Loading ...
Loading ...
Loading ...
8
8. INSTALL ROUGH-IN PLATE
Refer to the instructions included with the selected blower/rough-in kit (sold
separately) for details on installing the rough-in plate. Install the rough-in plate so
that the wiring box is located on the right side as you are facing the hood.
Attach 10" round duct to rough-in plate.
CAUTION
Install rough-in plate using 4 x 10-32 locknuts and washers included in hood parts bag. Discard nuts provided with
rough-in plate.
HD0480
LOCKNUTS
9. CONNECT WIRING
Remove wiring cover from rough-in plate and set aside.
Connect BLACK to BLACK, WHITE to WHITE and GREEN or bare wire under GREEN ground screw.
Reinstall wiring cover.
WARNING
!
Risk of electric shock. Electrical wiring must be done by qualified personnel in accordance with all applicable
codes and standards. Before connecting wires, switch power off at service panel and lock service disconnecting
means to prevent power to be switched on accidentally.
WATERPROOF WIRE CONNECTORS INSTRUCTIONS:
1. Strip wires 3/8".
2. Align frayed strands or conductors.
3. Do not pre-twist. Place stripped wires together with ends even, but lead smaller stranded wires slightly ahead of larger solid or
stranded wire.
4. Twist connector onto wires pushing firmly until hand-tight. DO NOT over torque.
5. When inserting wires into connectors, some sealant may leak out. Wipe off excess sealant in and around conductors. DO NOT REUSE.
10. INSTALL BLOWER
Refer to instructions included with blower.
Once the blower is installed, plug the blower cord (A) into the female receptacle and the power supply cord (B) onto the male connector
inside the hood.
HE0078
AB
WARNING
!
Do not plug the two cords into each other.
Loading ...
Loading ...
Loading ...