury or
damage to cooking surface or counter.
WARNING
FIG. B
FIG. C
5. If using RF remote control, remove the light panel by (5) screws and extend the blue antenna wire.
There is no need to secure it. Reinstall light panel.
6. Finalize installation of electrical and duct work. Seal duct work with certified aluminum duct tape.
Power on liner, check for leaks around duct tape and verify proper operation.
NOTE: If access to top of liner is not available after installation, electrical and duct work connection
may need to be made prior to installing the liner.
7. Re-install the previously removed bottom panel, side spacer panels (if applicable), grease tray,
and bae filters.
Loading ...
Loading ...
Loading ...