Zephyr AK7748AS Titan Pro 48" Stainless Steel Island Hood

Use, Care, and Installation Guide - Page 13

For AK7748AS. Also, The document are for others Zephyr models: AK7736AS, AK7742AS

PDF File Manual, 46 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
11
Installation – Mounting the Hood
1
Top Duct Covers
Top Support Frame
Bottom Duct Covers
Bottom Support Fram
e
6. Remove tape securing electronics mounting bracket to hood and reposition electronics mounting bracket
with (2) M4 x 8 screws (FIG. G). Install electrical and duct work. A cable lock, not supplied, might be
required by local codes (FIG. G). Seal duct work with aluminum duct tape.
7. Power up hood, verify all functions and check for leaks around duct tape.
8. Assemble Top Duct Covers (with louver holes) together over Top Support Frame, secure Top Duct Covers
together by magnetic strips.
9. Secure Top Duct Covers to Top Support Frame by using (4) 3/16 x 1/4” screws (2 screws for each Top Duct
Cover). (FIG. H).
10. Assemble Bottom Duct Covers together over Top Duct Covers and secure together by magnetic strips.
Bottom Duct Covers should rest on top of the Hood Body.
FIG. H
Cable Lock
Front
Side
Cable Lock
A cable locking connector (not
supplied) might be required by
local codes. Check with local
requirements and codes, purchase
and install appropriate connector if
necessary.
FIG. G
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance
with all applicable codes and standards. This range hood must
be
properly
grounded. Turn off electrical power at service entrance before wiring
.
!
Loading ...
Loading ...
Loading ...