Zephyr AK7748AS Titan Pro 48" Stainless Steel Island Hood

Use, Care, and Installation Guide - Page 11

For AK7748AS. Also, The document are for others Zephyr models: AK7736AS, AK7742AS

PDF File Manual, 46 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
9
Installation – Mounting the Hood
1. Determine mounting location on ceiling and temporarily tape paper template (included with the hood) to
the ceiling. Cut out internal shaded area of template to allow the ducting and electrical to pass through.
If necessary, add wood blocking (min. 2” x 4”) to ceiling joists located behind the drywall to reinforce the
mounting location*. (FIG. A1) Secure (2) M6 x 2” wood screws with washers to points A and B of the paper
template (FIG. B). Do not completely tighten screws, leave approx. 1/4” exposed.
2. Remove screws securing top and bottom support frames together. Adjust support frame to accomodate the
desired hood height and re-assemble the frame using the previously removed screws (4 screws for each
support frame arm). (FIG. A3)
*Hood is intended to be mounted to a nished ceiling.
CAUTION: At least two installers are
required
due to the weight and size of the
hood.
!
FIG. A
XP022220
A
B
Cut-Out Shaded Area
FIG. B
FRONT
Loading ...
Loading ...
Loading ...