Goodman GR9S960603BN Gas Furnace 96% AFUE Single-Stage Upflow/Horizontal

Product's Documents

Below are documents related to this product, you can read online or download:
Installation Instruction Other Documents
GR9S960603BN photo

Installation Guide

This is the main product document for model GR9S960603BN.

The file format is pdf, 48 pages, you can download this manual here .

background
Installation Instructions
for *R9S96*U Ultra Low
NOx Gas Furnace
(Type FSP CATEGORY IV Direct
or Non Direct Vent Air Furnace)
(Type FSP CATÉGORIE IV Direct
ou four á air soufflé non direct)
19001 Kermier Rd., Waller, TX 77484
www.goodmanmfg.com • www.amana-hac.com
© 2024-2025 Daikin Comfort Technologies Manufacturing, L.P.
is a registered trademark of Maytag Corporation or its related companies
and is used under license. All rights reserved.
IOG-2040C
01/2025
These furnaces comply with requirements embodied
in the American National Standard/National Standard
of Canada ANSI Z21.47·CSA-2.3 Gas Fired Central
Furnaces.
Installer:
Ax all manuals
adjacent to the unit.
As a professional installer you have an obligation to know
the product better than the customer. This includes all
safety precautions and related items.
Prior to actual installation, thoroughly familiarize yourself
with this Instruction Manual. Pay special attention to all
safety warnings. Often during installation or repair it is
possible to place yourself in a position which is more
hazardous than when the unit is in operation.
Remember, it is your responsibility to install the product
safely and to know it well enough to be able to instruct a
customer in its safe use.
Safety is a matter of common sense...a matter of thinking
before acting. Most dealers have a list of specic good
safety practices...follow them.
The precautions listed in this Installation Manual are
intended as supplemental to existing practices. However,
if there is a direct conict between existing practices and
the content of this manual, the precautions listed here take
precedence.
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
WARNING
Do not bypass safety devices.
ONLY PERSONNEL THAT HAVE BEEN TRAINED TO INSTALL,
ADJUST, SERVICE, MAINTENANCE OR REPAIR (HEREINAF-
TER, “SERVICE”) THE EQUIPMENT SPECIFIED IN THIS MANUAL
SHOULD SERVICE THE EQUIPMENT.
THIS EQUIPMENT IS NOT INTENDED FOR USE BY PERSONS
(INCLUDING CHILDREN) WITH REDUCED PHYSICAL, SENSORY
OR MENTAL CAPABILITIES, OR LACK OF EXPERIENCE AND
KNOWLEDGE, UNLESS THEY HAVE BEEN GIVEN SUPERVISION
OR INSTRUCTION CONCERNING USE OF THE APPLIANCE BY A
PERSON RESPONSIBLE FOR THEIR SAFETY.
CHILDREN SHOULD BE SUPERVISED TO ENSURE THAT THEY
DO NOT PLAY WITH THE EQUIPMENT.
THE MANUFACTURER WILL NOT BE RESPONSIBLE FOR ANY
INJURY OR PROPERTY DAMAGE ARISING FROM IMPROPER
SUPERVISION, SERVICE OR SERVICE PROCEDURES. IF YOU
SERVICE THIS UNIT, YOU ASSUME RESPONSIBILITY FOR
ANY INJURY OR PROPERTY DAMAGE WHICH MAY RESULT. IN
ADDITION, IN JURISDICTIONS THAT REQUIRE ONE OR MORE
LICENSES TO SERVICE THE EQUIPMENT SPECIFIED IN THIS
MANUAL, ONLY LICENSED PERSONNEL SHOULD SERVICE
THE EQUIPMENT. IMPROPER SUPERVISION, INSTALLATION,
ADJUSTMENT, SERVICING, MAINTENANCE OR REPAIR OF THE
EQUIPMENT SPECIFIED IN THIS MANUAL, OR ATTEMPTING
TO INSTALL, ADJUST, SERVICE OR REPAIR THE EQUIPMENT
SPECIFIED IN THIS MANUAL WITHOUT PROPER SUPERVISION
OR TRAINING MAY RESULT IN PRODUCT DAMAGE, PROPERTY
DAMAGE, PERSONAL INJURY OR DEATH.
WARNING
WARNING
This furnace may be paired with a cooling unit that uses R-32
refrigerant. If the cooling unit paired with this furnace
does not use R-32, the R-32 function control board needs
to be turned off. Please see the electrical and the R-32 sec-
tions for more details. Refrigerant systems other than 410A
or R32 may require an additional mitigation control board.
Refer to the installation manual of the indoor evaporator
coil to determine installation requirements for that suppli-
er’s refrigerant detection system.
background
2
SAFETY CONSIDERATIONS
IMPORTANT NOTE: This unit is designed to
meet the NOX requirement of 14Ng/J maximum
as required by the South Coast Air Quality
Management District and the San Joaquin Valley
Air Pollution Control District, both in the State
of California, and is intended for installation in
those districts only.
This unit has a Control System that compensates for
certain installation and environmental conditions. This unit
must:
• Be properly installed, operated, and maintained per
the instructions.
• Be serviced only by properly trained service
technicians.
This unit is not approved for use with gases other than
Natural Gas.
Units that are not installed, maintained, or operated
properly may result in “noisy” operation during the heating
cycle. If this unit is making unusual or objectionable noises
during the heating cycle, turn the heat o󰀨 at the thermostat
and contact a qualied service organization right away.
Adhere to the following warnings and cautions when
installing, adjusting, altering, servicing, or operating the
furnace. To ensure proper installation and operation,
thoroughly read this manual for specics pertaining to the
installation and application of this product.
Table of Contents
Safety Considerations .................................................2
Product Application ......................................................5
Location Requirements & Considerations ................5
Combustion & Ventilation Air Requirements............7
Installation Positions ...................................................8
Horizontal Applications & Considerations ...............8
Vent Pipe & Combustion Air Pipe ..............................10
Condensate Drain Lines & Drain Trap .....................17
Electrical Connections ..............................................20
Gas Supply and Piping .................................................22
Circulating Air & Filters ............................................24
R32 Function ..................................................................26
Start-up Procedure & Adjustment ............................27
Normal Sequence of Operation ................................33
Operational Checks .....................................................34
Safety Circuit Description ........................................34
Troubleshooting ..........................................................35
Maintenance ..................................................................36
Filters .............................................................................36
Before leaving an installation .................................37
Repair and Replacement Parts ..................................37
Troubleshooting Chart ..............................................38
Airflow Tables ............................................................41
Wiring Diagram .............................................................43
Start-Up Check List .....................................................44
This furnace is manufactured for use with natural gas only.
Install this furnace only in a location and position
as specied in LOCATION REQUIREMENTS &
CONSIDERATIONS section and INSTALLATION
POSITIONS section of this manual.
Provide adequate combustion and ventilation air to the
furnace as specied in COMBUSTION & VENTILATION
AIR REQUIREMENTS section of this manual.
Combustion products must be discharged to the outdoors.
Connect this furnace to an approved vent system only, as
specied in VENT/FLUE PIPE & COMBUSTION AIR PIPE
section of this manual.
Never test for gas leaks with an open ame. Use a
commercially available soap solution made specically for
the detection of leaks to check all connections, as specied
in GAS SUPPLY AND PIPING section of this manual.
Always install a furnace to operate within the furnace’s
intended temperature-rise range with a duct system which
has external static pressure within the allowable range, as
specied on the furnace rating plate and OPERATIONAL
CHECKS section of these instructions.
When a furnace is installed so that supply ducts carry
air circulated by the furnace to areas outside the space
containing the furnace, the return air shall also be handled
by duct(s) sealed to the furnace casing and terminating
outside the space containing the furnace.
A gas-red furnace for installation in a residential
garage must be installed as specied in the LOCATION
REQUIREMENTS AND CONSIDERATIONS section of
this manual.
This furnace cannot be used as a construction site heater.
CAUTION
FROZEN AND BURST WATER PIPE HAZARD
Failure to protect against the risk of freezing may result
in property damage. Special precautions MUST be made if
installing in an area which may drop below freezing. This
can cause improper operation or damage to equipment. If
the furnace environment has the potential of freezing,
the drain trap and drain line must be protected. The use of
electric heat tape and/or pipe insulation is recommended
for these installations.
WARNING
To prevent personal injury or death due to improper instal-
lation, adjustment, alteration, service or maintenance, refer
to this manual. For additional assistance or information,
consult a qualified installer, servicer agency or the gas
supplier.
background
3
WARNING
To prevent possible property damage, personal injury or
death due to electrical shock, the furnace must be located
to protect the electrical components from water.
Drain trap must be primed at time of installation. Trap is
internally partitioned; add water to both inlet ports until
water appears at both sides of the outlet opening. Failure
to prime trap at time of installation may have a negative
e󰀨ect on combustion quality and pressure switch action.
WARNING
Heating unit should not be utilized without reasonable,
routine, inspection, maintenance and supervision. If the
building in which any such device is located will be vacant,
care should be taken that such device is routinely inspect-
ed, maintained and monitored. In the event that the building
may be exposed to freezing temperatures and will be vacant,
all water-bearing pipes should be drained. The building
should be properly winterized and the water source closed.
In the event that the building may be exposed to freezing
temperatures and will be vacant, any hydronic coil units
should be drained as well and, in such case, alternative
heat sources should be utilized.
WARNING
If the information in these instructions is not followed
exactly, a fire or explosion may result causing property dam-
age, personal injury or loss of life.
- do not store or use gasoline or other flammable vapors
and liquids in the vicinity of this or any other appliance.
- WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
• Do not touch any electrical switch; do not use any phone
in your building.
• Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions. If you can-
not reach your gas supplier, call the fire department.
- Installation and service must be performed by a qualified
installer, service agency or the gas supplier.
WARNING
Should overheating occur or the gas supply fail to shut
off, turn off the manual gas shutoff valve external to the
furnace before turning of the electrical supply.
AVERTISSEMENT
RISQUE D’INCENDIE OU D’EXPLOSION
Si les consignes de sécurité ne sont pas suivies à la
lettre,cela peut entraîner la mort, de graves blessures ou
des dommages matériels.
– Ne pas entreposer ni utiliser d’essence ni autres vapeurs
ou liquides inflammables à proximité de cet appareil ou
de tout autre appareil.
– QUE FAIRE SI UNE ODEUR DE GAZ EST DÉTECTÉE
• Ne mettre en marche aucun appareil.
• Ne toucher aucun interrupteur électrique; ne pas utilis-
er de téléphone dans le bâtiment.
• Quitter le bâtiment immédiatement.
• Appeler immédiatement le fournisseur de gaz en util-
isant le téléphone d’un voisin. Suivre les instructions du
fournisseur de gaz.
• Si le fournisseur de gaz n’est pas accessible, appeler le
service d’incendie.
– L’installation et l’entretien doivent être effectués par
un installateur ou une entreprise d’entretien qualifié,
ou le ournisseur de gaz.
WARNING
Possibility property damage, personal injury or death due
to fire, explosion, smoke, soot, condensation, electrical
shock or carbon monoxide may result from improper instal-
lation, repair operation, or maintenance of this product.
Failure to follow the safety warnings exactly could re-
sult in serious injury, death or property damage.
Never test for gas leaks with an open flame.
Use a commercially available soap solution made specifi-
cally for the detection of leaks to check all connections.
A fire or explosion may result causing property damage,
personal injury or loss of life.
WARNING
FIRE OR EXPLOSION HAZARD
AVERTISSEMENT
RISQUE D’INCENDIE OU D’EXPLOSION
Si les consignes de sécurité ne sont pas suivies à la lettre,
cela peut entraîner la mort, de graves blessures ou des
dommages matériels.
Ne jamais vérifier la présence de fuites de gaz au moyen
d’une flamme nue. Vérifier tous les raccords en utilisant
une solution savonneuse commerciale conçue spécialement
pour la détection de fuites. Un incendie ou une explosion
risque de se produire, ce qui peut entraîner la mort, des
blessures ou des dommages matériels.
background
4
Shipping Inspection
All units are securely packed in shipping containers
tested according to International Safe Transit Association
specications. The carton must be checked upon arrival
for external damage. If damage is found, a request for
inspection by the carrier’s agent must be made in writing
immediately.
The furnace must be carefully inspected on arrival for
damage and bolts or screws which may have come loose
in transit. In the event of damage the consignee should:
1. Make a notation on delivery receipt of any visible
damage to shipment or container.
2. Notify the carrier promptly and request an inspection.
3. With concealed damage, the carrier must be notied
as soon as possible - preferably within ve days.
4. File the claim with the following support documents
within a nine-month statute of limitations.
• Original or certied copy of the Bill of Lading, or
indemnity bond.
• Original paid freight bill or indemnity in lieu thereof.
• Original or certied copy of the invoice, showing
trade and other discounts or reductions.
• Copy of the inspection report issued by the
carrier’s representative at the time damage is
reported to carrier.
Electrostatic Discharge (ESD) Precautions
NOTE: Discharge your body’s static electricity
before touching unit. An electrostatic discharge
can adversely affect electrical components.
Use the following precautions during furnace installation
and servicing to protect the integrated control module
from damage. By putting the furnace, the control, and the
person at the same electrostatic potential, these steps
will help avoid exposing the integrated control module to
B10259-216
CO can cause serious illness including permanent brain
damage or death.
Advertencia especial para la instalación de calentadores ó manejadoras
de aire en áreas cerradas como estacionamientos ó cuartos de servicio.
B10259-216
El monóxido de carbono puede causar enfermedades severas
como daño cerebral permanente ó muerte.
Las emisiones de monóxido de carbono pueden circular a través
del aparato cuando se opera en cualquier modo.
B10259-216
RISQUE D'EMPOISONNEMENT AU
MONOXYDE DE CARBONE
Le monoxyde de
des
carbone peut causer des maladies graves telles que
dommages permanents au cerveau et meme la mort.
Cette ventilation est nécessaire pour éviter le danger d'intoxication
au CO pouvant survenir si un appareil produisant du monoxyde
de carbone continue de fonctionner au sein de la zone confinée.
electrostatic discharge. This procedure is applicable to both
installed and non-installed (ungrounded) furnaces.
1. Disconnect all power to the furnace. Do not touch
the integrated control module or any wire connected
to the control prior to discharging your body’s
electrostatic charge to ground.
2. Firmly touch a clean, unpainted, metal surface of the
furnace near the control. Any tools held in a person’s
hand during grounding will be discharged.
3. Service integrated control module or connecting
wiring following the discharge process in step 2.
Use caution not to recharge your body with static
electricity; (i.e., do not move or shu󰀪e your feet, do
not touch ungrounded objects, etc.). If you come in
contact with an ungrounded object, repeat step 2
before touching control or wires.
4. Discharge your body to ground before removing
a new control from its container. Follow steps 1
through 3 if installing the control on a furnace.
Return any old or new controls to their containers
before touching any ungrounded object.
To The Installer
Before installing this unit, please read this manual
thoroughly to familiarize yourself with specic items which
must be adhered to, including but not limited to: unit
maximum external static pressure, gas pressures, BTU
input rating, proper electrical connections, circulating air
temperature rise, minimum or maximum CFM, and motor
speed connections.
WARNING
To prevent property damage, personal injury or death due
to fire, do not install this furnace in a mobile home, trailer,
or recreational vehicle.
background
5
NOTE: This unit should be installed in a
manner so that it is not accessible to the
public.
PRODUCT APPLICATION
This furnace is primarily designed for residential home-
heating applications. It is NOT designed or certied for
use in mobile homes, trailers or recreational vehicles.
Neither is it designed or certied for outdoor applications.
The furnace must be installed indoors (i.e., attic space,
crawl space, or garage area provided the garage area is
enclosed with an operating door).
This furnace can be used in the following non-industrial
commercial applications:
Schools, O󰀩ce buildings, Churches, Retail stores,
Nursing homes, Hotels/motels, Common
or o󰀩ce areas.
In such applications, the furnace must be installed with the
following stipulations:
• It must be installed per the installation instructions
provided and per local and national codes.
• It must be installed indoors in a building constructed
on site.
• It must be part of a ducted system and not used in a
free air delivery application.
• It must not be used as a “make-up” air unit.
• It must be installed as a two-pipe system for
combustion air.
• All other warranty exclusions and restrictions apply
This furnace is an ETL certied appliance and is
appropriate for use with natural gas.
Dual certication means that the combustion air inlet pipe
is optional and the furnace can be vented as a:
• Non-direct vent (single pipe) central forced air
furnace in which combustion air is taken from the
installation area or from air ducted from the outside
or,
• Direct vent (dual pipe) central forced air furnace
in which all combustion air supplied directly to the
furnace burners through a special air intake system
outlined in these instructions.
This furnace cannot be used as a construction site heater.
To ensure proper furnace operation, install, operate
and maintain the furnace in accordance with these
installation and operation instructions, all local
building codes and ordinances. In their absence, follow
the latest edition of the National Fuel Gas Code (NFPA
54/ANSI Z223.1), Installation Codes, local plumbing or
wastewater codes, and other applicable codes.
A copy of the National Fuel Gas Code (NFPA 54/ANSI
Z223.1) can be obtained from any of the following:
American National Standards Institute
23 West 43rd Street, 4th Floor
New York, NY 10036
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
CSA International
8501 East Pleasant Valley
Independence, OH 441311
The rated heating capacity of the furnace should be greater
than or equal to the total heat loss of the area to be heated.
The total heat loss should be calculated by an approved
method or in accordance with “ASHRAE Guide” or “Manual
J-Load Calculations” published by the Air Conditioning
Contractors of America.
LOCATION REQUIREMENTS &
CONSIDERATIONS
Follow the instructions listed below and the guidelines
provided in the Combustion and Ventilation Air
Requirements section when selecting a furnace location.
WARNING
To prevent possible equipment damage, property damage,
personal injury or death, the following bullets points must
be observed when installing this unit.
WARNING
Possible property damage, personal injury or death due to
fire, explosion, smoke, soot, condensation, electrical shock
or carbon monoxide may result from improper installation,
repair operation, or maintenance of this product.
• Centrally locate the furnace with respect to the
proposed or existing air distribution system.
• Ensure the temperature of the return air entering
the furnace is between 55°F and 100°F when the
furnace is heating.
• Provide provisions for venting combustion products
outdoors through a proper venting system. Special
consideration should be given to vent/ue pipe
routing and combustion air intake pipe when
applicable. Refer to Vent/Flue Pipe and Combustion
Air Pipe -Termination Locations for appropriate
termination locations and to determine if the
piping system from furnace to termination can be
accomplished within the guidelines given. NOTE:
The length of ue and/or combustion air piping can
be a limiting factor in the location of the furnace.
• Locate the furnace so condensate ows downwards
to the drain. Do not locate the furnace or its
background
6
condensate drainage system in any area subject to
below freezing temperatures without proper freeze
protection. Refer to Condensate Drain Lines and
Trap for further details.
• Ensure adequate combustion air is available for
the furnace. Improper or insu󰀩cient combustion air
can expose building occupants to gas combustion
products that could include carbon monoxide. Refer
to Combustion and Ventilation Air Requirements.
• Set the furnace on a level oor to enable proper
condensate drainage. If the oor becomes wet or
damp at times, place the furnace above the oor
on a concrete base sized approximately 1-1/2” larger
than the base of the furnace. Refer to the Horizontal
Applications and Considerations for leveling of
horizontal furnaces.
• Ensure upow or horizontal furnaces are not installed
directly on carpeting, or any other combustible
material. The only combustible material allowed is
wood.
• Exposure to contaminated combustion air will result
in safety and performance-related problems. Do
not install the furnace where the combustion air is
exposed to the following substances:
Permanent wave solutions
Chlorinated waxes or cleaners chlorine-based
Carbon tetrachloride
Water softening chemicals
Swimming pool chemicals
Deicing salts or chemicals
Halogen type refrigerants
Printing inks
Cleaning solutions (such as perchloroethylene)
Paint removers
Varnishes
Hydrochloric acid
Cements and glues
Antistatic fabric softeners for clothes dryers
Masonry acid washing materials
• Seal o󰀨 a non-direct vent furnace if it is installed near
an area frequently contaminated by any of the above
substances. This protects the non-direct vent furnace
from airborne contaminants. To ensure that the
enclosed non-direct vent furnace has an adequate
supply of combustion air, vent from a nearby
uncontaminated room or from outdoors. Refer to the
Combustion and Ventilation Air Requirements for
details.
• If the furnace is used in connection with a cooling coil
unit, install the furnace upstream of the cooling coil.
• A coil installed above an upow furnace may be the
same width as the furnace or may be one size larger
than the furnace. Example: a “C” width coil may be
installed with a “B” width furnace.
• For all applications, the front of the coil and
furnace must face the same direction.
• If the furnace is installed in a residential garage,
position the furnace so that the burners and ignition
source are located not less than 18” above the
oor. Protect the furnace from physical damage by
vehicles.
• If the furnace is installed horizontally, ensure the
access doors are not on the “up/top” or “down/
bottom” side of the furnace.
• Do not connect this furnace to a chimney ue that
serves a separate appliance designed to burn solid
fuel.
Clearances and Accessibility
Clearances shall be in accordance with local installation
codes, the requirements of the gas supplier and the
manufacturer’s installation instructions.
Dégaugement conforme aux dodes d’installation locaux,
aux exigences du fournisseur de gaz et aux instructions
d’installation du fabricant.
NOTES:
• For servicing or cleaning, a 24” front clearance is
required.
• Unit connections (electrical, ue and drain) may
necessitate greater clearances than the minimum
clearances listed above.
• In all cases, accessibility clearance must take
precedence over clearances from the enclosure
where accessibility clearances are greater.
POSITION* SIDES REAR FRONT BOTTOM FLUE TOP
Upflow 0" 0" 3" C 0" 1"
Horizontal 6" 0" 3" C 0" 6"
C = If placed on combustible floor, floor MUST be wood only.
*R9S96 M INIMUM CLEARANCES
TO COMBUSTIBLE MATERIALS (INCHES)
Table 1
Installations must adhere to the clearances to combustible
materials to which this furnace has been design certied.
The minimum clearance information for this furnace is
provided on the unit’s clearance label. These clearances
must be permanently maintained. Clearances must also
accommodate an installation’s gas, electrical, and drain
trap and drain line connections. If the alternate combustion
air intake or vent/ue connections are used additional
clearance must be provided to accommodate these
connections. Refer to Vent/Flue Pipe and Combustion Air
Pipe for details.
A furnace installed in a conned space (i.e., a closet or
utility room) must have two ventilation openings with a
total minimum free area of 0.25 square inches per 1,000
BTU/hr of furnace input rating. Refer to Specication
Sheet applicable to your model for minimum clearances
to combustible surfaces. One of the ventilation openings
must be within 12” of the top; the other opening must
be within 12” of the bottom of the conned space. In a
typical construction, the clearance between the door and
door frame is usually adequate to satisfy this ventilation
requirement.
background
7
TOP
BOTTOM
TOP
BOTTOM
Figure 1
Existing Furnace Removal
NOTE: When an existing furnace is removed from
a venting system serving other appliances, the
venting system may be too large to properly vent
the remaining attached appliances.
The following vent testing procedure is reproduced from
the American National Standard/National Standard of
Canada for Gas-Fired Central Furnaces ANSI Z21.47,
CSA-2.3 latest edition Section 1.23.1.
The following steps shall be followed with each appliance
connected to the venting system placed in operation, while
any other appliances connected to the venting system are
not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the National Fuel
Gas Code, ANSI Z223.1 instructions. Determine that
there is no blockage or restriction, leakage, corrosion
and other deciencies which could cause an unsafe
condition.
3. As far as practical, close all building doors and
windows and all doors between the space in which
the appliance(s) connected to the venting system are
located and other spaces of the building.
4. Close replace dampers.
5. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any
exhaust fans, such as range hoods and bathroom
exhausts, so they shall operate at maximum speed.
Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance
being inspected in operation. Adjust thermostat so
appliance shall operate continuously.
7. Test for spillage from draft hood appliances at the
draft hood relief opening after 5 minutes of main
burner operation. Use the ame of a match or
candle.
8. If improper venting is observed during any of the
above tests, the venting system must be corrected in
accordance with the National Fuel Gas Code ANSI
Z223.1/NFPA 54.
9. After it has been determined that each appliance
connected to the venting system properly vents when
tested as outlined above, return doors, windows,
exhaust fans, replace dampers and any other gas
burning appliance to their previous conditions of use.
If resizing is required on any portion of the venting system,
use the appropriate table in the latest edition of the
National Fuel Gas Code ANSI Z223.1 Installation Codes.
Thermostat Location
The thermostat should be placed approximately ve feet
from the oor on a vibration-free, inside wall in an area
having good air circulation. Do not install the thermostat
where it may be inuenced by any of the following:
• Drafts, or dead spots behind doors, in corners, or
under cabinets.
• Hot or cold air from registers.
• Radiant heat from the sun.
• Light xtures or other appliances.
• Radiant heat from a replace.
• Concealed hot or cold water pipes, or chimneys.
• Unconditioned areas behind the thermostat, such as
an outside wall.
Consult the instructions packaged with the thermostat for
mounting instructions and further precautions.
COMBUSTION & VENTILATION AIR
REQUIREMENTS
WARNING
To avoid property damage, personal injury or death, suffi-
cient fresh air for proper combustion and ventilation of
flue gases must be supplied. Most homes require outside air
be supplied into the furnace area.
Improved construction and additional insulation in buildings
have reduced heat loss by reducing air inltration and
escape around doors and windows. These changes have
helped in reducing heating/cooling costs but have created
a problem supplying combustion and ventilation air for
gas red and other fuel burning appliances. Appliances
that pull air out of the house (clothes dryers, exhaust
fans, replaces, etc.) increase the problem by starving
appliances for air.
House depressurization can cause back drafting or
improper combustion of gas-red appliances, thereby
exposing building occupants to gas combustion products
that could include carbon monoxide.
If this furnace is to be installed in the same space with
other gas appliances, such as a water heater, ensure there
is an adequate supply of combustion and ventilation air for
all appliances. Refer to the latest edition of the National
Fuel Gas Code NFPA 54/ANSI Z223.1 or applicable
provisions of the local building codes for determining the
combustion air requirements for the appliances.
background
8
Most homes will require outside air be supplied to the
furnace area by means of ventilation grilles or ducts
connecting directly to the outdoors or spaces open to the
outdoors such as attics or crawl spaces.
INSTALLATION POSITIONS
This furnace may be installed in an upright position
or horizontal on either the left or right side panel. Do
not install this furnace on its back. For upright upow
furnaces, return air ductwork may be attached to the side
panel(s) and/or basepan. For horizontal upow furnaces,
return air ductwork must be attached to the basepan.
For both upright or horizontal furnaces, return ductwork
must be attached to the basepan (top end of the blower
compartment). NOTE: Ductwork must never be attached
to the back of the furnace. Contact your distributor for
proper airow requirements and number of required
ductwork connections. Refer to “Recommended Installation
Positions” gure for appropriate installation positions,
ductwork connections, and resulting airow arrangements.
Alternate Vent/Flue Location
Figure 2A
Figure 2B
Figure 2C
Recommended Installation Positions
Auxiliary Drain Pan
An auxiliary/secondary drain pan should be installed
under a condensing furnace and/or indoor coil when any
potential leakage could cause damage to ceilings, oors
or other areas below the installation location. The auxiliary
drain pan should be at least 1-1/2 inches deep, 3 inches
larger than the unit and constructed of corrosion-resistant
material. The drain pan should have a drain line connected
to the pan and the drain line should be pitched downward
away from the pan a minimum of 1/8” per foot of drain line.
The drain line should terminate in a location where the
water dripping from the drain line will alert the occupant
that a problem exists. The auxiliary drain pan should also
be equipped with a water level detection device conforming
to UL 508 that will shut o󰀨 the equipment served prior to
overow of the pan.
For upow and horizontal installations, the furnace and/
or indoor coil should be installed so that the equipment is
at least 1-1/2 inches above the drain pan. Do not install
the furnace and/or indoor coil directly into the auxiliary/
secondary drain pan and do not use any wood product
in the drain pan to elevate the furnace. Bricks, 2-inch
concrete cap blocks, metal furnace stands, or furnace
blocks can be used to elevate the furnace. For an upow
furnace installation, seal the entire bottom of the furnace
before setting the furnace at least 1-1/2 inches above the
drain pan.
Failure to properly install an auxiliary/secondary drain pan
for a furnace and/or indoor coil can result in water damage
to components and the furnace’s metal cabinet.
background
9
HORIZONTAL APPLICATIONS &
CONSIDERATIONS
When installing a furnace horizontally, additional
consideration must be given to the following:
Furnace Suspension
If suspending the furnace from rafters or joists, use 3/8”
threaded rod and 2”x2”x3/8” angle iron as shown in the
following diagram. The length of rod will depend on the
application and the clearances necessary.
If the furnace is installed in a crawl space it must be
suspended from the oor joist or supported by a concrete
pad. Never install the furnace on the ground or allow it to
be exposed to water.
Figure 3
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each ap-
pliance connected to the venting system being placed into
operation could result in carbon monoxide poisoning or
death.
The following steps shall be followed with each appliance
connected to the venting system placed in operation, while
any other appliances connected to the venting system are
not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the National Fuel
Gas Code, ANSI Z223.1 or the Natural Gas and
Propane Installation Code, CSA B149.1-15 and these
instructions. Determine that there is no blockage
or restriction, leakage, corrosion and other
deficiencies which could cause an unsafe condition.
3. As far as practical, close all building doors and
windows and all doors between the space in which
the appliance(s) connected to the venting system
are located and other spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any
exhaust fans, such as range hoods and bathroom
exhausts, so they shall operate at maximum speed.
Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the
appliance being inspected in operation. Adjust
thermostat so appliance shall operate continuously.
7. Test for spillage from draft hood appliances at
the draft hood relief opening after 5 minutes of
main burner operation. Use the flame of a match or
candle.
8. If improper venting is observed during any of the
above tests, the venting system must be corrected
in accordance with the National Fuel Gas Code ANSI
Z223.1/NFPA 54 and/or National Gas and Propane
Installation Code CSA B149.1-15.
9. After it has been determined that each appliance
connected to the venting system properly vents
when tested as outlined above, return doors,
windows, exhaust fans, fireplace dampers and any
other gas burning appliance to their previous
conditions of use.
background
10
AVERTISSEMENT
RISQUE D’INTOXICATION AU MONOXYDE DE
CARBONE
Si les étapes décrites ci-dessous ne sont pas suivies pour
chacun des appareils raccordés au système de ventila-
tion au moment de sa mise en marche, cela peut entraîner
une intoxication au monoxyde de carbone ou la mort. Les
étapes suivantes doivent être suivies pour chacun des appa-
reils raccordés au système de ventilation au moment de sa
mise en marche, alors que tous les autres appareils rac-
cordés au système de ventilation ne sont pas en marche :
1. Sceller toutes les ouvertures inutilisées du
système de
ventilation.
2. Inspecter le système de ventilation afin de
vérifier si la taille et l’inclinaison par rapport à
l’horizontale sont conformes aux exigences du
National Fuel Gas Code, ANSI Z223.1/NFPA 54 ou du
Code d’installation du gaz naturel et du propane,
CSA B149.1 et à ces instructions. Vérifier qu’il n’y
a pas d’obstruction ou de restriction, de fuite, de
corrosion et d’autres problèmes qui pourraient
entraîner une situation dangereuse.
3. Si possible, fermer toutes les portes et fenêtres
du bâtiment ainsi que toutes les portes séparant
l’endroit où se trouvent les appareils raccordés
au système de ventilation et les autres zones du
bâtiment.
4. Fermer le registre des foyers.
5. Mettre les sécheuses en marche ainsi que tous
les autres appareils qui ne sont pas raccordés au
système de ventilation. Mettre en marche tous les
ventilateurs de tirage, comme celui des hottes de
cuisine et des salles de bains, et les régler à la
puissance maximale. Ne pas mettre en marche les
ventilateurs d’été.
6. Suivre les instructions d’allumage. Mettre en
marche l’appareil soumis à l’inspection. Régler
le thermostat de manière à ce que l’appareil
fonctionne en continu.
7. Vérifier la présence de fuite au niveau de
l’ouverture du coupe-tirage des appareils qui en
sont dotés après 5 minutes de fonctionnement
du brûleur principal. Utiliser la flamme d’une
allumette ou d’une bougie.
8. Si un problème de ventilation est observé pendant
l’un des essais décrits ci-dessus, des correctifs
doivent être apportés au système de ventilation
conformément au National Fuel Gas Code, ANSI
Z223.1/NFPA 54 et (ou) au Code d’installation du gaz
naturel et du propane, CSA B149.1.
9. Une fois qu’il a été déterminé que chaque appareil
raccordé au système de ventilation fonctionne
correctement au moyen des essais décrits ci-dessus,
les portes, les fenêtres, les ventilateurs, les
registres de foyer et tous les autres appareils de
combustion alimentés au gaz doivent être remis
dans leur état initial.
Front Cover Pressure Switch Tube Location
When a furnace is installed horizontally with left side down,
the front cover pressure switch tube must be re-located to
the lower port of the collector box cover.
1. Remove tube from front cover pressure switch and
collector box cover.
2. Remove rubber plug from bottom collector box port
and install on top collector box port.
3. Locate 24” x 1/4” tube in bag assembly.
4. Install one end on front cover pressure switch.
5. Route tube to lower port on collector box cover and
cut o󰀨 excess tubing.
Drain Trap and Lines
In horizontal applications the condensate drain trap is
secured to the furnace side panel, suspending it below the
furnace. A minimum clearance of 5.5” below the furnace
must be provided for the drain trap. Additionally, the
appropriate downward piping slope must be maintained
from the drain trap to the drain location. Refer to
Condensate Drain Trap and Lines for further details. If the
drain trap and drain line will be exposed to temperatures
near or below freezing, adequate measures must be taken
to prevent condensate from freezing.
Leveling
Leveling ensures proper condensate drainage from the
heat exchanger. For proper ue pipe drainage, the furnace
must be level lengthwise from end to end. The furnace
should have a slight tilt from back to front with the access
doors downhill from the back panel approximately 1/2” to
3/4”. The slight tilt allows the heat exchanger condensate,
generated in the secondary heat exchanger, to ow forward
to the secondary heat exchanger front cover.
1/2" - 3/4"
1/2" - 3/4"
EQUIPMENT SETTING
UNIT MUST BE LEVELLED SIDE-TO-SIDE.
UNIT MAY BE POSITIONED FROM LEVEL TO 1/2" TOWARD THE FRONT TO AID IN DRAINING
UPFLOW APPLICATION
HORIZONTAL APPLICATION
SIDE VIEW
FRONT VIEW
SIDE-TO-SIDE
LEVELLED
FRONT VIEW
HORIZONTAL POSITION
SIDE-TO-SIDE
LEVELLED
RETURN END VIEW
FRONT
Alternate Electrical and Gas Line Connections
This furnace has provisions allowing for electrical and gas
line connections through either side panel. In horizontal
applications the connections can be made either through
the “top” or “bottom” of the furnace.
background
11
Drain Pan
A drain pan must be provided if the furnace is installed
above a conditioned area. The drain pan must cover the
entire area under the furnace (and air conditioning coil if
applicable).
Freeze Protection
Refer to Horizontal Applications and Conditions - Drain
Trap and Lines.
VENT PIPE & COMBUSTION AIR PIPE
This manual will refer to the pipe that discharges products
of combustion to the outdoors as the “vent” pipe or
“ue” pipe. The pipe that supplies air for combustion
to the furnace will be referred to as the “intake” pipe or
“combustion air” pipe.
This furnace is dual certied and may be installed as a
non-direct vent (single pipe) or direct vent (dual pipe)
appliance.
WARNING
Upon completion of the furnace installation, carefully
inspect the entire flue system both inside and outside of the
furnace to assure it is properly sealed. Leaks in the flue
system can result in serious personal injury or death due
to exposure to flue products, including carbon monoxide.
WARNING
Failure to follow these instructions can result in bodily
injury or death. Carefully read and follow all instructions
given in this section.
WARNING
To avoid bodily injury, fire or explosion, solvent cements
must be kept away from all ignition sources (i.e., sparks,
open flames, and excessive heat) as they are combustible
liquids. Avoid breathing cements vapors or contact with
skin and/or eyes.
Materials
PVC, CPVC, or ABS pipe & ttings are typically used as
venting and intake pipe materials. All 90° elbows must
be medium or long radius types. A medium radius elbow
should measure ~3-1/16” minimum from the plane of one
opening to the center line of the other opening for 2”
diameter pipe, and ~4-9/16” minimum for 3” pipe.
In addition to these materials, Innoue® by Centrotherm
Eco Systems is also an approved vent and combustion
air materials for installations in the U.S.A. Manufacturers
Installation instructions for these products must be
followed. These products have specic instructions for
installing, joining and terminating. Do not mix materials
or components of one manufacturer with materials or
components of another manufacturer. Refer to the following
chart for plastic pipe & ttings specications
PVC ASTM STANDARD
SCHEDULE 40 PIPE D1785
SDR 21 or 26 PIPE D2241
SYSTEM 1738® (IPEX) D1784, UL 1738
SCHEDULE 40 FITTINGS D2466
SYSTEM 1738® FITTINGS D1784, UL 1738
ABS
SCHEDULE 40 PIPE D1527
SCHEDULE 40 FITTINGS D2468
CPVC
SCHEDULE 40 PIPE F441
SDR 21 or 26 PIPE F442
FITTINGS F438
POLYPROPYLENE
INNOFLUE® (CENTROTHERM) UL 1738
POLYPRO® (DURAVENT) ULC S636
PRIMER & SOLVENT CEMENT
PVC PRIMER F656
CPVC PRIMER F656
PVC SOLVENT CEMENT D2564
CPVC SOLVENT CEMENT F493
ABS SOLVENT CEMENT D2235
ABS / PVC / CPVC ALL PURPOSE CEMENT (FOR
PIPE & FITTINGS OF THE SAME MATERIAL)
D2564, D2235, F493
TRANSITION CEMENT FOR ABS to PVC or CPVC D3188
INSTALLATIONS IN CANADA
PVC & CPVC PIPE & FITTINGS
PVC & CPVC SOLVENT CEMENT
TRANSITION CEMENT
INNOFLUE® (CENTROTHERM)
POLYPRO® (DURAVENT)
SYSTEM 636® (IPEX)
VENTING MATERIAL REQUIREMENTS
ULC S636
Table 2
Installation
This furnace is manufactured with 2” CPVC vent & intake
couplings. Use transition cement to connect PVC or ABS
pipe to these ttings. For furnaces requiring installation
of 3” pipe, the transition from 2” to 3” should be made as
close to the furnace as possible, and only when the piping
is sloped enough to prevent condensation from collecting.
This furnace must not be connected to Type B, BW, or
L vent or vent connector, and must not be vented into a
masonry chimney. A masonry chimney may be used as
a chase or passageway for approved venting materials
providing the masonry chimney is not also being used to
vent products of combustion. Never common vent this
appliance with another appliance. Never use a vent which
is used by a solid fuel appliance.
Piping may run vertically or horizontally and must be
adequately supported to prevent strain on joints, sagging,
separation, and detachment from the furnace. Horizontal
runs of piping must be supported every three to ve
feet. Condensation within the furnace secondary heat
exchanger and in the vent pipe is a normal occurrence.
Vent pipe must be installed to maintain a minimum 1/4 inch
per foot downward slope toward the furnace to return
background
12
condensate to the furnace’s drain system. Condensation
may also occur in the intake pipe. This commonly takes
place during the summer months when humid air enters
an intake pipe that runs through a cool basement or other
conditioned space. Refer to intake pipe options for using
the RF000142 kit and managing condensation.
WARNING
To avoid bodily injury, fire or explosion, solvent cements
must be kept away from all ignition sources (i.e., sparks,
open flames, and excessive heat) as they are combustible
liquids. Avoid breathing cement vapors or contact with skin
and/or eyes.
PREFERRED
Figure 4
TRANSITION NO LESS
THAN 45 TO HORIZONTAL
PLANE TO AVOID CREATING
A WATER TRAP IN VENT
PIPING.
°
ACCEPTABLE
Figure 5
NO TRANSITION ON
HORIZONTAL PLANE,
THIS CREATES A
WATER TRAP AND
RESTRICTS FLUE
GASES
NOT ACCEPTABLE
Figure 6
Precautions should be taken to prevent condensate from
freezing inside the ue/vent pipe, combustion air intake
pipe and/or at the pipe terminations. All ue/vent and/
or combustion air piping exposed to temperatures below
35°F for extended periods of time should be insulated
with 1/2” thick closed cell foam. All vent/ue piping exposed
to outdoors in excess of the terminations permitted as
described in the provided installation manual should be
insulated with 1/2” thick closed cell foam. Inspect piping
for leaks prior to installing insulation. If the combustion air
intake or ue vent pipe is to be installed above a nished
ceiling or other area where dripping of condensate will
be objectionable, insulating the combustion air pipe may
be necessary. Use 1/2” thick closed cell foam insulation
where required. Refer to vent & intake options for using the
RF000142 kit and managing condensation.
Pipe Sizing
Consult table 3 to determine what diameter piping is
required for your installation. Lengths shown in table
3 apply to single pipe & two pipe installations. In a two
pipe installation do not add intake and vent pipe lengths
together. Both pipes would normally be equal in length, if
di󰀨erent, then the longest pipe must be within the limits of
table 3. It is preferable to up-size from 2” to 2.5” or 3” pipe
if the pipe length & elbow count are near maximum. This
will help avoid nuisance pressure switch opening caused
by prevailing winds & sudden changes in atmospheric
pressure.
1 2 3 4 5 6 7 8
2
95 90 85 80 75 70 65 60
3
103 96 89 82 75 68 61 54
2
90 85 80 75 70 65 60 55
3
158 151 144 137 130 123 116 109
2
55 50 45 40 35 30 25 20
3
151 144 137 130 123 116 109 102
(UP TO 4,999 FT ALTITUDE)
*R9S960805CU
MODEL
(in)
Number of Elbows
*R9S960403BU
*R9S960603BU
1 2 3 4 5 6 7 8
(5,000 - 7,500 FT ALTITUDE)
MODEL
Pipe Size
(in)
Number of Elbows
*R9S960403BU
*R9S960603BU
69 63 57
69
93 87 81 75
93 87 81
*R9S960805CU
3
3
3
100
100
80 73 67 61 55
75 63 57
49 43 37
Table 3
Vent Pipe Connection
The vent pipe outlet is sized to accept 2” pipe. Secure vent
pipe directly into the furnace tting with the appropriate
glue. Alternately, a small section of 2” pipe may be glued
in the furnace socket and a rubber coupling installed
to allow removal for future service. Piping should be
routed in a manner to avoid contact with refrigerant lines,
metering devices, condensate drain lines, etc. If necessary,
clearances may be increased by creating an o󰀨set using
two 45° elbows (Figure 7).
background
13
Increased Clearance Configuration
Figure 7
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
Combustion Air Pipe Connection
If the furnace is being installed without a combustion air
pipe, a 90° elbow should be used on the combustion air
intake to guard against blockage.
On up ow / horizontal models, secure the combustion
air intake pipe to the air intake coupling using a rubber
coupling supplied with the furnace. The rubber coupling
may be omitted by inverting the intake coupling and gluing
pipe directly to it. Piping may also be glued to the intake
coupling in its original position by using a plastic coupling.
VENT-DRAIN
Figure 8
Figure 9
Figure 10
Vent & Intake Options for Condensate Management
The RF000142 coupling (Figure 8) can be secured directly
to the furnace intake and/or vent piping if condensation
is a concern. If the RF000142 is used on the combustion
air inlet, it must be installed with the arrow pointing up. It
should be noted, the combustion air will actually be moving
in a direction opposite of the arrow on the RF000142
coupling. It must have a eld supplied, trapped drain tube
free-draining to proper condensate disposal location. A
loop in the drain tube can serve as a trap. The unused
background
14
RF000142 drain tting should be capped. A tee installed in
the vent and/or intake pipe is also an acceptable method
of capturing condensation. For vertical vent piping, a PVC
wye can be used for capturing condensation (see gure
10). Any of these options must have a eld supplied,
trapped drain tube or pipe, free-draining to proper
condensate disposal location. A loop in the drain tube can
serve as a trap.
Alternate Vent & Intake Pipe Connections
When installing a furnace horizontally with the left side
down, alternate ue and combustion air pipe connections
may be used. This method allows the ue and combustion
air piping to be run vertically through the side of the furnace
(facing up in horizontal left). The alternate vent location
is the 3” hole directly in line with the induced draft blower
outlet.
When using the horizontal alternate vent conguration, you
must use the RF000142 vent drain kit. See Figures 11 & 12
& follow steps below.
NOTE: In the horizontal left installation
position, a means of condensate collection must
be provided to keep vent pipe condensate from
entering the draft inducer housing. If the vent
drain elbow is eliminated from the installation,
the RF000142 kit must be used.
Insert flange. Cut 2 ½” long
.
RF000142
2 ½”
Figure 11
Vent/Flue Pipe Cut
Figure 12
WARNING
The rubber elbow is not designed to support a load. When
the rubber elbow is mounted externally to the furnace
cabinet, extreme care must be taken to adequately support
field-supported vent/flue piping, as damage can result in
leaks causing bodily injury or death due to exposure to
flue gases, including carbon monoxide.
CAUTION
Be sure not to damage internal wiring or other compo-
nents when reinstalling coupling and screws.
1. Remove the four screws from the vent pipe ange on
top the furnace.
2. Remove the internal elbow, vent pipe and gasket.
3. Cut the internal vent pipe 2 1/2” from the ange.
Discard the un-anged section.
4. Remove the 3” plastic plug (in line with the inducer
outlet) and insert it in the space vacated by removal
of the internal vent pipe.
5. Install the RF000142 drain coupling with arrow facing
up, on the draft inducer outlet.
6. Insert the 2 1/2” anged section of pipe with gasket
through the 3” hole and connect to RF000142 drain
coupling. Secure it with gear clamp provided.
7. Use the four self-tapping screws removed in step 1
to secure ange to cabinet.
8. Connect drain hose to the uncapped port on the
RF000142 coupling, refer to page 20, Section
entitled “Upow Model Installed Horizontally With
Left Side Down - Alternate” for drain connection
details.
Figure 13
background
15
When using the alternate venting location, either in a
horizontal left side down installation or a vertical installation
using down – venting, the alternate combustion air opening
can be used. A locating dimple is located on the right
side of the furnace cabinet. The locating dimple is 1-7/8”
measured from the front edge of the cabinet in line with the
knock out. To use the alternate combustion air location:
1. Remove screws and combustion air ange and
gasket from cabinet.
2. Insert the 3” cabinet plug from the drain bag
assembly in the unused combustion air hole.
3. Drill a pilot hole at the cabinet dimple (size dictated
by knockout tool used).
4. Use a knockout tool to create a 3” diameter hole.
5. Secure the combustion air ange and gasket to
the furnace cabinet using the self-tapping screws
removed in step 1.
Pipe Termination
Products of combustion must always be vented outside. A
vent pipe must never terminate in an attic, crawl space, or
any other part of a dwelling. Follow the vent pipe & intake
pipe termination requirements listed below as well as all
applicable local, State and National codes.
All terminations (vent and/or intake) must be located at
least 12” above ground level or the anticipated snow level.
All vent terminations (non-direct and direct vent) must
terminate at least 3 feet above any forced air inlet located
within 10 feet.
The vent termination of a non-direct vent application must
terminate at least 4 feet below, 4 feet horizontally from, or
1 foot above any door, window, or gravity air inlet into any
building.
The vent termination of a direct vent application must
terminate at least 12” from any opening through which ue
gases may enter a building (door, window, or gravity air
inlet).
The vent termination of vent pipe run vertically through a
roof must terminate at least 12” above the roof line (or the
anticipated snow level) and be at least 12” from any vertical
wall (including any anticipated snow build up).
A vent termination shall not terminate over public walkways
or over an area where condensate or vapor could create a
nuisance or hazard or could be detrimental to the operation
of regulators, relief valves, or other equipment.
The combustion air intake termination of a direct vent
application should not terminate in an area which is
frequently dusty or dirty.
Vent & combustion air pipes may terminate vertically
through a roof, or horizontally through an outside wall. The
combustion air intake and vent pipe can be terminated in
two di󰀨erent pressure zones. The intake vent can terminate
on one side of the building, while the ue vent can be
terminated on another side of the building or through
the roof. In addition, the combustion air intake can be
terminated in a su󰀩ciently ventilated attic. Vertical vent
pipe terminations should be as shown in gure 14.
The penetration of pipes through the roof must be sealed
water tight with proper ashing such as is used with a
plastic plumbing vent.
Horizontal vent pipe terminations should be as shown in
the following gures. To secure the pipe passing through
the wall and prohibit damage to piping connections, a
coupling should be installed on either side of the wall and
solvent cemented to a length of pipe connecting the two
couplings. The length of pipe should be the wall thickness
plus the depth of the socket ttings to be installed on the
inside and outside of the wall. The wall penetration should
be sealed with silicone caulking material.
background
16
12"
Non-Direct Vent
Vent/Flue Termination
No Terminations
Above Walkway
12"
min.
4'
min.
Non-Direct Vent
Vent/Flue Termination
Direct Vent
Vent/Flue Termination
<10'
Forced Air
Inlet
Non-Direct Vent
&
Direct Vent
Vent/Flue Terminations
Grade or Highest
Anticipated
Snow Level
3' min.
12" min.
4' min.
12" min.
Vent Termination Clearances
Figure 14
COMBUSTION AIR INTAKE
(OPTIONAL)
*Not required for
single pipe installation
TEE (OPTIONAL)
9
6
”
M
A
X
.
-
3
”
M
I
N
.
R
O
O
F
L
I
N
E
12” MIN
HEIGHT
DIFFERENCE
12” MIN TO ROOF OR
HIGHEST ANTICIPATED
SNOW LEVEL
Vertical Termination
Figure 15
STRAIGHT
ELBOWS
Figure 16
VENT/FLUE TEE (
or
45° ELBOW
TURNED DOWN or
90° ELBOW TURNED
DOWN
OPTIONAL)
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
12" MIN.
Horizontal Termination (Single Pipe)
Above Highest Anticipated Snow Level
Figure 17
12" MIN. TO GRADE OR
HIGHEST ANTICIPATED
SNOW LEVEL
6” MAX
10”- 24”
4” MIN
Standard Horizontal Terminations (Dual Pipe)
Figure 18
90°
ELBOWS
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
3” - 24”
Alternate Horizontal Vent Termination (Dual Pipe)
Figure 19
90°
ELBOWS
Combustion Air Intake may also be snorkeled
to obtain 12” min ground clearance.
Alternate Vent Termination Above Anticipated Snow Level
(Dual Pipe)
Figure 20
background
17
3” MIN
12” MIN TO GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL
3”MIN
24”MAX
12” MIN SE PARATION
Termination of Multiple Direct Vent Furnaces
Figure 21
Vent/Intake Terminations For Installation
of Multiple Direct Vent Furnaces
If more than one direct vent furnace is to be installed
vertically through a common roof top, maintain the same
minimum clearances between the exhaust vent and air
intake terminations of adjacent units as with the exhaust
vent and air intake terminations of a single unit.
If more than one direct vent furnace is to be installed
horizontally through a common side wall, maintain the
clearances as in the following gure. Always terminate all
exhaust vent outlets at the same elevation and always
terminate all air intakes at the same elevation.
Concentric Vent Termination Option
Refer to the directions provided with the Concentric Vent
Kit or IO-619 for installation specications.
Ve rtical Insta llation
H oriz onta l Installa tio n
Al lowabl e In stallation O rientati o n
Side Wall Vent Kit
Figure 22
Side Wall Vent Kit Option
This kit is to be used with 2” or 3” direct vent systems. The
vent kit must terminate outside the structure and may be
installed with the intake and exhaust pipes located side-
by-side or with one pipe above the other. These kits are
NOT intended for use with single pipe (non-direct vent)
installations.
Refer to the directions furnished with the Side Wall
Vent Kit (p/n 0170K00000S or 0170K00001S) for
installation specications.
CONDENSATE DRAIN LINES &
DRAIN TRAP
A condensing gas furnace achieves its high level
of e󰀩ciency by extracting heat from the products of
combustion to the point where condensation takes place.
The condensate must be collected in the furnace drain trap
and routed to an appropriate drain location in compliance
with local and national codes.
Follow the bullets listed below when installing the drain
system. Refer to the following sections for specic details
concerning furnace drain trap installation and drain hose
hook ups.
• The drain trap supplied with the furnace must be
used.
• The drain trap must be primed at time of installation.
• The drain line between furnace and drain location
must meet local and nation codes.
• The drain line between furnace and drain location
must maintain a 1/4 inch per foot downward slope
toward the drain.
• Do not trap the drain line in any other location than at
the drain trap supplied with the furnace.
• If the drain line is routed through an area which
may see temperatures near or below freezing,
precautions must be taken to prevent condensate
from freezing within the drain line.
• If an air conditioning coil is installed with the furnace,
a common drain may be used. An open tee must be
installed in the drain line, near the cooling coil, to
relieve positive air pressure from the coil’s plenum.
This is necessary to prohibit any interference with the
function of the furnace’s drain trap.
NOTE: In vertical installations, air conditioning
coil condensate may drain into the furnace trap
as long as there is a trap between the coil and the
furnace trap and the drain pipe is not terminating
below the water level of the furnace trap.
background
18
#
3
#1
#2
#4
#5
#
6
#7
#8
#9
#10
#11
100 Degree
Elbow
Coupling
Figure 23
NOTE: Drain components shown for information
purposes only. For horizontal installations, a
Horizontal Drain Kit may be needed. Refer to the
Specifications Sheet for kit part number.
General Drain Information
All furnace models come with a factory installed drain trap.
For vertical installations, the trap will remain in the factory
position. All furnace models installed horizontally require
the trap to be relocated. Many drain hoses have a built–in
grommet which will provide a cabinet seal when installed.
See instructions below for your model and installation
position. NOTE: Both sides of the drain trap must be
primed prior to initial furnace start up.
Field Supplied Drain
Drain the furnace and air conditioning coil if applicable,
in compliance with code requirements. In horizontal
installations, a eld installed rubber coupling will allow
the drain trap to be removed for cleaning. The drain trap
must be primed before initial furnace start up. When
an air conditioning coil drain is connected to the eld
supplied furnace drain, it must be vented. An open tee
must be installed at a height no higher than the bottom
of the furnace collector box to prevent air conditioning
condensate from backing up into the furnace, if the
common drain was blocked.
Upflow Model Installed Vertically
The trap and factory installed hoses remain as shipped.
The furnace drain may exit either the right or left side of the
furnace cabinet. Both sides of the cabinet have two .875”
diameter holes which can be used interchangeably for
drain and low voltage wiring purposes. If a higher drain exit
is needed, a .875” diameter hole may be added in the area
shown in Figure 24. Any unused cabinet opening must be
sealed. Do not allow drain hose to sag or trap water.
Side Cut-Out
12”
3”
Right side shown.
Acce
ptable
area for
dr
ain hole.
Figure 24
Drain Exiting Right Side
1. Locate and Install the 45º pipe/hose drain coupling
from the outside of the cabinet (barbed end goes
in the cabinet) through hole in the right side of the
cabinet and secure with two eld supplied #8 self-
tapping screws (see Figure 25).
2. Locate the long drain hose #3 and cut at line “A”.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and
secure with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on eld supplied/installed drain on outlet of furnace
trap.
Drain Exiting Left Side
1. Install the 45º pipe/hose drain coupling from the
outside of the cabinet (barbed end goes in the
cabinet) through the hole in the left side of the
cabinet and secure with two eld supplied #8 self-
tapping screws (see Figure 25).
2. Locate the long drain hose #3 and cut at “B” line for a
17.5” cabinet; cut at line “C” for a 21” cabinet; do not
cut for a “D” width cabinet.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and
secure with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on eld supplied/installed drain on outlet of furnace
trap.
background
19
Hose #1
Hose #2
45 degree
barb-pipe
adapter
45 degree
barb-pipe
adapter
Installer selects right or left side drain
and installs this hose accordingly
Figure 25
Hose #11
Hose #2
Figure 26
Upflow Model Installed Horizontally
with Right Side Down
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
1. Remove the clamps from both ends of the drain
hoses.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and two hoses from the blower
deck.
4. Remove the two plugs from the right side of the
cabinet and install them in the blower deck.
5. Draining the Vent Elbow: Locate hose #2 (factory
installed) and cut 1” away from the 45º bend, discard
the 45º section. Insert hose #2 from outside the
cabinet through the cabinet drain hole nearest the
top, secure it to the barbed tting in the elbow with a
red clamp.
6. Draining the Collector Box: Install the non-grommet
end of hose #11 from outside the cabinet in the
bottom drain hole. Install on collector box and secure
with a silver clamp.
7. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws
through the large set of holes in the top mounting
tabs of the trap into the two predrilled holes in the
side of the cabinet.
8. Refer to Field Supplied Drain section for instructions
on eld supplied/installed drain on outlet of furnace
trap.
Hose #6
Hose #5
Hose #11
Front Cover
Pressure Switch
Tube Location
Figure 27
Upflow Model Installed Horizontally
with Left Side Down
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
*See Front Cover Pressure Switch Tube Location on Figure
27.
1. Remove the clamps from the two drain tubes on the
trap.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and hoses from the blower deck.
4. Remove the two plugs from the left side of the
cabinet and install them in the blower deck.
5. Draining the Vent Elbow: Locate hose #6. Measuring
from the non-grommet end; cut o󰀨 and discard 1 ½”
for a “D” width cabinet, 5” for a “C” width cabinet, 8
½” for a “B” width cabinet.
6. Remove the rubber plug from vent – drain elbow side
port. Place hose #6 on the vent – drain elbow side
port and secure with a silver clamp.
background
20
7. Unused vent-drain elbow drip leg port must be
sealed to prevent ue gases from escaping.
Insert the rubber plug removed in step 6 into the
unused elbow drain port. Inserting a blunt tool
such as a 3/16’’ Allen wrench into the center of
the rubber plug will stretch the plug and allow
complete insertion.
8. Locate hose #5 and cut 3” from the non-grommet
end. Discard the section without the grommet.
9. Insert the cut end of tube #5 through the lower
cabinet drain hole.
10. Connect hose #6 & hose #5 using 100º elbow and
secure with two red clamps.
11. Draining the Collector Box: Remove cap from left
side collector box drain port (bottom in horizontal left
position) and install it on right side (top) collector box
drain port.
12. Install the non-grommet end of hose #11 from
outside the cabinet in the upper drain hole. Install on
collector box and secure with a silver clamp.
13. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws
through the large set of holes in the top mounting
tabs of the trap into the two pre-drilled holes in the
side of the cabinet.
14. Refer to Field Supplied Drain section for instructions
on eld supplied/installed drain on outlet of furnace
trap.
Insert flange. Cut 2 ½” long
.RF000142
2 ½”
Figure 28
Upflow Model Installed Horizontally
With Left Side Down - Alternate
*See Front Cover Pressure Switch Tube Location on Figure
27.
1. Draining the RF000142 Coupling: Locate hose #2
(factory installed). Cut o󰀨 and discard the 45° radius
end.
2. Install 90°radius end of hose #2 on RF000142 drain
outlet and secure with a red clamp.
3. Insert coupling in hose #2 and secure with a red
clamp.
4. Locate hose #5 and cut 3” from the non-grommet
end. Discard the section without the grommet.
5. Insert the cut end of tube #5 through the lower
cabinet drain hole.
6. Insert 100° elbow in the cut end of hose #5.
7. Locate hose #6. Using red clamps, connect between
the coupling and 100° elbow, cutting o󰀨 excess
tubing.
8. Draining the Collector Box: Remove cap from left
side collector box drain port (bottom in horizontal left
position) and install it on right side (top) collector box
drain port and secure with a red clamp.
9. Install the non-grommet end of hose #11 from
outside the cabinet in the upper drain hole. Install on
collector box and secure with a silver clamp.
10. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws
through the large set of holes in the top mounting
tabs of the trap.
ELECTRICAL CONNECTIONS
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
WARNING
To prevent personal injury or death due to electric shock,
disconnect electrical power before installing or servicing
this unit.
WARNING
HIGH VOLTAGE!
To avoid the risk of injury, electrical shock
or death, the furnace must be electrically
grounded in accordance with local codes or
in their absence, with the latest edition of the
National Electrical Code.
Wiring Harness
The wiring harness is an integral part of this furnace.
Wires are color coded for identication purposes. Refer to
the wiring diagram for wire routings. If any of the original
wire as supplied with the furnace must be replaced, it must
background
21
be replaced with wiring material having a temperature
rating of at least 105°C. Any replacement wiring must be a
copper conductor.
120 Volt Line Connections
Before proceeding with electrical connections, ensure
that the supply voltage, frequency, and phase correspond
to that specied on the unit rating plate. Power supply to
the furnace must be NEC Class 1, and must comply with
all applicable codes. The furnace must be electrically
grounded in accordance with local codes or, in their
absence, with the latest edition of The National Electric
Code, ANSI NFPA 70.
Use a separate fused branch electrical circuit containing
properly sized wire, and fuse or circuit breaker. The fuse
or circuit breaker must be sized in accordance with the
maximum overcurrent protection specied on the unit
rating plate. An electrical disconnect must be provided at
the furnace location.
Connect hot, neutral, and ground wires as shown in the
wiring diagram located on the unit’s blower door. Metal
conduit is not considered a substitute for an actual ground
wire to the unit. For direct vent applications, the cabinet
opening to the junction box must be sealed air tight using
either a UL approved bushing such as Heyco Liquid
Tight or by applying non-reactive UL approved sealant to
bushing.
Line polarity must be observed when making eld
connections.
NOTE: Wire routing must not interfere with
circulator blower operation, filter removal, or
routine maintenance.
Junction Box Relocation
WARNING
HIGH VOLTAGE!
To avoid personal injury or death due to
electrical shock, disconnect electrical power
before servicing or changing any electrical
wiring.
WARNING
HIGH VOLTAGE!
To avoid the risk of electrical shock, wiring
to the unit must be polarized and grounded.
CAUTION
Label all wires prior to disconnection when servicing con-
trols. Wiring errors can cause improper and dangerous
operation. Verify proper operation after servicing.
Line voltage connections can be made through either the
right or left side panel. The furnace is shipped congured
for a left side electrical connection. To make electrical
connections through the opposite side of the furnace, the
junction box must be relocated to the right side prior to
making electrical connections. To relocate the junction box,
perform the following steps.
1. Remove the burner compartment door.
2. Remove and save the two screws securing the
junction box to the side panel.
3. Relocate junction box and associated plugs and
grommets to opposite side panel. Secure with
screws removed in step 2.
To ensure proper unit grounding, the ground wire should
run from the furnace ground screw located inside the
furnace junction box all the way back to the electrical
panel. NOTE: Do not use gas piping as an electrical
ground. To conrm proper unit grounding, turn o󰀨 the
electrical power and perform the following check.
1. Measure resistance between the neutral (white)
connection and any unpainted surface.
2. Resistance should measure 10 ohms or less.
This furnace is equipped with a blower door interlock
switch which interrupts unit voltage when the blower door
is opened for servicing. Do not defeat this switch.
24 Volt Thermostat Wiring
Low voltage connections can be made through either the
right or left side panel. Thermostat wiring entrance holes
are located in the blower compartment. The following
gures show connections for single and two-stage A/C &
HP systems.
This furnace is equipped with a 40 VA transformer to
facilitate use with most cooling equipment. Consult the
wiring diagram, located on the blower compartment door,
for further details of 115 Volt and 24 Volt wiring.
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Single-Stage Cooli
ng)
24 VA C
Thermostat
Y1
Y2
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Two-Stage Cooling)
24 VA C
Thermostat
Y2
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Heat Pump
R
C
Y
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Two Stage
Heat Pump
R
C
Y
Y2
Y2
Y1
Y2
Y2
Non-communicating Single Stage A/C
Figure 29A
background
22
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Single-Stage Cooling)
24 VA C
Thermostat
Y1
Y2
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Two-Stage Cooling)
24 VA C
Thermostat
Y2
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Heat Pump
R
C
Y
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Two Stage
Heat Pump
R
C
Y
Y2
Y2
Y1
Y2
Y2
Non-communicating Two Stage A/C
Figure 29B
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Single-Stage Cooling)
24 VA C
Thermostat
Y1
Y2
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Two-Stage Cooling)
24 VA C
Thermostat
Y2
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Heat Pum
p
R
C
Y
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Two Stage
Heat Pump
R
C
Y
Y2
Y2
Y1
Y2
Y2
Non-Communicating Single Stage Heat Pump
Figure 29C
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Single-Stage Cooling)
24 VA C
Thermostat
Y1
Y2
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
C
Y
Remote
Condensing Unit
(Two-Stage Cooling)
24 VA C
Thermostat
Y2
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Heat Pump
R
C
Y
Y1
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
24 VA C
Thermostat
Two Stage
Heat Pum
p
R
C
Y
Y2
Y2
Y1
Y2
Y2
Non-Communicating Two Stage Heat Pump
Figure 29D
NOTE: Equipment type (Single-stage cooling, Two-
stage cooling, Single-stage heat pump, Two-stage
heat pump) MUST be setup through the OdS menu
by the installer for proper system operation. See
Using Push-Button Switches for instructions on
how to navigate the control menu.
Twinning
For Furnace Twinning information, please refer to the
Furnace Twinning installation manual IO-2001. Please
scan the QR code below to open the document.
NOTE: Each furnace must be connected to its
own 115 VAC power supply. The L1 connection
to each furnace must be in phase (connected to
circuit breakers on the same 115 VAC service
panel phase leg). To verify that the furnaces are
in phase, check from L1 to L1 on each furnace
with a voltmeter. If the furnaces are in phase, the
voltage between both furnaces will be ZERO.
Low Voltage Ventilation
The Ventilation connections provide a dry contact for
eld ventilator wiring connections. These connections are
normally open and energize during the R-32 fault/alarm
condition. A VT IN and a VT OUT connectors are provided
and are shown in the image below.
Low Voltage A2L Alarm
The A2L alarm connection provides 24VAC for eld alarm
wiring connections. These connections are normally open
and energize during the R-32 fault/alarm condition. An A2L
Alarm connector is provided and is shown in the image
below.
Field Installation Accessories (Daughter Board)
Additional accessories that do not have dedicated
terminals on the furnace control board may require an
additional daughter board to be installed. Please refer to
service manual on your product for more information.
24 VOLT A2L ALARM
(OPTIONAL))
R-32 SENSOR
24 VOLT
VENTILATION
( OPTIONAL )
24 VAC Accessories - Accessories Wiring
Figure 30
Single-Stage Heating Thermostat Application
A single-stage thermostat with only one heating stage is
needed to control this furnace.
WARNING
ALL ACCESSORIES THAT MAY BECOME A POTENTIAL
IGNITION SOURCE IF INSTALLED. SUCH AS ELECTRONIC
AIR CLEANERS, MUST ONLY BE POWERED THROUGH OUR
ACCESSORY CONTROL BOARD KIT. IF AN ELECTRONIC AIR
CLEANER IS ALREADY INSTALLED IN THE DUCT WORK AND
NOT CONNECTED TO THE ACCESSORY CONTROL BOARD. IT
WILL HAVE TO BE DISABLED OR REMOVED. ENSURE THAT
ANY ADDITIONAL WIRING FROM THE INDOOR UNIT TO THE
ACCESSORY CONTROL BOARD IS ROUTED AND PROTECTED
FROM DAMAGE WEAR, AVOIDING THE FLUE PIPE AND ANY
JOINTS THAT MAY NEED BRAZED OR DISCONNECTED FOR
SERVICE. REFER TO THE PRODUCT SPECIFICATION SHEET
FOR THE ACCESSORY CONTROL BOARD KIT PART NUMBER.
120 Volt Line Connection of Accessories
Humidifier and Electronic Air Cleaner
WARNING
HIGH VOLTAGE!
To avoid personal injury or death due to
electrical shock, disconnect electrical power
before servicing or changing any electrical
wiring.
background
23
The furnace integrated control module is equipped with
dedicated ¼ inch EAC and HUM relay terminals for
controlling external power to an optional eld supplied
humidier and/or electronic air cleaner. Additional line
voltage wiring to the inside of the furnace must conform to
all local codes and have a minim um temperature rating of
105°C. All line voltage wire splices must be made inside
the furnace.
When utilized, the HUM relay will be closed during normal
heating operation and the EAC relay will be closed during
fan operation. 115VAC must be present on the one terminal
from HUM or EAC to take advantage of the second
terminal.
115 VAC
115 VAC EAC
120 Volt Line Connection of Accessories Humidifier (HUM) &
Electronic Air Cleaner (EAC)
Figure 31
Fossil Fuel Applications
This furnace can be used in conjunction with a heat pump
in a fossil fuel application. A fossil fuel application refers to
a combined gas furnace and heat pump installation which
uses an outdoor temperature sensor to determine the most
cost e󰀩cient means of heating (heat pump or gas furnace).
Strictly follow the wiring guidelines in the fossil fuel kit
installation instructions. All furnace connections must be
made to the furnace integrated control module and the
“FURNACE” terminal strip on the fossil fuel control board.
GAS SUPPLY AND PIPING
CAUTION
To prevent unreliable operation or equipment damage,
the gas manifold pressure must be as specified on the unit
rating plate. Only minor adjustments should be made by
adjusting the gas valve pressure regulator.
WARNING
Possibility property damage, personal injury or death may
occur if the correct conversion kits are not installed. The
appropriate kits must be applied to ensure safe and proper
furnace operation. All conversions must be performed by a
qualified installer or servicer agency.
Natural Gas
Minimum: 4.5" W.C.
Maximum: 10.0" W.C.
INLET GAS SUPPLY PRESSURE
Table 4
The furnace rating plate includes the approved furnace gas
input rating and gas types. The furnace must be equipped
to operate on the type of gas applied. This includes any
conversion kits required for alternate fuels and/or high
altitude.
Inlet gas supply pressures must be maintained within the
ranges specied in table 4. The supply pressure must be
constant and available with all other household gas red
appliances operating. The minimum gas supply pressure
must be maintained to prevent unreliable ignition. The
maximum must not be exceeded to prevent unit overring.
High Altitude Derate
The furnace, as shipped, requires no change to run
between 0-4500 feet. At all altitudes the air temperature
rise must be within the range listed on the Specication
Sheet applicable to your model for the fuel used. Manifold
pressure adjustments and combustion analysis are
required for all installations above 4500 ft. Refer to “Gas
Supply Pressure Measurement” section for instruction
on how to properly measure and adjust manifold “outlet”
pressure. The furnace should operate for a minimum of 15
minutes before taking a combustion sample. Combustion
samples should be taken from beyond the furnace exhaust
and must be within provided CO2% range. See table 5
for recommended manifold pressure adjustments and
proper CO2% range. Gas heating values can vary; further
pressure adjustment may be necessary to ensure furnace
operates within acceptable CO2 range.
MODEL
Manifold
Pressure
at 5000 ft
Manifold
Pressure
at 7500 ft
C02%
Natural
Gas
Max Allowable
Venting (3 in.
only)
*R9S960403BU 100 ft
*R9S960603BU 100 ft
*R9S960805CU 80 ft
2.5” w.c 2.4” w.c. 6.5 - 8.5
Table 5
Gas Valve
This unit is equipped with a 24 volt gas valve controlled
during furnace operation by the integrated control module.
Taps for measuring the gas supply pressure and manifold
pressure are provided on the valve.
The gas valve has a manual ON/OFF control located on
the valve itself. This control may be set only to the “ON”
or “OFF” position. Refer to the lighting instructions label
or Startup Procedure & Adjustment for use of this control
during start up and shut down periods.
background
24
Gas Piping Connections
WARNING
To avoid the possibility of explosion or fire, never use a
match or open flame to test for leaks.
WARNING
If the gas furnace is installed in a basement, an excavat-
ed area or confined space, it is strongly recommended to
contact a certified contractor to install a gas detecting
warning device in case of a gas leak.
When sizing gas lines, be sure to include all appliances
which will operate simultaneously. The gas piping supplying
the furnace must be properly sized based on the gas ow
required, specic gravity of the gas, and length of the run.
The gas line installation must comply with local codes, or
in their absence, with the latest edition of the National Fuel
Gas Code, NFPA 54/ANSI Z223.1.
To connect the furnace to the building’s gas piping, the
installer must supply a ground joint union, drip leg, manual
shuto󰀨 valve, and line and ttings to connect to gas valve.
In some cases, the installer may also need to supply a
transition piece from 1/2” pipe to a larger pipe size.
The following stipulations apply when connecting gas
piping. Refer to Gas Piping Connections gures 32 and 33
for typical gas line connections to the furnace.
• Gas piping must be supported external to the furnace
cabinet so that the weight of the gas line does not
distort the burner rack, manifold or gas valve.
• Use black iron or steel pipe and ttings for building
piping. Where possible, use new pipe that is properly
chamfered, reamed, and free of burrs and chips. If
old pipe is used, be sure it is clean and free of rust,
scale, burrs, chips, and old pipe joint compound.
• Use pipe joint compound on male threads ONLY.
Always use pipe joint compound (pipe dope) that
is APPROVED FOR ALL GASES. DO NOT apply
compound to the rst two threads.
• Use ground joint unions.
• Install a drip leg to trap dirt and moisture before
it can enter the gas valve. The drip leg must be a
minimum of 3” long.
• Install a 1/8” NPT pipe plug tting, accessible for test
gauge connection, immediately upstream of the gas
supply connection to the furnace.
• Always use a back-up wrench when making the
connection to the gas valve to keep it from turning.
The orientation of the gas valve on the manifold
must be maintained as shipped from the factory.
Maximum torque for the gas valve connection is 375
in-lbs; excessive over-tightening may damage the
gas valve.
• Install a manual shuto󰀨 valve between the gas
meter and unit within six feet of the unit. If a union
is installed, the union must be downstream of the
manual shuto󰀨 valve, between the shuto󰀨 valve and
the furnace.
• Tighten all joints securely.
• Connection method must be in compliance with all
local and national codes. US: National Fuel Gas
Code (NFGC) NFPA 54-2012/ANSI Z223.1-2012 and
the Installation Standards, Warm Air Heating and Air
Conditioning Systems ANSI/NFPA 90B.
• Connect the furnace to the building piping by one of
the following methods:
– Rigid metallic pipe and ttings.
– Semi-rigid metallic tubing and metallic ttings.
Aluminum alloy tubing must not be used in exterior
locations. In order to seal the grommet cabinet
penetration, rigid pipe must be used to reach the
outside of the cabinet. A semi-rigid connector to the
gas piping may be used from there.
• Use listed gas appliance connectors in accordance
with their instructions. Connectors must be fully in
the same room as the furnace.
• Protect connectors and semirigid tubing against
physical and thermal damage when installed.
Ensure aluminum-alloy tubing and connectors are
coated to protect against external corrosion when
in contact with masonry, plaster, or insulation, or
subjected to repeated wetting by liquids such as
water (except rain water), detergents, or sewage.
Natural Gas Capacity of Pipe
In Cubic Feet of Gas Per Hour (CFH)
Length of Nominal Black Pipe Size
Pipe in Feet 1/2" 3/4" 1" 1 1/4" 1 1/2"
10 132 278 520 1050 1600
20 92 190 350 730 1100
30 73 152 285 590 980
40 63 130 245 500 760
50 56 115 215 440 670
60 50 105 195 400 610
70 46 96 180 370 560
80 43 90 170 350 530
90 40 84 160 320 490
100 38 79 150 305 460
(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on
0.60 Specific Gravity Gas)
CFH =
BTUH Furnace Input
Heating Value of Gas (BTU/Cubic Foot)
Table 6
The gas piping may enter the left or right side of the
furnace cabinet. The installer must supply rigid pipe long
enough to reach the outside of the cabinet to seal the
grommet cabinet penetration. A semi-rigid connector to the
gas piping can be used outside the cabinet per local codes.
1/2” NPT pipe and ttings are required. For models with an
“L” shaped manifold, a 4 1/2” long nipple is required. For
models with a hook shaped manifold, a 2” long nipple is
required.
background
25
A semi-rigid connector to the gas piping can be used
outside the cabinet per local codes. From the elbow, the
length of pipe and the ttings required will vary by the side
chosen, location of union and cabinet width. The union may
be placed inside or outside of the cabinets.
Alternate
Gas Line
Location
Plug in
Alternate
Gas Line
Hole
* Ground
Joint
Pipe
Union
Gas Valve
*Ground
Joint
Pipe
Union
Manual Shut Off Valve
(upstream from
ground joint
pipe union)
Grommet
in Standard
Gas Line
Hole
Drip Leg
Burner
Manifold
* NOTE: Union may be inside furnace cabinet where allowed by local codes.
Upflow
Figure 32
Manual Shut Off Valve
(upstream from
ground joint pipe union)
Drip Leg
Plug in Alternate Gas Line Hole
Grommet in
Standard Gas Line Hole
Alternate
Union
Location
Burner
Drain Trap
Gas Valve
Plug in Main Gas Line Hole
Manifold
Upflow - Horizontal Left
Figure 33
Gas Piping Checks
Before placing unit in operation, leak test the unit and gas
connections.
Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector, or
bother approved testing methods.
NOTE: Never exceed specified pressures for
testing. Higher pressure may damage the gas valve
and cause subsequent overfiring, resulting in heat
exchanger failure.
Disconnect this unit and shuto󰀨 valve from the gas supply
piping system before pressure testing the supply piping
system with pressures in excess of ½ psig (3.48 kPa).
Isolate this unit from the gas supply piping system by
closing its external manual gas shuto󰀨 valve before
pressure testing supply piping system with test pressures
equal to or less than ½ psig (3.48 kPA).
CIRCULATING AIR & FILTERS
Duct work - Air Flow
Duct systems and register sizes must be properly designed
for the CFM and external static pressure rat ing of the
furnace. Ductwork should be designed in accor dance
with the recommended methods of “Air Conditioning
Contractors of America” Manual D.
Install the duct system in accordance with Standards of the
National Fire Protection Association, NFPA 90A and 90B.
CUTAWAY OF DUCTWORK
TO EXPOSE COIL
DIGITAL
MANOMETER
RETURN
AIR
Mode
.
SUPPLY
AIR
Figure 34
A closed return duct system must be used, with the return
duct connected to the furnace. NOTE: Ductwork must
never be attached to the back of the furnace. For upow
installations requiring 1800 CFM or more, use either two
side returns or bottom return or a combination of side/
bottom. Flexible joints may be used for supply and return
con nections to reduce noise transmission. To prevent the
blower from inter fering with combustion air or draft when a
central return is used, a connecting duct must be installed
between the unit and the utility room wall. Never use a
room, closet, or alcove as a return air chamber.
background
26
Checking Duct Static
WARNING
Edges of sheet metal holes may be sharp. Use gloves as
a precaution when removing sheet metal from return air
openings.
Refer to your furnace rating plate for the maximum ESP
(external duct static) rating.
Total external static refers to everything external to the
furnace cabinet. Cooling coils, lters, ducts, grilles,
registers must all be considered when reading your total
external static pressure. The supply duct pressure must be
read between the furnace and the cooling coil. This reading
is usually taken by removing the “A” shaped block o󰀨
plate from the end on the coil; drilling a test hole in it and
reinstalling the block o󰀨 plate. Take a duct static reading
at the test hole. Tape up the test hole after your test is
complete. The negative pressure must be read between
the lter and the furnace blower.
Too much external static pressure will result in insu󰀩cient
air that can cause excessive temperature rise. This can
cause limit switch tripping and heat exchanger failure.
To determine total external duct static pressure, proceed as
follows:
1. With clean lters in the furnace, use a manometer to
measure the static pressure of the return duct at the
inlet of the furnace (Negative Pressure).
2. Measure the static pressure of the supply duct
(Positive Pressure).
3. The di󰀨erence between the two numbers is the total
external static pressure.
EXAMPLE:
static reading from return duct = -.1” w.c.
static reading from supply duct = .3” w.c.
total external static pressure on this system = .4” w.c.
NOTE: Both readings may be taken simultaneously
and read directly on the manometer if so
desired. If an air conditioner coil or Electronic
Air Cleaner is used in conjunction with the
furnace, the readings must also include theses
components, as shown in the following drawing.
4. Consult proper tables for the quantity of air.
If the total external static pressure exceeds the maximum
listed on the furnace rating plate, check for closed
dampers, registers, undersized and/or oversized poorly laid
out duct work.
The temperature rise of the furnace must be within the
temperature rise range listed on the furnace rating plate.
Bottom Return Air Opening [Upflow Models]
The bottom return air opening on upow models utilizes
a “lance and cut” method to remove sheet metal from the
duct opening in the base pan. To remove, simply press
out the lanced sections by hand to expose the metal strips
retaining the sheet metal over the duct opening. Using
tin snips, cut the metal strips and remove the sheet metal
covering the duct opening. In the corners of the opening,
cut the sheet metal along the scribe lines to free the duct
anges. Using the scribe line along the duct ange as a
guide, unfold the duct anges around the perimeter of the
opening using a pair of seamer pliers or seamer tongs.
NOTE: Airflow area will be reduced by
approximately 18% if duct flanges are not
unfolded. This could cause performance issues
and noise issues.
CUT FOUR CORNERS
AFTER REMOVING SHEET
METAL
CUT USING TIN SNIPS
PRESS OUT BY HAND
SCRIBE LINES OUTLINING
DUCT FLANGES
Duct Flange Cut Out
Figure 35
When the furnace is used in connection with a cooling unit,
the furnace should be installed upstream of the cooling coil.
When the furnace is installed without a cooling coil, it is
recommended that a removable access panel be provided
in the outlet air duct. This opening shall be accessible
when the furnace is installed and shall be of such a size
that the heat exchanger can be viewed for visual light
inspection or such that a sampling probe can be inserted
into the airstream. The access panel must be made to
prevent air leaks when the furnace is in operation.
NOTE: In a horizontal installation the air
conditioning coil must be adequately supported
by proper brackets and supports. Inadequate coil
support can result in furnace cabinet distortion
and air leakage.
When the furnace is heating, the temperature of the return
air entering the furnace must be between 60°F and 80°F.
Filters - Read This Section Before Installing
The Return Air Duct work
Filters must be used with this furnace. Discuss lter
maintenance with the building owner. Filters do not ship
with this furnace, but must be provided, sized and installed
externally by the installer. Filters must comply with UL900
or CAN/ULCS111 standards. Damage or repairs due to
background
27
the installation of the furnace without lters is not covered
under the warranty.
On upow units, guide dimples locate the side return cutout
locations. Use a straight edge to scribe lines connecting
the dimples. Cut out the opening on these lines. NOTE: An
undersized opening will cause reduced airow.
Refer to the Filter Sizing Chart to determine lter area
requirements.
Model Minimum Recommended Filter Size^
*R9S960403BU
1 - 16 X 25 Side or Bottom
*R9S960603BU
1 - 16 X 25 Side or Bottom
*R9S960805CU
1 - 20 X 25 Bottom/2 - 16 X 25 Side Return
^ Larger filters may be used, filters may also be centrally located.
Table 7
Upright Installations
Depending on the installation and/or customer preference,
di󰀨ering lter arrangements can be applied. Filters can
be installed in the central return register or a side panel
external lter rack kit (upows). As an alternative a media
air lter or electronic air cleaner can be used as the
requested lter.
Figure 36 shows possible lter locations.
AIR FLOW
SIDE RETURN
EXTERNAL FILTER
RACK KIT
(EITHER SIDE)
Possible Upright Upflow
Figure 36
Horizontal Installations
Filters must be installed in either the central return register
or in the return air duct work.
Using Push-Buttons
All user settings may be accessed by three push-button
on the control board. The three buttons are labeled Left,
Center and Right. The center button is used to enter into
the option menu and make the selection. The left and right
buttons are used to browse the main menu and option
menus. When the center button is pressed in the main
menu, the furnace control will go to the option menu and
display the default or previously selected option. Pressing
the left or right button will display the next available option.
When the next adjustable or selectable option is displayed,
the furnace control will ash the option with ½ second ON
and ½ second OFF indicating the option has not yet been
selected.
To select an option; press and release the center
button to stop the current option from ashing. When the
option has stopped ashing, press the center button
again to select that option.
While navigating through options, if no buttons are
pressed during a 30 second time period, the display will
timeout and return to the Status Menu. Simultaneously
pressing and releasing any two buttons will also return the
furnace control back to the Status Menu. If the previously
displayed option was not selected and a timeout occurs,
the displayed option will not be stored in control memory as
a selected option.
R-32 FUNCTION
This furnace is equipped with a control board that is
capable of shutting o󰀨 the gas heat and turning on the
blower fan in case of an R-32 refrigerant leak in the indoor
evaporator coil. If the cooling unit that is paired with this
furnace does not utilize R-32 as the refrigerant, the R-32
functionalities in the furnace control board will need to be
turned o󰀨 for the furnace to run properly.
R-32 function on the control board is ON by default. The
R-32 function can be disabled through the furnace control
by entering the A2L Function Enabled menu and selecting
“no”. If A2L function is disabled, the furnace control will
ignore all A2L functions. If A2L function is enabled, the
control will monitor the R-32 sensor information. To enter
the A2L Function Enabled menu, press the left or right
button until the LED displays “A2E”. Press the center
button and the LED will display the selected option (yes or
no). Press the left or right button to select one of the two
options and press the center button twice to conrm the
option.
R-32 Sensor Wire Routing
IMPORTANT NOTE: Wiring routing must not
interfere with circulator blower operation, filter
removal or routine maintenance. Wire should
not be routed near hot surfaces and should be
protected from sharp edges.
The R-32 Sensor wire coming from the indoor evaporator
coil will need to be routed into the furnace and connected
to the connection point on the furnace control board. This
wire should be routed alongside the thermostat wires
through the low voltage openings in the left or right side of
the furnace blower compartment. Please see the electrical
section for the location of the R-32 Sensor connection on
the control board.
background
28
The R-32 function on the furnace control board may need
to be enabled or disabled if any element of the installation
changes from the original setup. The specic scenario
will depend on each installation, so please refer to the
evaporator coil’s installation manual to verify what is
required for your setup. For example, if the furnace was
initially installed with an evaporator coil that utilized R-410A
refrigerant, and the coil is later replaced with one that uses
R-32 refrigerant, then R-32 function mode on the furnace
control board must be enabled, and the R-32 sensor wire
must be connected to the furnace control board.
Furnace Start-Up
During furnace start up, the furnace control will identify the
connected R-32 sensor and will start monitoring the sensor
communication. A green LED located next to the sensor
connection will indicate if there is communication between
the furnace control and the R-32 sensor. The LED will be
ON during the duration of the startup and then will either
start blinking or turn OFF. The blinking LED signies that
communication with the R-32 sensor is present. The LED
OFF signies that there is no signal with the sensor.
If there are no alarms or faults, the furnace will go into
regular run mode after a warm up period. The furnace
control monitors the R-32 sensor once per second.
R-32 Refrigerant Leak
If the R-32 sensor on the indoor evaporator coil detects
a specied concentration of R-32 refrigerant, the furnace
will enter Mitigation Mode to dilute the refrigerant
concentrations in case of a leak. In Mitigation Mode, the
furnace will do the following:
1. Display the A2L Refrigerant Leakage error code
(EAL)
2. Shut down the gas operation
3. Energize the optional ventilation and alarm outputs.
4. Run the fan at max CFM airow
Once the R-32 sensor stops detecting a leak, the fan will
continue to run for 5 minutes. After the 5 minutes, if there
are no other alarms or faults, the control will de-energize
the optional ventilation and alarm outputs and then go back
to the original operating mode per the thermostat.”
A2L Verification
The A2L Function Verication menu allows the installer to
verify if the R-32 function operates properly. This menu
simulates the refrigerant leak process and is only able to
be used when there are no active alarms or faults. To verify
the R-32 functions, enter the A2L Function Verication
menu and select “YES”. To enter the A2L Function
Verication menu, press the left or right button until LED
displays “A2u”. Press the center button and the LED will
display the selected option (yes or no). Press the left or
right button to select one of the two options and press
the center button to conrm the option. Once “YES” is
selected, the furnace will do the following:
1. Display the A2L Refrigerant Leakage code (EAL)
2. Shut down the gas operation
3. Energize the optional ventilation and alarm outputs.
4. Run the fan at max CFM airow
The control will exit the verication function if:
1. The 5 minute timeout expires or
2. An alarm or fault is detected or
3. The user turns OFF the A2L Function Verication.
NOTE: To verify gas heating operation shuts down,
give furnace a call for heat before entering into A2L
Function Verication.
STARTUP PROCEDURE & ADJUSTMENT
NOTE: This furnace is equipped with a control
board that is capable of monitoring for R-32
refrigerant leaks in the indoor refrigeration unit.
Please verify that the R-32 sensor wire is plugged
in to the furnace control board before startup,
if applicable. If furnace is not paired with an R-32
Refrigeration system, the default settings in the
furnace control board will need to be changed.
Please see the R-32 section for additional
information.
Furnace must have a 115 VAC power supply properly
connected and grounded. Proper polarity must be
maintained for correct operation. In addition to the following
start-up and adjustment items, refer to further information
in Operational Checks section.
Quick Start
Initial set up of outdoor systems are required to be
congured through the control board. Navigate to OdS
menu using the push buttons to properly congure the
outdoor system. Selections for AC1, AC2, HP1, HP2 must
be made to enable specic fan speeds and thermostat
signals to function.
NOTE: Equipment type (Single-stage cooling, Two-
stage cooling, Single-stage heat pump, Two-stage
heat pump) MUST be setup through the OdS menu
by the installer for proper system operation.
background
29
Control Board Main Menu
SEGT #1 SEGT#2 SEGT#3 SEGT #1 SEGT#2 SEGT#3
Active Alarm menu
ErrE
xx
Err
( xx: code numbers ) - See chart for
Alarm Code definition
Last 10 Faults
F10E
xx
F10
( xx: code numbers ) - See chart for
Alarm Code definition
Code Release Number
Cr
Cr
Code number
Shared data Revision
Sr
Sr
Shared Data Number
Reset to Factory Default
rFd
rFd
PCB will revert back to factory default
if selected yes
Outdoor Setting Menu
0dS
OdS
OdS option is used to select outdoor unit
type ( 1 or 2 stage )
Blower Speed for Continuous Fan Mode
FSd
FSd
( xx: Blower Speed Number F01, F02..
)
Single-Stage Cooling Fan Speed
AC
AC
( xx: Blower Speed Number F01, F02..
)
Low-stage Cooling Fan Speed, Two-Stage
AC1
AC1
( xx: Blower Speed Number F01, F02..
)
High-stage Cooling Fan Speed, Two-Stage
AC2
AC2
( xx: Blower Speed Number F01, F02..
)
Cool On Delay
Cnd
Cnd
Default set at 7 Secs, Adjustments
can be made in 7 Secs increments
from 0 to 35 Secs
Cool Off Delay
Cfd
Cfd
Default set at 65 Secs, Adjustments
can be made in 5 Secs increments
from 0 to 120 Secs
Gas Heat fan Speed
gAF
gAF
( xx: Blower Speed Number F01, F02..
)
Gas Heat On Delay
gnd
gnd
Default set at 30 Secs, Adjustments
can be made in 5 Secs increments
from 5 to 30 Secs
Gas heat Off Delay
gFd
gFd
Default set at 90 Secs, Adjustments
can be made in 30 Secs increments
from 30 to 180 Secs
Single-Stage HP Heat Fan Speed
HP
HP
( xx: Blower Speed Number F01, F02..
)
Low-stage HP Heat Fan Speed, Two-Stage
HP1
HP1
( xx: Blower Speed Number F01, F02..
)
High-stage HP Heat Fan Speed, Two-Stage
HP2
HP2
( xx: Blower Speed Number F01, F02..
)
HP Heat off Delay
HFd
HFd
Default set at 60 Secs, Adjustments can
be made in 5 Secs increments from 30 to
120 Secs
HP Heat on Delay
Hnd
Hnd
Default set at 5 Secs, Adjustments can
be made in 5 Secs increments from 5 to
30 Secs
Automatic Heat Staging - For Two Stage
Control
AHS
AHS
Refer to Section " CHANGING
HEATING MODE SETTING"
A2L Function Verification
A2u
A2u
A2L Function Enabled
A2E
A2E
Menu Description
Main Menu
Option Menu
Display
Text
Additional Info
Delay, Seconds
None
None
yes, no
AC1 / AC2 / HP1 / HP2
/ OFF
Fxx
Fxx
Fxx
Fxx
Refer to the R-32 Section
Delay, Seconds
Fxx
Delay, Seconds
Delay, Seconds
Fxx
Fxx
Fxx
Delay, Seconds
Delay, Seconds
no, 10, 20, 30, 60,
AUt
Refer to the R-32 Section
Control Board Status Menu
SEGT #1 SEGT#2 SEGT#3
All segments illuminated =
control powering up
8 8 8
Control in Idle stage
I d l
Constant Fan
F A n
Single-Stage Cooling Fan
Speed
A C
Low Stage Cooling
1 A C
High Stage Cooling
2 A C
Gas Heat
g H
Low Stage HP
1 H P
High Stage HP
2 H P
Defrost
d F t
Main Menu
Description of System
Status
Drain Trap Priming
The drain trap MUST be primed prior to furnace startup.
To prime, ll both sides of the drain trap with water.
This ensures proper furnace drainage upon startup and
prohibits the possibility of ue gases escaping through the
drain system.
Furnace Operation
Purge gas lines of air prior to startup. Be sure not purge
lines into an enclosed burner compartment. Follow NFPA
54, National Fuel Gas Code 8.1.
Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector, or
other approved method.
CAUTION
To prevent unreliable operation or equipment damage, the
inlet gas supply pressure must be as specified on the unit
rating plate with all other household gas fired appliances
operating.
Furnace Startup
1. Close the manual gas shuto󰀨 valve external to the
furnace.
2. Turn o󰀨 the electrical power to the furnace.
3. Set the room thermostat to the lowest possible
setting.
4. Remove the burner compartment door.
NOTE: This furnace is equipped with an ignition
device which automatically lights the burner. Do
not try to light the burner by hand.
5. Move the furnace gas valve manual control to the
OFF position.
6. Wait ve minutes then smell for gas. Be sure check
near the oor as some types of gas are heavier than
air.
7. If you smell gas after ve minutes, immediately follow
the safety instructions in the Safety Considerations
on page 3 of this manual. If you do not smell gas
after ve minutes, move the furnace gas valve
manual control to the ON position.
8. Replace the burner compartment door.
9. Open the manual gas shuto󰀨 valve external to the
furnace.
10. Turn on the electrical power to the furnace.
11. Adjust the thermostat to a setting above room
temperature.
12. After the burners are lit, set the thermostat to desired
temperature.
Furnace Shutdown
1. Set the thermostat to the lowest setting.
The integrated control will close the gas valve and
extinguish ame. Following a 30 second delay,
the induced draft blower will be de-energized. The
circulator blower will shut down when the time delay
expires (Time delay is selectable on all models).
2. Remove the burner compartment door and move
the furnace gas valve manual control to the OFF
position.
3. Close the manual gas shuto󰀨 valve external to the
furnace.
4. Replace the burner compartment door.
background
30
Gas Supply Pressure Measurement
Gas Pressure Test
The line pressure supplied to the gas valve must be within
the range specied on Table 4. The supply pressure can
be measured at the gas valve inlet pressure tap or at a
hose tting installed in the gas piping drip leg. The supply
pressure must be measured with the burners operating.
To measure the gas supply pressure, use the following
procedure.
1. Turn OFF gas to furnace at the manual gas shuto󰀨
valve external to the furnace. Back inlet pressure test
port screw turn counter clockwise, not more than one
turn.
2. Connect a calibrated manometer (or appropriate
gas pressure gauge) at either the gas valve inlet
pressure tap or the gas piping drip leg. See White-
Rodgers 36J22Y-204 gas valve gure below for
location of inlet pressure tap.
OUTLET
INLET
Gas Valve ON/OFF Selector Switch
Outlet Pressure
Inlet Pressure
Regulator
Cover Screw
White-Rodgers Model 36J22Y-204
Figure 37A
Mode
3.5
.
Regulator Cover
Screw
White-Rodgers Model 36J22Y-204
Connected to Manometer
Figure 37B
NOTE: If measuring gas pressure at the drip leg, a
field-supplied hose barb fitting must be installed
prior to making the hose connection. If using the
inlet pressure tap on the White-Rodgers 36J22 gas
valve, then use the 36G/J Valve Pressure Check Kit,
Part No. 0151K00000S.
3. Turn ON the gas supply and operate the furnace and
all other gas consuming appliances on the same gas
supply line.
4. Measure furnace gas supply pressure with burners
ring. Supply pressure must be within the range
specied in the Inlet Gas Supply Pressure table 4, on
page 23.
If supply pressure di󰀨ers from table, make the necessary
adjustments to pressure regulator, gas piping size, etc.,
and/or consult with local gas utility.
5. Turn OFF gas to furnace at the manual shuto󰀨 valve
and disconnect manometer. Reinstall plug and
tighten as needed before turning on gas to furnace.
6. Turn OFF any unnecessary gas appliances stated in
step 3.
Mode
10.0
Measuring Inlet Gas Pressure (Alt. Method)
Figure 38
Gas Manifold Pressure Measurement
and Adjustment
Only small variations in gas pressure should be made by
adjusting the gas valve pressure regulator. The manifold
pressure must be measured with the burners operating.
To measure and adjust the manifold pressure, use the
following procedure.
1. Turn OFF gas to furnace at the manual gas shuto󰀨
valve external to the furnace.
2. Turn o󰀨 all electrical power to the system.
3. Outlet pressure tap connections:
White-Rodgers 36J22 valve: Back outlet pressure
test screw (outlet pressure tap) out one turn
(counterclockwise, not more than one turn).
4. Connect calibrated manometer (or appropriate
pressure gauge) at the gas valve outlet pressure tap.
See White-Rodgers 36J22Y-204 gas valve Figure
37A & 37B for location of outlet pressure tap.
5. Turn ON the gas supply.
6. Turn on power and close thermostat “R” and “W”
contacts to provide a call for heat.
7. Measure the gas manifold pressure with burners
background
31
ring. Adjust manifold pressure using the Manifold
Gas Pressure table 8 shown below.
8. Remove regulator cover screw from the outlet
pressure regulator adjust tower and turn screw
clockwise to increase pressure or counterclockwise
to decrease pressure. Replace regulator cover
screw.
9. Turn o󰀨 all electrical power and gas supply to the
system.
10. Remove the manometer hose from the hose barb
tting or outlet pressure tap.
11. Replace outlet pressure tap: White-Rodgers 36J22
valve: Turn outlet pressure test screw in to seal
pressure port (clockwise, 7 in-lb minimum).
12. Turn on electrical power and gas supply to the
system.
13. Close thermostat contacts “R” and “W” to energize
the valve.
Using a leak detection solution or soap suds, check
for leaks at outlet or screw (White-Rodgers valve).
Bubbles forming indicate a leak. SHUT OFF GAS
AND REPAIR ALL LEAKS IMMEDIATELY!
NOTE: For gas to gas conversion, consult your
dealer for appropriate conversion.
Gas Range Nominal
Natural 2.8 - 3.2" w.c. 3.0" w.c.
Manifold Gas Pressure
Table 8
Gas Input Rate Measurement (Natural Gas Only)
The actual gas input rate to the furnace must never be
greater than that specied on the unit rating plate. To
measure natural gas input using the gas meter, use the
following procedure.
1. Turn OFF the gas supply to all other gas-burning
appliances except the furnace.
2. While the furnace is operating at high re rate, time
and record one complete revolution of the gas meter
dial, measuring the smallest quantity, usually the dial
that indicates 1/2 cu. ft. per revolution. You will use
this number to calculate the quantity of gas in cubic
ft. if the furnace would consume if it ran steadily for
one hour (3600 seconds).
3. If the 1/2 cu. ft. dial was used, multiply your number x
2.
EXAMPLE: If it took 23 seconds to complete one
revolution of the 1/2 ft. dial (23 x 2 = 46).
This tells us that at this rate, it would take 46 seconds to
consume one cu. ft. of gas.
This tells us that in one hour, the furnace would consume
78 cu. ft. of gas. (3600 / 46 = 78)
The typical value range for 1 cu. ft. of natural gas is around
1025 BTU. Check with your gas utility, if possible. In this
example, the furnace is consuming 80,000 BTUH.
NOTE: The final manifold pressure cannot vary
by more than ± 0.2” w.c. for natural gas from the
specified setting. Consult your local gas supplier
if additional input rate adjustment is required.
4. Turn ON gas to and relight all other appliances
turned o󰀨 in step 1. Be certain that all appliances
are functioning properly and that all pilot burners (if
applicable) are operating.
Temperature Rise
Temperature rise must be within the range specied on the
unit rating plate. An incorrect temperature rise may result
in condensing in or overheating of the heat exchanger. An
airow and temperature rise table is provided on page 42
and in the Specication Sheet applicable to your model.
Determine and adjust temperature rise as follows:
1. Operate furnace with burners ring for approximately
ten minutes. Ensure all registers are open and all
duct dampers are in their nal (fully or partially open)
position.
2. Place thermometers in the return and supply ducts
as close to the furnace as possible. Thermometers
must not be inuenced by radiant heat by being able
to “see” the heat exchanger.
3. Subtract the return air temperature from the supply
air temperature to determine the air temperature rise.
Allow adequate time for thermometer readings to
stabilize.
4. Adjust temperature rise by adjusting the circulator
blower speed. Increase blower speed to reduce
temperature rise. Decrease blower speed to increase
temperature rise. Refer to Startup Procedure and
Adjustment - Circulator Blower Speeds for speed
changing details.
SUPPLY
AIR
RETURN
AIR
Temperature Rise Measurement
Figure 39
background
32
Circulator Blower Speeds
This furnace is equipped with a multi-speed circulator
blower. This blower provides ease in adjusting blower
speeds. Table 9 and the Specication Sheet applicable
to your model provides an airow table, showing the
relationship between airow (CFM) and external static
pressure (E.S.P.), for the proper selection of heating and
cooling speeds.
1. Determine the tonnage of the cooling system
installed with the furnace. If the cooling capacity is
in BTU/hr divide it by 12,000 to convert capacity to
tons.
Example: Cooling Capacity of 30,000 BTU/hr.
30,000/12,000 = 2.5 Tons
2. Determine the proper air ow for the cooling system.
Most cooling systems are designed to work with air
volume between 350 and 450 CFM per ton. Most
manufacturers recommend an air ow of about 400
CFM per ton.
Example: 2.5 tons X 400 CFM per ton = 1000 CFM
3. Select the heating speed for your model from the
heating speed chart in the Specication Sheet. The
selected speed must provide a temperature rise
within the rise range listed with the particular model.
Continuous Fan Mode Speed Selection
To change the main blower speed in circulation mode, see
the following steps:
1. Press left or right button until LED displays “FSd”.
Press center button and LED will display the
currently selected speed number as Fxx (xx: Blower
speed number from 1 to 9).
2. The control shall cycle through available fan speeds
every time the left/right button is pressed. All 9
speeds are available for circulation.
3. When the center button is pressed, the current
displayed speed shall stop ashing. Press the center
button again to select the option and the control shall
immediately apply that blower setting and return to
the corresponding main menu.
THERMOSTAT CALL
AVAILABLE SPEEDS
(FSd menu)
G
F01
F02
F03
F04
F05
F06
F07
F08
F09
Circulation Speed Table
Cooling Mode Speed Selection
To change the main blower speed in COOLING mode,
follow the following steps:
NOTE: If Heat Pump system is configured in OdS
menu (HP1 or HP2) COOLING thermostat calls will
include “Y1”/Y2” + “O” terminals energized.
1. Press left or right button until LED displays “AC1”
(for single stage COOLING) or “AC2” (for Two stage
COOLING). Press center button and the LED will
display the currently selected speed number as Fxx
(xx: Blower speed number from 1 to 9).
2. The control shall cycle through available fan speeds
every time the left/right button is pressed. All 9
speeds are available for both Single and Two Stage
cooling.
3. When the center button is pressed, the current
displayed speed shall stop ashing. Press the center
button again to select the option and the control shall
immediately apply that blower setting and return to
the corresponding main menu.
THERMOSTAT CALL
(OdS: Terminal)
AVAILABLE SPEEDS
(AC1 menu)
1AC: Y1
1HP: Y1 + O
F01
F02
F03
F04
F05
F06
F07
F08
F09
Single Stage Cooling Speed Table
THERMOSTAT CALL
(OdS: Terminal)
AVAILABLE SPEEDS
(AC2 menu)
2AC: Y1 + Y2
2HP: Y1 + Y2 + O
F01
F02
F03
F04
F05
F06
F07
F08
F09
Two Stage Cooling Speed Table
Gas Heating Mode Speed Selection
To change the main blower speed in GAS HEATING mode,
see the following steps:
1. Press left or right button until LED displays “gAF”.
Press center button and LED will display the
currently selected fan speed as Fxx (xx: Blower
speed number).
2. The control shall cycle through available speed
number every time the left/right button is pressed.
3. When the center button is pressed, the current
displayed speed shall stop ashing. Press the center
background
33
button again to select the option and the control shall
immediately apply that blower setting and return to
the corresponding main menu.
NOTE: Each furnace model contains different
allowable gas heating speeds. Allowable gas
heating speeds will be visible within gAF fan speed
menu.
Heat Pump Heating Mode Speed Selection
To change the main blower speed in Heat Pump HEATING
mode, follow the following steps:
1. Press left or right button until LED displays “HP1” (for
single stage HP HEATING) or “HP2” (for Two stage
HP HEATING). Press center button and the LED will
display the currently selected speed number as Fxx
(xx: Blower speed number from 1 to 9).
2. The control shall cycle through available fan speeds
every time the left/right button is pressed. All 9
speeds are available for both Single and Two Stage
HP HEATING.
3. When the center button is pressed, the current
displayed speed shall be selected, and control shall
apply the newly selected speed in next HP HEATING
call.
THERMOSTAT CALL
(OdS: Terminal)
AVAILABLE SPEEDS
(HP1 menu)
1HP: Y1
F01
F02
F03
F04
F05
F06
F07
F08
F09
Single Stage HP Heating Speed Table
THERMOSTAT CALL
(OdS: Terminal)
AVAILABLE SPEEDS
(HP2 menu)
2HP: Y1 + Y2
F01
F02
F03
F04
F05
F06
F07
F08
F09
Two Stage HP Heating Speed Table
In general lower heating speeds will: reduce electrical
consumption, lower operating sound levels of the blower,
and increase the outlet air temperature delivered to the
home. The speeds available allow the blower performance
to be optimized for the particular homeowner’s needs.
On/Off Fan Delay Selection
To change the fan on or o󰀨 delay for COOLING, HP
HEATING & GAS HEATING modes, see the following
steps:
1. Press left or right button until LED displays the desired
on/o󰀨 setting (See MAIN MENU section for selectable
blower on/o󰀨 delay options). Press center button
and LED will display the selected on/o󰀨 delay time in
seconds.
2. The control shall cycle through available on/o󰀨 delay
times every time the left/right button is pressed.
3. When the center button is pressed, the current
displayed on/o󰀨 delay shall stop ashing. Press
the center button again to select the option and the
control shall immediately apply that delay setting and
return to the corresponding main menu.
NORMAL SEQUENCE OF OPERATION
Power Up
The normal power up sequence is as follows:
• 115 VAC power applied to furnace.
• Integrated control module performs internal checks.
• LED will ash once at power up then remain on.
• Integrated control module monitors safety circuits
continuously.
• Furnace awaits call from thermostat.
Heating Mode
The normal operational sequence in heating mode is as
follows:
• R and W thermostat contacts close, initiating a call
for heat.
• Integrated control module performs safety circuit
checks.
• Induced draft blower is energized for 30 second
pre-purge period causing pressure switch contacts to
close.
• Igniter warm up begins after 15 second pre-purge
expires.
• Gas valve opens at the end of igniter warm up
period, delivering gas to burners and establishing
ame.
• Integrated control module monitors ame presence.
Gas valve will remain open only if ame is detected.
• Circulator blower is energized on high heat speed
following a xed 30 second blower on delay.
Electronic air cleaner and humidier terminal relays
are energized with circulator blower.
• Furnace operates; integrated control module
monitors safety circuits continuously.
• R and W thermostat contacts open, completing the
call for heat.
• Gas valve closes, extinguishing ame.
• Induced draft blower is de-energized following a
thirty second post purge.
• HUM terminal is de-energized.
• Circulator blower continues running for the selected
background
34
heat o󰀨 delay period. Factory set at 150 seconds. If
required this can be changed in the eld.
• EAC terminal is de-energized.
• Furnace awaits next call from thermostat.
Cooling Mode
The control board support two stages of cooling. If this
furnace is installed with a single stage cooling unit or heat
pump, the Y1 terminal of the control board must be used.
A Y2 call on the control board will be ignored if a Y1 call is
not present.
COOLING MODE SEQUENCE OF
OPERATION
1st Stage Cooling Mode Sequence:
• On a call for low stage cooling, the Y1 or Y1 and
G thermostat contacts close signaling the furnace
control board with 24 vac. on Y1 or Y1 and G
terminals.
• The 7-Segment will display: 1 A C
• The compressor and condenser fan are energized.
• The circulator fan is energized at low cool speed
after the cool on delay period. The electronic air
cleaner EAC relay will close the EAC contacts.
• After the thermostat is satised, the compressor and
condensor fan are de-energized and the Cool Mode
Fan O󰀨 Delay period begins.
• Following the Cool Mode Fan O󰀨 Delay period, the
indoor fan and air cleaner relays are de-energized.
2nd Stage Cooling Mode Sequence:
NOTE: A Y1 call must be present or a Y2 call will
be ignored.
• On a call for 2nd stage cooling, the Y2 or Y2 and
G thermostat contacts close signaling the furnace
control board with 24 vac. on Y2 or Y2 and G
terminals.
• The 7-Segment will display: 2 A C
• The compressor and condenser fan are energized.
• The circulator fan is energized at cool speed after a
cool on delay. The electronic air cleaner EAC relay
will close the EAC contacts.
• After the thermostat is satised, the compressor and
condensor fan are de-energized and the Cool Mode
Fan O󰀨 Delay period begins.
• Following the Cool Mode Fan O󰀨 Delay period, the
indoor fan and air cleaner relays are de-energized.
HEAT PUMP MODE
1st Stage HP Heating Mode Sequence:
• On a call for low stage HP Heating, the Y1 or Y1
and G thermostat contacts close signaling the
furnace control board with 24 vac. on Y1 or Y1 and G
terminals.
• The 7-Segment will display: 1 H P
• The compressor and condenser fan are energized.
• The circulator fan is energized at HP1 fan speed
after the HP on delay period. The electronic air
cleaner, EAC, and humidier, HUM, relays will close
the contacts.
• After the thermostat is satised, the compressor and
condensor fan are de-energized and the electronic
air cleaner EAC and humidier HUM relays de-
energize. The HP Heat Mode Fan O󰀨 Delay period
begins.
• Following the HP Heat Mode Fan O󰀨 Delay period,
the indoor fan, EAC, & HUM relays are de-energized.
2nd Stage HP Heating Mode Sequence:
NOTE: A Y1 call must be present or a Y2 call will
be ignored.
• On a call for 2nd stage HP Heating, the Y2 or Y2
and G thermostat contacts close signaling the
furnace control board with 24 vac. on Y2 or Y2 and G
terminals.
• The 7-Segment will display: 2 H P
• The compressor and condenser fan are energized.
• The circulator fan is energized at HP2 fan speed
after the HP on delay period. The electronic air
cleaner EAC and humidier HUM relays will close
the contacts.
• After the thermostat is satised, the compressor and
condensor fan are de-energized and the electronic
air cleaner EAC and humidier HUM relays de-
energize. The HP Heat Mode Fan O󰀨 Delay period
begins.
• Following the HP Heat Mode Fan O󰀨 Delay period,
the indoor fan, EAC, & HUM relays are de-energized.
Fan Only Mode
The normal operational sequence in fan only mode is as
follows:
• R and G thermostat contacts close, initiating a call
for fan.
• Integrated control module performs safety circuit
checks.
• Circulator blower is energized on heat speed.
• EAC terminal is energized.
• Circulator blower runs, integrated control module
monitors safety circuits continuously.
• R and G thermostat contacts open, completing the
call for fan.
• Circulator blower is de-energized.
• EAC terminal is de-energized.
• Furnace awaits next call from thermostat.
background
35
Defrost Mode
Defrost call can only be generated with heat pump outdoor
unit properly congured in the OdS menu.
• On a call for Defrost, the Y1 or Y1 with Y2 with/
without O contacts and W thermostat contacts close
signaling the furnace control board to enter defrost.
• If Y with O and W are present simultaneously, the
blower shall be energized at Cooling Speed after
COOL on delay, then, switch the blower speed to the
Greater of (Cooling Speed or Gas Heat speed) after
Gas Heat On Delay expired.
• If Y without O and W are present simultaneously, the
blower shall be energized at HP Heat Speed after
HP Heat On Delay, then, switch the blower speed to
the Greater of (HP Heat Speed or Gas Heat speed)
after Gas Heat On Delay expired.
• The 7-Segment will display: d F t
• The electronic air cleaner EAC and humidier HUM
relays will close the contacts.
• After the thermostat is satised, the gas valve will de-
energize. The Gas Heat Mode Fan O󰀨 Delay period
begins.
• Following the Gas Heat Mode Fan O󰀨 Delay period,
the indoor fan, EAC, & HUM relays are de-energized.
OPERATIONAL CHECKS
The burner ames should be inspected with the burner
compartment door installed. Flames should be stable,
quiet, soft, and blue (dust may cause orange tips but
they must not be yellow). Flames should extend directly
outward from the burners without curling, oating, or lifting
o󰀨. Flames must not impinge on the sides of the heat
exchanger ring tubes.
SAFETY CIRCUIT DESCRIPTION
WARNING
Do not bypass safety devices.
A number of safety circuits are employed to ensure safe
and proper furnace operation. These circuits serve to
control any potential safety hazards and serve as inputs
in the monitoring and diagnosis of abnormal function.
These circuits are continuously monitored during furnace
operation by the integrated control module.
Integrated Control Module
The integrated control module is an electronic device
which, if a potential safety concern is detected, will take the
necessary precautions and provide diagnostic information
through an LED.
Primary Limit
The primary limit control is located on the partition panel
and monitors heat exchanger compartment temperatures.
It is a normally-closed (electrically), automatic reset,
temperature-activated sensor. The limit guards against
overheating as a result of insu󰀩cient conditioned air
passing over the heat exchanger.
Auxiliary Limit
The auxiliary limit controls are located on or near the
circulator blower and monitors blower compartment
temperatures. They are a normally-closed (electrically),
automatic reset, temperature-activated sensor. These
limits guard against overheating as a result of insu󰀩cient
conditioned air passing over the heat exchanger.
Burner Temperature Switch
The burner temperature switch is mounted on the burner
assembly to monitor the burner box temperature. It is
normally closed (electrically), auto-reset sensor. This
switch guards against the burner ames not being properly
drawn into the heat exchanger.
Pressure Switches
The pressure switches are normally-open (closed during
operation) negative air pressure-activated switches. They
monitor the airow (combustion air and ue products)
through the heat exchanger via pressure taps located on
the induced draft blower and the coil front cover. These
switches guard against insu󰀩cient airow (combustion
air and ue products) through the heat exchanger and/or
blocked condensate drain conditions.
Flame Sensor
The ame sensor is a probe mounted to the burner
assembly which uses the principle of ame rectication to
determine the presence or absence of ame.
Pressure Sensor
Pressure sensor is mounted on the induced draft blower.
Its function is to regulate the induced draft blower’s speed
in order to maintain proper air-fuel ratio for clean and
reliable combustion.
TROUBLESHOOTING
WARNING
HIGH VOLTAGE!
To prevent property damage, personal injury
or death die to electrical shock, disconnect
electrical power to the furnace BEFORE
removing the filter or performing any other
maintenance.
Diagnostic Chart
Refer to the troubleshooting chart in the Appendix for
assistance in determining the source of unit operational
problems. The 3 digit diagnostic display provides alarm
codes to assist in troubleshooting the unit.
background
36
Fault Code Retrieval
The ignition control is equipped with push buttons that can
be used to view the last 10 faults detected by the control.
Press the left or right button until F10 is displayed. Press
the center button to view stored faults.
Clear Fault Memory
To clear all alarm codes, navigate to the last 10 faults menu,
F10, and hold the option button down for 5 to 30 seconds.
Resetting From Lockout
WARNING
To avoid personal injury due to electrical shock, turn off
power to the furnace before changing speed taps.
Furnace lockout results when a furnace is unable to
achieve ignition after three attempts during a single call for
heat. It is characterized by a non-functioning furnace and a
fault code displayed. If the furnace is in “lockout”, it will (or
can be) reset in any of the following ways.
1. Automatic reset. The integrated control module will
automatically reset itself and attempt to resume
normal operations following a one hour lockout
period.
2. Manual power interruption. Interrupt 115 volt power
to the furnace.
NOTE: If the condition which originally caused the
lockout still exists, the control will return to
lockout. Refer to the Troubleshooting Chart for
aid in determining the cause.
MAINTENANCE
WARNING
HIGH VOLTAGE!
To avoid personal injury or death due to elec-
trical shock, disconnect electrical power BE-
FORE performing any service or maintenance.
Annual Inspection
The furnace should be inspected by a qualied installer, or
service agency at least once per year. This check should
be performed at the beginning of the heating season.
This will ensure that all furnace components are in proper
working order and that the heating system functions
appropriately. Pay particular attention to the following
items. Repair or service as necessary.
• Flue pipe system: Check for blockage and/or
leakage. Check the outside termination and the
connections at and internal to the furnace.
• Heat exchanger. Check for corrosion and/or buildup
within the heat exchanger passageways.
• Burners. Check for proper ignition, burner ame, and
ame sense.
• Drainage system. Check for blockage and/or
leakage. Check hose connections at and internal to
furnace.
• Wiring. Check electrical connections for tightness
and/or corrosion. Check wires for damage.
• Filters.
• R-32 Sensor Wire. Check R-32 sensor wire
connection for tightness and check wire for damage.
background
37
FILTERS
Filter Maintenance
Improper lter maintenance is the most common cause of
inadequate heating or cooling performance. Filters should
be cleaned (permanent) or replaced (disposable) every two
months or as required. When replacing a lter, it must be
replaced with a lter of the same type and size.
Filter Removal
Depending on the installation, di󰀨ering lter arrangements
can be applied. Filters can be installed in either the central
return register or a side panel external lter rack (upow
only). A media air lter or electronic air cleaner can be used
as an alternate lter. Follow the lter sizes given in the
Recommended Minimum Filter size table 7 on page 27 to
ensure proper unit performance.
To remove lters from an external lter rack in an upright
upow installation, follow the directions provided with
external lter rack kit.
Horizontal Unit Filter Removal
Filters in horizontal installations are located in the central
return register or the ductwork near the furnace.
To remove:
1. Turn OFF electrical power to furnace.
2. Remove lter(s) from the central return register or
ductwork.
3. Replace lter(s) by reversing the procedure for
removal.
4. Turn ON electrical power to furnace.
Media Air Filter or Electronic
Air Cleaner Removal
Follow the manufacturer’s directions for service.
Burner
The Ultra Low NOx furnace uses a premix burner. The
burner box is sealed to achieve safe and reliable operation.
SCREW
SENSOR
GASKET
IGNITOR
GASKET
LIMIT
GASKET
BURNER BOX
Burner Box
Figure 40
Induced Draft and Circulator Blowers
The bearings in the induced draft blower and circulator
blower motors are permanently lubricated by the
manufacturer. No further lubrication is required. Check
motor windings for accumulation of dust which may cause
overheating. Clean as necessary.
Condensate Trap and Drain System
(Qualified Servicer Only)
Annually inspect the drain tubes, drain trap, and eld-
supplied drain line for proper condensate drainage. Check
drain system for hose connection tightness, blockage, and
leaks. Clean or repair as necessary.
Flame Sensor (Qualified Servicer Only)
Under some conditions, the fuel or air supply can create a
nearly invisible coating on the ame sensor. This coating
acts as an insulator causing a drop in the ame sense
signal. If the ame sense signal drops too low the furnace
will not sense ame and will lock out. The ame sensor
should be carefully cleaned by a qualied servicer using
emery cloth or steel wool. Following cleaning, the ame
sense signal should be as indicated in the Specications
Sheet.
Flue Passages (Qualified Servicer Only)
The heat exchanger ue passageways should be inspected
at the beginning of each heating season.
background
38
BEFORE LEAVING AN INSTALLATION
• Cycle the heating, cooling and fan only operations to
verify each operation is working properly.
• Review the Owner’s Manual with the homeowner
and discuss proper furnace operation and
maintenance.
• Leave literature packet near furnace.
REPAIR AND REPLACEMENT PARTS
• When ordering any of the listed functional parts, be
sure to provide the furnace model, manufacturing,
and serial numbers with the order.
• Although only functional parts are shown in the parts
list, all sheet metal parts, doors, etc. may be ordered
by description.
• Parts are available from your distributor.
Functional Parts List-
Gas Valve Blower Motor
Gas Manifold Blower Wheel
Natural Gas Orice Blower Mounting Bracket
Igniter Blower Cuto󰀨
Flame Sensor Blower Housing
Burner Temperature Switch Pressure Switches
Primary Limit Switch Burner Assembly
Coil Front Cover Drain Trap
Auxiliary Limit Switch Burner Box Gasket
Transformer Integrated Control Module
Door Switch Pressure Sensor
Induced Draft Blower
background
39
TROUBLESHOOTING CHART
Symptom
LED
Status
Fault Description Corrective Actions
Normal operation
I dL
Normal operation None
Furnace fails to
operate
EEE
Internal Faults or IRQ Loss in Control
Board
Replace integrated control board
Locate and correct gas interruption
Check front cover pressure switch operation and verify
proper drainage (hose, wiring, contact operation),
correct if necessary
Replace or realign igniter
Check flame sense signal, clean sensor if coated or
oxidized
Check flue piping for blockage, proper length, elbows,
and termination
Verify proper induced draft blower performance
Pressure switch circuit is closed at start
of heating cycle
Pressure switch contacts sticking
Short in pressure switch circuit wiring
Pressure switch circuit is not closed
Pressure switch hose blocked pinched,
or connected improperly
Inspect flue and/or inlet air piping for blockage, proper
length, elbows, and termination
Check drain system, correct as necessary
Check induced draft blower performance, correct as
necessary
Incorrect pressure switch set point or
malfunctioning switch contacts
Check pressure switch operation, replace as needed
Loose or improperly connected wiring Tighten or correct wiring connection
Primary limit circuit is open
Check filters and ductwork for blockage Clean filters or
remove obstruction
Insufficient conditioned air over the heat
exchanger
Check circulator blower speed and performance
Blocked filters, restrictive ductwork,
improper circulator blower speed, or
failed circulator blower motor
Correct speed or replace blower motor if necessary
Loose or improperly connected wiring in
high limit circuit
Tighten or correct wiring connection
Flame sensed with no call for heat Correct short at flame sensor or in flame sensor wiring
Short to ground in flame sense circuit
Lingering burner flame Slow closing gas
valve
Open fuse Replace fuse
Short in low voltage wiring Locate and correct short in low voltage wiring
No furnace operation
EE5
Induced draft blower
runs continuously with
no furnace operation
EE2
Inspect pressure switch hose, repair/replace if
necessary
Blocked flue and/or inlet air pipe, blocked
drain system or weak induced draft
blower
Circulator blower runs
continuously
No furnace operation
EE3
Induced draft blower
and circulator blower
runs continuously
No furnace operation
EE4
Check for lingering or lazy flame Verify proper operation
of gas valve
Furnace fails to
operate
EE0
Furnace lockout due to an excessive
number of ignition “retries” (3 total)
Failure to establish flame
Loss of flame after establishment
Furnace fails to
operate
EE1
Replace low stage pressure switch
Repair short in wiring
background
40
TROUBLESHOOTING CHART
Circulator blower runs
continuously
No furnace operation
EEd
Auxiliary limit circuit is open
Blocked filters, restrictive ductwork, improper
circulator blower speed, or failed circulator blower
motor
Loose or improperly connected wiring in high limit
circuit
Check filters and ductwork for blockage Clean filters or remove
obstruction
Correct speed or replace blower motor if necessary
Tighten or correct wiring connection
Furnace fails to operate
EbF
Inducer communication alarm
Check Red, Black, White harness & connections to inducer &
control board
Furnace fails to operate
E1b
Analog Pressure Sensor reference error
Check Red, Black, White harness & connections to inducer & control
board
Replace pressure sensor
Furnace fails to operate
E1C
Analog Pressure Sensor null error
Check Red, Black, White harness & connections to inducer & control
board
Check pressure hoses to pressure sensor and pressure
switch
Furnace fails to operate
E12
Reduntent relay open alarm
Replace integrated control board
Furnace fails to operate
E13
Reduntent relay stuck closed alarm
Replace integrated control board
Furnace fails to operate
EEb
Gas valve is not energized when it should be
External Gas Valve Error
Check wiring in gas valve circuit
Replace integrated control board
Furnace fails to operate
EEC
Gas valve is energized when it should not be
Internal gas valve error
Check wiring in gas valve circuit
Replace integrated control board
Normal furnace
operation
EE6
Flame sense micro amp signal is
minimal
Flame sensor is coated/oxidized
Flame sensor incorrectly positioned in burner
fame
Lazy burner flame due to improper gas pressure
or combustion air
Clean flame sensor if coated or oxidized Inspect for proper flame
sensor alignment
Check inlet air piping for blockage, proper length, elbows, and
termination
Compare current gas pressure to rating plate and adjust as needed
Furnace fails to operate
EEA
Polarity of 115 volt AC is reversed
Poor unit ground
Correct polarity, check and correct wiring if necessary
Verify proper ground, correct if necessary
Furnace fails to operate
E10
Grounding fault Poor neutral connection
Verify neutral wire connection to furnace & continuity to ground source
Furnace fails to operate
E11
Burner limit switch circuit is Open
Check for correct gas pressure
Check for correct burner alignment Check for and correct burner
restriction
Check burner temperature switch, replace if necessary
Symptom
LED
Status
Fault Description
Corrective Actions
background
41
TROUBLESHOOTING CHART
40
TROUBLESHOOTING CHART
Furnace fails to operate.
Integrated control module
LED display provides no
signal
No ne
No 115 power to furnace or no 24 volt power to
integrated control module.
Blown fuse or tripped circuit breaker
Integrated control module is non- functional
Restore high voltage power to furnace and integrated control
module.
Correct condition which caused fuse to open, replace fuse
Replace non-functional integrated control module.
Furnace stops heating and
only the fan is operating
EAF
Furnace has lost communication with the R-32
sensor and the furnace is in mitigation mode.
Verify wire connection to R-32 sensor is not loose. Verify that the R-
32 sensor wire is not damaged.
Replace R-32 Sensor.
Furnace stops heating and
only the fan is operating
EAL
R-32 sensor has detected a refrigerant leak and
furnace is in mitigation mode.
Investigate the indoor coil for a refrigerant leak.
Furnace will resume normal operation once a leak is not detected
and the 5 minute delay period is over.
Furnace stops heating and
only the fan is operating
EAS
R-32 sensor has detected a fault and the furnace
is in mitigation mode.
Investigate the R-32 sensor. Replace the R-32 sensor.
Furnace stops heating and
only the fan is operating
Ear
A2L relay in the furnace control board has
detected a fault and the furnace is in mitigation
mode.
Investigate A2L relay.
Cycle power on the furnace.
Replace integrated control board.
Twinning feature not working
EEH TWIN Error
Check for wiring connections. Replace integrated control
board
Furnace fails to operate and
goes to hard lockout
EbL
Main blower motor is consuming very little current
after heat on delay, below an expected value
Check for loose motor wiring connections. Verify the blower motor
voltage, amps and proper speed setting. If blower motor is not operating
correctly, replace the motor.
Furnace fails to operate and
goes to hard lockout
EbU
Main blower motor is consuming too much current
during inducer pre-purge, above an expected
value.
Verify wiring connections to and from motor are not loose.
Verify that line voltage wires to the control and the main blower
motor are not reversed at the control.
Furnace fails to operate
Ed0
No Shared data
Populate shared data set using BTPIM01
Symptom
LED
Status
Fault Description
Corrective Actions
Furnace fails to operate
E1d Analog Pressure Sensor span error
Check Red, Black, White harness & connections to inducer &
control board
Check pressure hoses to pressure sensor and pressure switch
Furnace fails to operate
E1E
Analog Pressure Sensor pressure error
Check Red, Black, White harness & connections to inducer &
control board
Replace pressure sensor
Furnace fails to operate
E1F
Analog Pressure Sensor input error
Check Red, Black, White harness & connections to inducer &
control board
Replace pressure sensor
background
42
AIRFLOW
0.10
0.20 0.30 0.40
CFM CFM CFM CFM CFM WATTS CFM WATTS CFM WATTS CFM WATTS
F01 714 667 620 573 528 100 483 106 439 111 394 117
F02 841 803 765 725 686 139 645 145 605 151 565 157
F03 862 823 784 745 706 144 666 151 626 158 586 165
F04 1043 1011 976 945 912 219 879 227 845 235 810 243
F05^ 1080 1051 1021 990 961 246 932 255 903 262 867 270
F06 1182 1155 1129 1102 1075 298 1048 307 1020 316 992 325
F07 1193 1164 1136 1108 1080 306 1052 315 1025 324 997 334
F08^^ 1280 1256 1231 1206 1183 370 1156 378 1132 388 1107 398
F09 1333 1306 1280 1255 1231 399 1205 408 1180 417 1155 427
F01 767 712 655 592 528 101 476 107 431 113 388 118
F02 919 871 824 774 723 149 665 156 612 163 565 170
F03 925 889 842 797 748 153 693 160 636 169 589 176
F04^ 1099 1060 1018 977 935 222 891 230 848 239 803 248
F05 1125 1086 1047 1008 970 235 931 244 885 253 844 262
F06 1239 1200 1163 1127 1095 290 1053 296 1014 305 974 314
F07^^ 1317 1283 1249 1214 1179 350 1146 361 1110 372 1073 383
F08 1337 1304 1269 1235 1206 353 1167 362 1133 371 1097 382
F09 1415 1383 1353 1321 1288 387 1256 397 1222 407 1190 418
F01 999 934 877 814 740 143 681 153 615 160 554 167
F02 1297 1245 1194 1143 1096 238 1044 247 991 257 933 267
F03 1407 1354 1307 1257 1210 285 1164 297 1118 308 1067 319
F04^ 1532 1488 1440 1396 1352 344 1304 356 1259 367 1210 378
F05^^ 1641 1594 1552 1509 1477 409 1425 418 1388 432 1347 444
F06 1687 1644 1604 1560 1519 439 1479 453 1441 467 1409 484
F07 1831 1791 1755 1718 1680 544 1642 558 1607 573 1570 589
F08 1895 1860 1822 1788 1753 601 1716 616 1684 633 1650 650
F09 2298 2260 2222 2182 2149 920 2114 934 2087 946 2022 1889
*R9S960603BU*
Y1 / Y2 / G
Default speed is F01 for circulation for all models
^ Default Y1 speed
^^ Default Y2 speed
NOTE: Watts provided are blower motor watts. Undersized duct size may affect the blower watts performance
AR9S96-U / GR9S96-U COOLING & CIRCULATION AIRFLOW
EXTERNAL STATIC PRESSURE, (INCHES WATER COLUMN)
0.50
0.60
0.70
0.80
MODEL
THERMOSTAT
CALL
TAP #
*R9S960403BU*
Y1 / Y2 / G
*R9S960805CU*
Y1 / Y2 / G
background
43
AIRFLOW
0.60 0.70 0.80
CFM RISE CFM RISE CFM RISE CFM RISE CFM RISE CFM CFM CFM
F04^ 1043 34 1011 35 976 36 945 38 912 39 879 845 810
F05 1080 33 1051 34 1021 35 990 36 961 37 932 903 867
F04 1099 49 1060 50 1018 52 977 55 935 57 891 848 803
F05 1125 47 1086 49 1047 51 1008 53 970 55 931 885 844
F06^ 1239 43 1200 44 1163 46 1127 47 1095 49 1053 1014 974
F03 1407 51 1354 53 1307 54 1257 57 1210 59 1164 1118 1067
F04^ 1532 46 1488 48 1440 49 1396 51 1352 53 1304 1259 1210
^ DEFAULT HEATING SPEED
30 - 60
30 - 60
AR9S96-U / GR9S96-U HEATING AIFLOW
MODEL
THERMOST
AT CALL
TAP #
EXTERNAL STATIC PRESSURE, (INCHES WATER COLUMN)
TEMP
RANGE
0.10
0.20
0.30
0.40
0.50
*R9S960403BU*
15 - 45
*R9S960603BU*
W/W1
W/W1
*R9S960805CU*
W/W1
background
44
HIGH VOLTAGE!
Disconnect ALL power before servicing or installing this unit. Multiple
power sources may be present. Failure to do so may cause property
damage, personal injury or death.
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
WIRING DIAGRAM *R9S96**
GR
GND
JUNCTION
BOX
WARNING:DISCONNECT
N
TO UNIT MUST BE
AND GROUNDED.
L
SERVICING. WIRING
DISCONNECT
GND
WH
BK
POWER BEFORE
PROPERLY POLARIZED
0140F20035-A
Ø /60 HZ
OVERCURRENT
115 VAC/ 1
TO
POWER SUPPLY WITH
PROTECTION
DEVICE
BURNER COMPARTMENT
BLOWER
COMPARTMENT
DOOR-SWITCH
(OPEN WHEN
DOOR OPEN)
RD
ECM MTR
HARNESS
BK
RD
GR
BK
BK
YL
FLAME SENSOR
GY
1
2
M
C
BLOWER COMPARTMENT
AUTO RESET AUXILIARY
LIMIT CONTROL
RD
RD
AUTO RESET
PRIMARY
LIMIT CONTROL
BK
GND
BLOWER
DRAFT (ID)
INDUCED
1
2
3
RD
WH
BK
RD
WH
2 CIRCUIT
CONNECTOR
HOT
SURFACE
IGNITER
WH
PK
BK
RD
WH
2
1
WH
WH
BL
YL
BK
OR
RD
BL
WH
BK
BK
NOTE 5
NOTE 6
CR48
E28
E5
E22
E47
W11
BLW
E32
YL
WH
E4
PK
PU
AUTO RESET
BAFFLE
LIMIT
GAS VALVE
BR
NO
C
PU
PU
AUTO RESET
BURNER BOX
LIMIT
AUTO RESET
AUXILIARY
LIMIT
CONTROL
PK
YL
PU
PK
TAP1
E23
NEUTRAL
E46
E25
E26
E19
W12
WH
MOB_PE
TAP2
TAP3
TAP4
TAP5
GND
FS
E39
E41
U
V
W
LINE
N
H
FUSE
GY
YL
NO
C
ID BLOWER
PRESSURE
SWITCH
YL
PRESSURE TRANSDUCER
BK
RD
GR
2
1
3
4
UNUSED
5V
GND
PI
A2L MODE IS ENABLED BY DEFAULT
REFER TO INSTALLATION MANUAL FOR FURTHER
INSTRUCTIONS.
SW1
SW2
E35
IN
OUT
E42
EAC
W2
W1
B\C
R
G
Y1
TWIN
Y2
PSO
BLI
MVH
MVL
GND
HLI
TH
MVC
HLO
PS1
TR
ALI
GND
PI
5V
E18
A2L
A2L
ALARM
HUM
VENT
0
PK
PK
GY
RD
GR
BR
PU
YL
COLLECTOR BOX
PRESSURE SWITCH
YL
1
12
NOTES :
1. MANUFACTUR'S SPECIFIED REPLACEMENT
PARTS MUST BE USED WHEN SERVICING.
2. IF ANY OF THE ORIGINAL WIRE AS SUPPLIED
WITH THE FURNACE MUST BE REPLACED, IT
MUST BE REPLACED WITH WIRING MATERIAL
HAVING A TEMPERATURE RATING OF AT LEAST
105
C. USE COPPER CONDUCTORS ONLY.
3. BLOWER SPEEDS SHOULD BE ADJUSTED BY
INSTALLER TO MATCH THE INSTALLATION
REQUIREMENTS SO AS TO PROVIDE
THE CORRECT HEATING TEMPRATURE
RISE AND THE CORRECT COOLING CFM.
4. UNIT MUST BE PERMANENTLY GROUNDED
AND CONFORM TO N.E.C. AND LOCAL CODES.
5. EAC. NORMALLY OPEN CONTACTS FOR OPTIONAL
ELECTRONIC AIR CLEANER USE. CONTACTS
CLOSE
WHEN INDOOR BLOWER IS RUNNING. TERMINALS
ARE NOT INTERNALLY POWERED
6. HUM. NORMALLY OPEN CONTACTS FOR OPTIONAL
HUMIDIFIER USE. CONTACTS CLOSE WHEN DRAFT
INDUCER IS RUNNING. TERMINALS ARE NOT
INTERNALLY POWERED
7. WHEN THIS FURNACE IS PAIRED WITH NON R-32
REFRIGERANT SYSTEMS, DEFAULT SETTINGS WILL
NEED TO BE CHANGED. REFER TO INSTALLATIONS
MANUAL FOR FURTHER INSTRUCTIONS.
PK
COLOR CODES:
RD
GY
WH
PU
OR
YL
BL
BR
BK
GR
BLUE
BROWN
BLACK
GREEN
PINK
GRAY
PURPLE
ORANGE
RED
WHITE
YELLOW
SWITCH (PRESSURE)
FIELD SPLICE
FIELD GROUND
EQUIPMENT GROUND
INTERNAL TO
PROTECTION DEVICE
INTEGRATED CONTROL
PLUG CONNECTION
SWITCH (TEMPERATURE)
JUNCTION
OVERCURRENT
TERMINAL
IGNITER
HIGH VOLTAGE (115V)
HIGH VOLTAGE FIELD
LOW VOLTAGE (24V)
LOW VOLTAGE FIELD
NO
C
STATUS & FAULT
(SEE INSTALLATION MANUAL FOR COMPLETE LIST OF FAULTS)
SEVEN SEGMENT DISPLAY
Seg. 1 Seg. 2 Seg. 3
IDLE I d L
CONTINIOUS FAN F A n
LOW STAGE COOLING 1 A C
HIGH STAGE COOLING 2 A C
GAS HEAT g H
HEAT PUMP HEAT, LOW STAGE 1 H P
HEAT PUMP HEAT, HIGH STAGE 2 H P
DEFROST d F t
LOCKOUT DUE TO EXCESSIVE RETRIES RECYCLE E E 0
PRESSURE SWITCH CLOSED WHEN ECPECTED TO BE OPEN E E 1
PRESSURE SWITCH OPEN WHEN EXPECTED TO BE CLOSED E E 2
OPEN HIGH LIMIT SWITCH E E 3
FLAME DETECTED WHEN NO FLAME SHOULD BE PRESENT E E 4
OPEN FUSE E E 5
LOW FLAME SIGNAL E E 6
IGNITOR FAULT OR IGNITOR RELAY FAULT E E 7
REVERSED LINE POLARITY E E A
GROUNDING ERROR E 1 0
INTERNAL GAS VALVE ERROR E E b
EXTERNAL GAS VALVE ERROR E E C
STATUS & FAULT
(SEE INSTALLATION MANUAL FOR COMPLETE LIST OF FAULTS)
SEVEN SEGMENT DISPLAY
Seg. 1 Seg. 2 Seg. 3
AUXILLIARY LIMIT SWITCH OPEN E E d
BURNER LIMIT SWITCH OPEN E 1 I
LOW CIRCULATOR CURRENT E b L
CIRCULATOR CURRENT UNEXPECTED E b U
A2L COMMUNICATION ALARM E A F
A2L LEAKAGE ALARM E A L
A2L INTERNAL ALARM E A S
A2L RELAY ALARM E A r
RD
BLOWER
CIRCULATOR
BK
GR
RD
3
1
WH
2
4
BL
5 4 3
2 1
RD
OR
BK
YL
24
VAC
WH
40 VA
TRANS-
FORMER
115
VAC
BK
GND
GROUND WIRE
CONNECTED
TO CONTROL
MOUNTING PANEL
background
45
START-UP CHECKLIST
Furnace
ELECTRICAL
Line Voltage (Measure L1 to N and N to Ground Voltage) L - N
N - G
Secondary Voltage (Measure Transformer Output Voltage) R - C
Blower Amps
BLOWER EXTERNAL STATIC PRESSURE
Return Air Sta�c Pressure IN. W.C.
Supply Air Sta�c Pressure IN. W.C.
Total External Sta�c Pressure (Ignoring +/- from the reading above, add total here) IN. W.C.
TEMPERATURES
Return Air Temperature (Dry bulb / Wet bulb) DB °F WB °F
DB °F WB °F
Hea�ng Supply Air Temperature DB °F
Temperature Rise DB °F
Delta T (Differenc
e between Supply and Return Temperatures) DB °F
GAS PRESSURES
Gas Inlet Pressure IN. W.C.
Gas Manifold Pressure (Low Fire) IN. W.C.
Gas Manifold Pressure (High Fire) IN. W.C.
Gas Type (NG) = Natural Gas / (LP) = Liquid Propane
Addi�onal Checks
Check wire rou�ngs for any rubbing
Check for kinked pressure switch tubing.
Check flue elbow for alignment and clamp �ghtness.
Check screw �ghtness on blower wheel.
Check factory wiring and wire c
onnec�ons.
Check product for proper clearances as noted by installa�on instruc�ons
°F to °C formula: (°F - 32) divided by 1.8 = °C °C to °F formula: (°C mul�plied by 1.8) + 32 = °F
Model Number
Serial Number
Cooling Supply Air Temperature (Dry bulb / Wet bulb)
Check R-32 sensor wire is connected properly (if applicable)
background
46
THIS PAGE INTENTIONALLY LEFT BLANK
background
47
THIS PAGE INTENTIONALLY LEFT BLANK
background
48
GOODMAN® BRAND
AMANA® BRAND
CUSTOMER FEEDBACK
We are very interested in all product comments.
Please ll out the feedback on one of the following links:
Goodman® Brand Products: (http://www.goodmanmfg.com/about/contact-us).
Amana® Brand Products: (http://www.amana-hac.com/about-us/contact-us).
You can also scan the QR code on the right for the product brand
you purchased to be directed to the feedback page.
19001 Kermier Rd., Waller, TX 77484
www.goodmanmfg.com • www.amana-hac.com
© 2024-2025 Daikin Comfort Technologies Manufacturing, L.P.
is a registered trademark of Maytag Corporation or its related companies and is used under license. All rights reserved.

Specifications

Indexed Terms: Gas Furnace, 96% AFUE

Goodman GR9S960603BN Questions and Answers

Questions and Answers

Related Products