Loading ...
Loading ...
Loading ...
27
EN
INSTALLING KEG TAP
Make sure the black pull handle of the tap is in the closed (up) position before
of the beer keg and turn clockwise ¼ to lock it into position (Fig. 2 - below). This
means that it is secured to the keg.
2 When connecting the beer line, it is very important that the black rubber washer
be installed inside the wing nut before connecting the beer line to the tap ( See
Illustration A below). Remove the black rubber protective cap located on top of tap
(Fig.2 - below).
the tube by using the remaining self-locking plastic snap-on clamp to ensure that
Make sure the beer tower faucet is in the closed (handle pointing straight back)
position before connecting the tap to the keg. To secure the tank connection, pull the
tapping handle out and push down until it locb into position. Listen for the „click“ of
will open the beer and CO2 gas valves. The keg is now tapped.
interior cabinet. Slide the beer keg slowly, ensuring that it is properly located (Fig.
Fig. 1 Fig. 2 Fig. 3
Fig. 4 Fig. 5
Loading ...
Loading ...
Loading ...