Loading ...
Loading ...
Loading ...
8. WIRING PREPARATION:
a) Install an appropriate 1/2” UL listed electrical wire clamp through each motor box electrical
opening on top of the hood.
b) Install electrical wiring from the service panel to the hood location for each motor box.
Consult the connection diagrams (on previous page) for further details on electrical
placement. See “ELECTRICAL SUPPLY AND GROUNDING” on page1 for power
requirements.
Method 1: Extend wiring to 30” above the countertop. Electrical connection(s) will occur
after the hood is installed on the wall.
Method 2: Extend wiring to the hood. Electrical connection(s) will occur before the hood is
installed on the wall.
9. Mark the wall at the lower edge of the hood opening:
a) If using a duct cover:
i. Carefully remove the knockouts from the top four corners of the hood.
ii. Remove the duct cover from its packaging and remove the mounting screws from the
base of the duct cover.
iii. Place the duct cover on the top of the hood and secure it temporarily through the knock-
out openings using the mounting screws previously removed.
The front panel may be removed from the duct cover during handling to reduce weight.
b) Lift the hood (and duct cover assembly if used) to the location on the wall where it will be
installed.
c) Lightly mark the wall with a short, horizontal mark along the bottom edge of the hood.
d) When finished, remove the hood and duct cover assembly from the wall.
10. Find location of mounting strip:
a) On the back side of the hood, measure the distance between the bottom edge of the hood
and the top edge of the wood mounting strip.
b) Measure this distance above the horizontal mark made in Step 9 and lightly mark the wall
with a level, horizontal line.
c) Measure where the center (left to right) of the hood will be and mark the upper, horizontal
line on the wall with a short, vertical centerline.
11. Attach the mounting strip to the wall as follows:
a) Remove the screws inside the top of the back of the hood that retain the wood strip that is
recessed in the mounting channel. Note: Some retaining screws may be located behind the
blower(s).
b) Remove the wood mounting strip from the back of the hood and place the top edge of the
strip on the upper, level, horizontal line on the wall.
c) Referencing the vertical centerline from Step 10, place the mounting strip on the wall so it is
centered (left to right) in the space where the hood will be located. Mark the strip at two or
more stud locations, and drill clearance holes in the wood strip to prevent splitting.
d) Using proper hardware, attach the mounting strip to at least two wall studs.
Note: for 48” and larger hoods, three screws into studs are recommended.
INSTALLATION
(CONT.)
©2020 Hestan Commercial Corporation
14
EN
Loading ...
Loading ...
Loading ...