Majestic WARMMAJICD WarmMajic II 40 inch Wood Fireplace, Heat Zone, 2.7 Cubic Firebox

Product's Documents

Below are documents related to this product, you can read online or download:
Installation Instruction User Manual
WARMMAJICD photo

Installation Guide.

This is the main product document for model WARMMAJICD.

The file format is pdf, 49 pages, you can download this manual here .

background
EPA CERTIFIED WOODBURNING
FIREPLACE
Model(s):
Installation Manual
Installation and Fireplace Setup
WARNING
HOT SURFACES!
Glass and other surfaces are hot during
operation AND cool down.
Hot glass will cause burns.
• DO NOT touch glass until it is cooled
• NEVER allow children to touch glass
• Keep children away
• CAREFULLY SUPERVISE children in same room as
replace.
• Alert children and adults to hazards of high temperatures.
High temperatures may ignite clothing or other ammable
materials.
• Keep clothing, furniture, draperies and other ammable
materials away.
INSTALLER: Leave this manual with party responsible for use and operation.
OWNER: Retain this manual for future reference.
WARMMAJIC-D
Pour demander un exemplaire en
français de ce Manuel
dupropriétaire,visitezwww.re-
places.com/translations.
Installation andservice of this appliance should be performed by
qualied personnel, Hearth & Home Technologies recommends
HHTFactoryTrainedorNFIcertiedprofessionals.
Contact your dealer with questions on installation, operation, or service.
• Read all the instructions before starting
the installation. Follow these instructions
carefully during the installation to ensure
maximumsafetyandbenet.
• Comply with all minimum clearances to com-
bustiblesasspecied.Failuretocomplymay
causehousere.
WARNING! Risk of Fire and/or Asphyxiation!
1
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Safety Alert Key:
• DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.
• WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.
• CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
• NOTICE:Indicatespracticeswhichmaycausedamagetothereplaceortoproperty.
1 Product Specic & Important Safety Information
A.ApplianceSafetyCertication 4
B.ApplianceEmissionsCertication 4
C.BTUE󰀩ciencySpecications 4
D.MobileHomeApproved 4
E.GlassSpecications 5
F. Non-CombustibleMaterials 5
G.CombustibleMaterials 5
H.ElectricalCodes 5
2 Getting Started
A.TypicalFireplaceSystem 6
B. Design and Installation Considerations 7
1. Selecting Fireplace Locations 7
2.LocatingFireplace&Chimney 8
C.ToolsandSuppliesNeeded 9
D.InspectFireplaceandComponents 9
E.FireplaceSystemRequirements 9
F. LowerAccessPanelRemovalandInstallation 9
3 Framing and Clearances
A. Appliance Dimensions/Weight 10
B. Clearances 11
C. Construct the Chase 12
D. Frame the Fireplace 12
E. Secure and Level the Fireplace 13
F. InstallationofTopStando󰀨s 14
G.ProtectiveMetalHearthStrips 14
H.Non-CombustibleFacingBoard(Provided) 15
I. OutsideAirKit 15
J. Heat-Zone-WD-CKit(Optional) 18
4 Electrical Wiring 22
5 Chimney and Termination Requirements
A. Chimney Requirements 23
B.O󰀨sets/Returns 24
C.TerminationRequirements 25
6 Chimney Installation
A.TypicalChimneySystem 26
B.AssembleChimneySections 27
C.InstallChimneyAirkit(CAK4A) 27
D.SecureO󰀨set/Return 28
E.InstallFirestops 29
F. Install Attic Insulation Shield 30
G. Roof Penetration 31
H.ManufacturedHomeInstallation 31
I. InstallChase/ChaseTop 32
J. InstallTerminationCap 33
7 Shrouds
A.RadiationShield 35
B.FieldConstructedShrouds 35
1.OpenTopShroud 35
2.MailboxStyleShroud 36
3.RoofedStyleShroud 36
8 Finishing
A.Template 37
B. Finish the Wall 37
1. Stone, Brick Finish 37
2.Tile,Granite,MarbleFinish 38
C.MantelandWallProjections 38
D.FinishingtheHearthExtension 39
E.Non-CombustibleSealantMaterial 40
9 Fireplace Setup
A.FirebrickPlacement 41
B.Ba󰀪eandBlanketPlacement 42
C.InstallFascia(Fronts) 42
10 Reference Materials
A.ChimneyComponents 43
B.Accessories 47
C.O󰀨setDiagrams 48
Table of Contents
►
2
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Customer:
Lot/Address
Model:
WARMMAJIC-D
YES IF NO, WHY?
Fireplace Install Section 3 (page 10-21)
Verified that the chase is insulated and sealed.
Required top standoffs installed.
Requirednon-combustibleboardisinstalled.
Verifiedclearancestocombustibles.
Fireplace is leveled and secured.
Hearthextensionsize/heightdecided.
Outside air kit installed.
OptionalHeatZonehasbeeninstalledbyaqualifiedservicetechnician.
Chimney Section 5 & 6 (page 23-34)
Chimney configuration complies with diagrams.
Chimney installed, locked and secured in place with proper clearance.
Chimney air kit installed.
Firestops installed.
Attic insulation shields installed.
Roof flashing installed and sealed.
Terminationsinstalledandsealed.
Electrical Section 4 (page 22)
Switch wires properly installed.
Dealer/Distributor Phone #
Serial #:
WARNING! Risk of Fire or Explosion! Failure to install fireplace acording to these instructions can lead to a fire or
explosion.
ATTENTION INSTALLER:
Follow this Standard Work Checklist
Thisstandardworkchecklististobeusedbytheinstallerinconjuctionwith,notinsteadof,theinstructionscontainedinthisinstallation
manual.
Date Installed:
Location of Fireplace:
Installer:
Finishing Section 7 (page 35-38)
CombustibleCombustible materialsmaterials notnot installedinstalled ininnon-non-combustiblecombustible areasareas.
Verified all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Protective hearth strips and hearth extension installed per manual requirements.
Fireplace Setup Section 8 (page 39-40)
All packaging and protective materials removed.
Firebrick,baffleandceramicblanketinstalledcorrectly.
Facia and doors properly installed.
Manualbagandallofitscontentsareremovedfrominside/underthefireplaceand
giventothepartyresponsibleforuseandoperation.
All packaging materials are removed from inside/under the fireplace.
Hearth & Home Technologies recommends the following:
•
Photographing the installation and copying this checklist for your file.
•
Thatthischecklistremainvisibleatalltimesonthefireplaceuntiltheinstallationiscomplete.
Commentscommunicatedtopartyresponsible
Part # 4188-982 • Rev C • 3/25
__________________________by______________________on_________
(Builder/Gen.Contractor)(Installer)(Date)
Comments:Furtherdescriptionoftheissues,whoisresponsible(Installer/Builder/OtherTrades,etc.)andcorrectiveactionneeded:
_________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
3
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
1 1
Product Specic & Important Safety Information
Model:
WARMMAJIC-D
Laboratory: Underwriter’sLaboratories,Inc.
Report No:
Project4789042842
Type:
Wood Fireplace
Standard: UL127-2011andCAN/ULC-S610-
2018(A1998)and(UM)84-HUD,
ManufacturedHomeApproved.
A. Appliance Safety Certication
D. Mobile Home Approved
Thisapplianceisapprovedformobilehomeinstallations
when not installed in a sleeping room and when an outside
combustionairinletisprovided.Thestructuralintegrityof
the mobile homeoor, ceiling, and walls must be main-
tained.Theappliancemustbeproperlygroundedtothe
frameofthemobilehomeanduseonlylisteddouble-wall
connector pipe.
E. Glass Specications
Thisapplianceisequippedwith5mmceramicglass.
Replaceglassonlywith5mmceramicglass.Please
contact your dealer for replacement glass.
C. BTU & E󰀩ciency Specications
Hearth & HomeTechnologies WILLNOT warranty appli-
ances that exhibit evidence of over-ring. Evidence of
over-ringincludes,butisnotlimitedto:
• Warpedairtube
• Deterioratedrefractorybrickretainers
• Deterioratedba󰀪eandotherinteriorcomponents
NOTE: Thisinstallationmustconformwithlocalcodes.Inthe
absenceoflocalcodesyoumustcomplywiththeUL127-2011,
(UM) 84-HUD and NPFA211 in the U.S.A. and the CAN/ULC
S610-2018 (A1998) and CAN/CSA-B365 Installation Codes
in Canada.
TheWARMMAJIC-DWoodAppliancesmeettheU.S.ENVIRON-
MENTALPROTECTIONAGENCYCertiedtocomplywith2020
particulateemissionstandardsusingcribwood.
EPACertiedEmissions: 1.7 g/hr
*LHVTestedE󰀩ciency: 73%
**HHVTestedE󰀩ciency: 69%
***EPABTUOutput: 20,900BTU/hr
****PeakBTU/HourOutput: 81,000BTU/hr
VentSize: 8inches
FireboxSize: 2.75cubicfeet
RecommendedLogLength: 22 inches
Fuel Seasoned Cord Wood less
than 20% moisture
HHT: SL300 Series
DuraVent: DuraPlus
*Weighted average LHV (Low Heating Value) e󰀩ciency using crib
woodanddatacollectedduringEPAemissiontest.LHVassumesthe
moisture is already in a vapor state so there is no loss in energy to
vaporize.
**Weighted average HHV (High Heating Value) e󰀩ciency using crib
woodanddatacollectedduringEPAemissiontest.HHVincludesthe
energy required to vaporize the water in the fuel.
***BTUoutputsbasedonHHV(HighHeatingValue)andtheburnrate
fromEPAtestsusingcribwood.
****A peak BTUout of the appliancecalculated using the maximum
rsthourburnratefromtheHighEPATestandBTUcontentofsea-
sonedcordwood(8600)timesthee󰀩ciency.
WARMMAJIC-D are Certied to com-
ply with 2020 particulate emission
standards.
DO NOT:
• installoroperatedamagedreplace
• modifyreplace
• install other than as instructed by Hearth & Home
Technologies
• operate the fireplace without fully assembling all
components
• install unvented gas log set
• installanycomponentnotapprovedbyHearth&Home
Technologies
• installpartsorcomponentsnotListedorapproved
Improper installation, adjustment, alteration, service or
maintenance can cause injury or property damage. For
assistance or additional information, consult a qualied
installer,serviceagencyoryourdealer.
WARNING! Risk of Fire! Hearth & HomeTechnologies
disclaims any responsibility for, and the warranty and
agencylistingwillbevoidedbytheaboveactions.
B. Appliance Emissions Certication
Thiswoodheaterneedsperiodicinspectionandrepairforproper
operation. It is against federal regulations to operate this wood
heater in a manner inconsistent with operating instructions in this
manual.
Model:
WARMMAJIC-D
Laboratory: PFSTECO
Report No:
24-321
Standard:
EPAMethod28R,ASTME2515,
ASTME2780andCSAB415.1
Can be found at:
www.replaces.com/shopping-tools/epa-certications
4
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
H. Electrical Codes
NOTICE: This replace must be electrically wired and
grounded in accordance with local codes or, in the
absenceoflocalcodes,withNational Electric Code ANSI/
NFPA 70-latest edition or the Canadian Electric Code
CSA C22.1.
• A110-120VACcircuitforthisproductmustbeprotected
with ground-fault circuit-interrupter protection, in
compliancewiththeapplicableelectricalcodes,when
it is installed in damp locations.
WARNING! Improper installation, adjustment, alteration,
serviceormaintenancecancauseinjuryorpropertydam-
age.
F. Non-Combustible Materials
Materialwhichwillnotigniteandburn,composedofany
combinationofthefollowing:
- Steel - Plaster
- Brick - Iron
-Concrete -Tile
- Glass - Slate
Materials reported as passing ASTM E 136, Standard
Test Method for Behavior of Metals, in a Vertical Tube
Furnace of 750° C.
G. Combustible Materials
Material made of or surfaced with any of the following
materials:
- Wood - Compressed Paper
-PlantFibers -Plastic
-Plywood/OSB -SheetRock(drywall)
-Foaminsulation&sealants
Anymaterialthatcanigniteandburn:ameproofedor
not, plastered or un-plastered.
5
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
2 2
Getting Started
Figure 2.1 Typical Fireplace System
Termination Cap
Chimney penetrates roof
preferably without affecting
roof rafters
Offset/Return
(with hanger straps)
Attic insulation shield
must be used to keep
insulation away
from chimney if
attic is insulated
Storm Collar
Framing headed
off in ceiling joists
Mantel
Chimney system
Combustible
framing/header
Non-combustible material
Hearth extension
Non-combustible
roof flashing maintains
minimum clearance
around chimney
Additional lateral
support for chimney
above roof (or enclosed
in chase) if needed
Enclosed space above
and around fireplace
Ceiling firestop
on floor of attic
Support straps
on rafter supports
chimney (not shown)
Outside
combustion air
Outside
combustion air
Chimney Air Kit (CAK-4A) (not
shown) must be used with SL300
chimney
Protective metal
hearth strip(s)
A. Typical Fireplace System
6
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Figure 2.2 Fireplace Locations
NOTICE:
• Illustrationsandphotosreecttypicalinstallationsand
are FORDESIGNPURPOSESONLY.
• Illustrations/diagramsarenotdrawntoscale.
• Actualinstallation/appearancemayvaryduetoindividual
designpreference.
• Hearth&HomeTechnologiesreservestherighttoalter
itsproducts.
NOTICE: In addition to these framing dimensions, also
referencethefollowingsection:
• Clearances(Section3).
NOTICE:
A minimum 1/2 in.air clearanceat theback and
aminimum1in.air clearancetothe sidesofthe
replaceassemblymustbemaintained.
Chimneysectionsatanylevelrequirea2in.mini-
mumairspaceclearancebetweentheframingand
chimneysections.
B. Design and Installation Considerations
NOTICE: Checkbuildingcodespriortoinstallation.
• InstallationMUSTcomplywithlocal,regional,stateand
national codes and regulations.
• Consultinsurancecarrier,localbuildinginspector,re
o󰀩cialsorauthoritieshavingjurisdictionoverrestrictions,
installation inspection and permits.
1. Selecting Fireplace Locations
This replace may be used as a room divider, installed
along a wall, across a corner or used in an exterior chase.
See Figure 2.2.
Locating the replace in a basement, near frequently
opened doors, central heat outlets or returns, or other loca-
tionsofconsiderable airmovementcana󰀨ecttheperfor-
mance.
Outsideairmustbeusedforcombustion.TheWARMMA-
JIC-D comes equipped with an outside air inlet to feed
combustionairfromoutsidethehome,alongwithanout-
sideairterminationcap;themetalductisrequiredbutnot
supplied. Consideration should be givento these factors
beforedecidingonalocation.
24*
[610]
42-1/2 [1080]
66-1/2 [1689]
16 [406]
42-1/2 [1080]
66-1/2 [1689]
16 [406]
24*
[610]
24*
[610]
42-1/2
[1080]
54-1/2
[1384]
16
[406]
48 [1219]
89-1/2
[2273]
42-1/2
[1080]
63-5/16 [1608]
44-3/4
[1137]
22-3/4*
[578]
22-3/4*
[578]
Across a corner
In an exterior chase
*If interior of chase will be
drywalled, add the thickness
to this measurement.
Along a wall
As a divider
Faceplate to sidewall 16 inches
7
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
2. Locating Fireplace & Chimney
Locationofthereplaceandchimneywilla󰀨ectperfor-
mance.
• Installwithinthewarmairspaceenclosedbythebuilding
envelope.Thishelpstoproducemoredraft,especially
duringlightinganddie-downofthere.
• Penetratethehighestpartoftheroof.Thisminimizes
thee󰀨ectsofwindloading.
• Locate termination cap away from trees, adjacent
structures,unevenrooflinesandotherobstructions.
• Minimizetheuseofchimneyo󰀨sets.
• Considerthereplacelocationrelativetooorandceiling
and attic joists.
• Takeintoconsiderationtheterminationrequirementsin
Sections5and6.
Marginal Location:
• Below peak
Location NOT recommended:
• Not the highest point of the roof
• Wind loading possible
Multi-level Roofs
Windward
Leeward
Recommended Location:
• Above peak
Recommended:
• Insulated exterior chase
in cooler climates
Recommended Location:
• Above peak
• Inside heated space
Location NOT recommended:
• Too close to tree
• Below adjacent structure
• Lower roof line
• Avoid outside wall
Marginal Location:
• Wind loading possible
Not recommended in basement due
to high negative pressure concerns
that effect draft
Figure 2.3 Recommended Chimney Locations
• InstalltheoutsideairkitandCAK(chimneyairkit)with
the intake facing prevailing winds during the heating
season.
• Ensure adequate outdoor air for all combustion
appliances and exhaust equipment.
• Ensure furnace and air conditioning return vents are not
locatedintheimmediatevicinityofthereplace.
• Avoidinstallingthereplaceneardoors,walkwaysor
small isolated spaces.
• Recessedlightingshouldbea“sealedcan”design.
• Attic hatches weather stripped or sealed.
• Attic mounted duct work and air handler joints and seams
taped or sealed.
8
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
D. Inspect Fireplace and Components
WARNING! Risk of Fire and Asphyxiation! Damaged
partscouldimpairsafeoperation.DO NOT install dam-
aged,incompleteorsubstitutecomponents.
• Removereplaceandcomponentsfrompackagingand
inspect for damage.
• Chimney system components and other optional
components are shipped separately.
• Report to your dealer any parts damaged in shipment.
C. Tools and Supplies Needed
Beforebeginningtheinstallationbesurethefollowing
toolsandbuildingsuppliesareavailable:
Reciprocating saw Framing material
Pliers Misc. screws and nails
Hammer Gloves
Phillips screwdriver Framing square
Flatbladescrewdriver Electricdrillandbits
Plumbline Safetyglasses
Level Tapemeasure
1/2-3/4in.length,#6or#8self-drillingscrews
Non-combustible300°siliconesealant
E. Fireplace System Requirements
TheMajesticreplacesystemrequirementsconsistofthe
following:
• Fireplace
- Firebrick(includedwithreplace)
- Door(includedwithreplace)
- Non-combustible facing material (included with
replace)
- HearthExtension
- MetalHearthStrips(includedwithreplace)
• OutsideAir System (hood and collars included with
replace)
• Fascia
• Chimney System
- CAK4A Chimney air kit (included with fireplace,
requiredwithSL300serieschimney)
- AtticInsulationShield(includedwithreplace)
- Chimney termination cap
• Non-combustiblenishmaterial
• Fans(includedwithreplace)
Optionalcomponentsinclude:
• LINTELBAR-HHT-LintelBarKit
• Heat-Zone-WD-CKit
• OA-RD-6-OutsideAirO󰀨setAdapter
• Mesh-HHT-C-Firescreen
F. Lower Access Panel Removal and Instal-
lation
Theloweraccesspanelcomesattachedtothereplace
for shipping purposes only.
1. While holding on to the access panel, remove the screws
oneachend.SeeFigure2.4.
2. Removethetwo(2)shippingbracketsanddiscardthem.
SeeFigure2.5.
3. Hangtheloweraccesspanelonthereplacesothatit
rests on the screw pins on each end.
Screw
Figure 2.4 Remove Screws
Shipping Brackets
Figure 2.5 Remove Shipping Brackets
9
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
3 3
Framing and Clearances
A. Appliance Dimensions/Weight
Figure 3.1 Appliance Dimensions
12-3/4
[324]
23-1/2
[597]
1/2 [13]
5-11/16
[144]
31-1/8
[791]
40-1/2
[1029]
16
[406]
56-1/2
[1435]
12
[305]
16-3/4
[425]
29 [737]
37 [940]
40 [1016] 1
[25]
1
[25]
42 [1067]
9-3/4
[248]
7-3/8
[187]
1 [25]
Model Pounds
WARMMAJIC-D 605
Appliance Weight Table
10
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
B. Clearances
WARNING! Risk of Fire!
You must comply with allminimum air space clearances
tocombustiblesasspeciedinFigure3.2.DO NOTpack
required air spaces with insulation or other materials.
Framing or nishing material used on the front of, or in
frontofthereplacecloserthantheminimumslistedmust
beconstructedentirelyofnon-combustiblematerials(i.e.,
steel studs,concrete board, etc.). Failure tocomplymay
causere.
Figure 3.2 Clearances to Combustible Materials
(ceiling)
(roof)
(ceiling)
2 in. (51 mm) min.
Attic
Insulation
Shield
Ceiling Firestop
(attic)
Storm Collar
Roof Flashing
2 in. min.
(51 mm)
2 in. (51 mm) min.
2 in. (51 mm) min.
Ceiling Firestop
Offset/Return with
hanger straps
2 in.
(51 mm)
min.
2 in. (51 mm) min.
Must have 2 in. (51 mm)
minimum clearance
to header
Electrical wires must be a minimum of
16 in. (406 mm) from top
1 in. (25 mm) to side of appliance
1/2 in. (13 mm) to back
of appliance
0 in.
to floor
36 in. (914 mm)
Top of appliance to
ceiling
Chimney Air Kit required with SL chimney
DuraPlus base plate required with Duraplus chimney
WITHIN ENCLOSURE AREA
Fireplacetobackwall 1/2in.(13mm)
Fireplace to sidewall 1in.(25mm)
Ductbootstoframing 0in.(0mm)
Topofreplacetoheader 16in.(406mm)
Door opening to sidewall 22-3/4in.(578mm)
EXPOSED SURFACES
Faceplate to sidewall 16in.(406mm)
Heatzoneairgrillstoceiling 12in.(305mm)
MANTEL
Non-combustiblemantel
38in.(965mm)
fromthebaseofthe
replaceup
Combustiblemantel
60in.(1524mm)
fromthebaseofthe
replaceup
Maximum mantel depth 12in.(305mm)
11
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Ceiling
Firestop
Metal Chase Top
Round Termination Cap
False Ceiling
Insulation in the
outside walls
of the chase
Attic
Insulation
Shield
Chimney
Ceiling
Firestop
Tabs
False Ceiling
False Ceiling
Insulation
Insulation
Storm Collar
Figure 3.3 Chase Assembly
1 2 3
All outside walls should be insulated.
Figure 3.4 Chase Constructions
• Thechaseisconstructedusingframingmaterialsmuch
the same as the walls in your home. A variety of siding
materials may be used including brick, stone, veneer
brick,orstandardsidingmaterials.
• In constructing the chase, several factors must be
considered:
- Maintain a 2 in. (51 mm) air space around the
chimney.
- The chase top must be constructed of non-
combustiblematerial.
- Incoldclimates,arestopspacerandatticinsulation
shieldshouldbeinstalledinaninsulatedfalseceiling
at the 8 ft. (2438 mm) level above the replace
assembly.Thisreducesheatlossthroughthechase.
- In cold climates,thewalls of thechase should be
insulated to the level of the false ceiling as shown in
Figure3.4.Thiswillhelpreduceheatlossfromthe
homearoundthereplace.
ThreeexamplesofchaseapplicationsareshowninFig-
ure3.4.
C. Construct the Chase
Achaseisaverticalboxlikestructurebuilttoenclosethe
replace and/or its vent system. Vertical chimneys that
runontheoutsideofabuildingmustbeinstalledinsidea
chase.SeeFigure3.4.
Constructionofthechasemayvarywiththetypeofbuild-
ing.LocalbuildingcodesMUSTbefollowed.
Hearth&HomeTechnologiesrecommends:
- The inside surfaces be drywalled and taped (or
theuseofanequivalentmethod)formaximumair
tightness to the false ceiling.
- In cold climates, the walls ofthechase should be
insulated to the level of the false ceiling as shown in
Figure3.3.Thiswillhelpreduceheatlossfromthe
homearoundthereplace.
- Holes and other openings should be caulked with
hightemperaturecaulkorstu󰀨edwithunfacedber
glass insulation.
• Requirementsforconstructingthechase:
- Arestopspacerandatticinsulationshieldshould
beinstalledatthefalseceiling.
- Thechasemustbeproperlyblockedtopreventblown
insulationorothercombustiblesfromenteringand
makingcontactwithreplaceorchimney.
- The chase top must be constructed of non-
combustiblematerial.
WARNING! Risk of Fire! DO NOT sealareabetweenre
stopopeningand chimney pipe exceptwhere they enter
theatticorleavethewarmairenvelopeofthehome(use
600°Fsealant).
WARNING! Risk of Fire! Youmustmaintainaminimum2
in.(51mm)airspaceclearancetoinsulationandframing
surroundingthechimneysystem.
D. Frame the Fireplace
WARNING! Risk of Fire! Youmustcomplywithallmini-
mumairspaceclearancestocombustibles.DO NOTpack
requiredairspaceswithinsulationorothermaterials.
WARNING! Risk of Fire! Complywithallminimumclear-
ancesspecied.
• A minimum 1/2 in. (13 mm) air clearance must be
maintainedatthebackand1in.(25mm)tothesides
ofthereplaceassembly.
• Chimneysectionsatanylevelrequirea2in.(51mm)
minimumairspaceclearancebetweentheframingand
chimneysection.
1. Fireplace and chimney enclosed in an exterior chase.
2. Chimneyo󰀨setthroughexteriorwallandenclosedinchase.
SeeSection9.Cforadditionalo󰀨setdiagrams.
3. Chase constructed on roof.
12
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
NOTICE: Hearth extension design must be determined
beforeinstallationofreplace.
Ifthereplaceisplacedontheoor,themaximumheight
ofanishedraisedhearth(constructedofnon-combustible
material)is5-3/4in.(147mm).Ifahigherraisedhearthis
preferred,thereplacemustbeplacedonaplatform.
NOTICE: Wiring for fans must be done before framed
enclosure is completed. If using the Heat-Zone-WD-C
Kit, it also must be installed before enclosure is com-
plete.
CAUTION! RiskofCuts/Abrasions.Wearprotectivegloves
andsafetyglassesduringinstallation.Sheetmetaledges
aresharp.
E. Secure and Level the Fireplace
This replace may be placed on either a combustible or
noncombustiblecontinuousatsurface.Followtheinstruc-
tionsforframinginSection3.Slidethereplaceintoposi-
tion. Be sure to provide the minimum 1 in. air clearance at
thesidesand1/2in.atthebackofthereplace.
Thereplaceshouldbepositionedsothefaceofthenon-
combustiblematerialonthereplacewillbeushwiththe
faceofthedrywallonthewalls.SeeFigure3.6.
Levelthereplaceandshimasnecessary.Securethere-
place(usingthepalletmountingbracketslocatedoneither
sideofthereplace)tothesuboor.
Stando󰀨s are attached to the replace.
NOTE:Beforeframingupthechase,considerwhereand
howthe chimneywill run. Ifthere areobstacles that
mightbeintheway,itmaybenecessarytomakethe
chaselargerthanshowntoallowforo󰀨setstobeused.
Refertoo󰀨setchartonpage24.
The unit can be positioned with the stando󰀨s touching
combustiblewallsorframingbutDONOTpackinsulation
orother materialsin theair spacebetweenthereplace
and wall.
Figure3.5showsatypicalframing(using2x4lumber)of
thereplace,assumingcombustiblematerialsareused.All
requiredclearances tocombustiblesaroundthereplace
mustbeadheredto.SeeFigure3.2.(Norecessabovere-
place.)
Position combustible
mantel 60 in. (1524 mm) from
base of fireplace. See page 36 for exceptions.
12 in.
(305 mm)
56¾ in.
(1441 mm)
24 in.*
(610 mm)
48½ in.
(1232 mm)
42½ in.
(1080 mm)
The finished cavity depth must be
no less than 24 in. (610 mm) from
the finished backwall to the
outside of front wall framing.
2 x 4s must be used for the
header and framing above
the header to maintain pipe
clearances.
Double studs to catch
non-combustible board
and wall facing material.
*If interior of chase will
be drywalled, add the
thickness to this
measurement.
Allow 12 inches minimum
cavity width for the
required outside air.
Duct may be installed on
either side.
14 1/2 in. (368 mm) for
SL300 Chimney
16 in. (406 mm) for
DuraPlus Chimney
Non-combustible mantle
may be positioned as low
as 1 in. above the Fascia
(Fronts) and 12 in. deep
or from the base of the
fireplace 38 in. up.
12 in.
(305 mm)
Figure 3.5 Framing the Fireplace
The
nished cavity depth must be no less than 24 in.
(610mm)fromthenishedbackwalltotheoutsideoffront
wall framing. Framing must extend straight up all the way
to the ceiling.
NOTE:Beforeframingupthechase,considerwhereand
howthechimneywillrun.Ifthereareobstaclesthatmight
be in the way, it may be necessary to make the chase
largerthanshowntoallowforo󰀨setstobeused.Referto
o󰀨setchartonpage24ifneeded.
13
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
WARNING! Risk of Fire! Preventcontactwithsagging,
looseinsulation.
• DO NOT install against vapor barriers or exposed
insulation.
• Secureinsulationandvaporbarriers.
• Provideminimumairspaceclearancesatthesidesand
backofthereplaceassemblyasoutlinedinSection3.
These surfaces
must be even!
Drywall Non-combustible
facing material
Figure 3.6 Drywall - Non-combustible Facing Material
Raised Platform
Floor
2 in.
(51 mm)
1 in. (25 mm) min.
overlap
2 in.
(51 mm)
Top piece must overlap
bottom piece
Figure 3.10 Protect the Front of an Elevated Platform
G. Protective Metal Hearth Strips
Figure 3.9 Position the Protective Metal Hearth Strips
F. Installation of Top Stando󰀨s
Removethetopfrontstando󰀨sfromthetopofthereplace.
See Figure 3.7. Screw the stando󰀨s to the replace as
showninFigure3.8.Thetopofthestando󰀨swillbescrewed
to the header.
Remove (2)
screws
Figure 3.7 Remove Stando󰀨s
Figure 3.8 Screw Stando󰀨s to Fireplace
Screwed to
header
Stando󰀨
screwed to
top
• Locate the two protective metal hearth strips
measuringapproximately26in.x4in.(660mmx
102mm)includedwiththisreplace.
• Slideeachmetalstrip2in.(51mm)underfrontedge
ofreplace.
• Overlapstripsinthemiddleofreplaceopeningby
1 in. (25mm)minimum.
• Metalstripsmustextendbeyondthefrontandsides
ofthereplaceopeningbyatleast2in.(51mm).
SeeFigure3.9.
• Protectthe frontofa platformelevated abovethe
hearthextensionwithmetalstrips(notincludedwith
replace)perFigure3.10.See Section 7 for hearth
extension instructions.
WARNING! Risk of re! Hightemperatures,sparks,
embersorotherburningmaterialfallingfromthe
replacemayigniteooringorconcealedcombustible
surfaces.
• ProtectivemetalhearthstripsMUSTbeinstalledover
combustiblesurfaces.
• Hearth extensions MUST be installed exactly as
specied.
• DO NOT cover metal strips with combustible
materials.Sparksorembersmayigniteooring.
1in. (25 mm) Overlap
Metal strips 2 in. (51 mm) under edge of Fireplace and
Hearth Extension and extended 2 in. (51 mm) beyond
both sides of fireplace opening.
Nail or screw metal strips in place.
Pallet Mounting/Floor
Brackets
14
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
WARNING! Risk of Fire!
Followtheseinstructionsexactly.
Facingmaterialsmustbeinstalledproperlytoprevent
re.
Nomaterialsmaybesubstitutedwithoutauthorizationby
Hearth&HomeTechnologies.
H. Non-Combustible Facing Board
(Provided)
TOOLS NEEDED: Powered drill with #2 Phillips head bit;
caulking gun.
Onlynon-combustiblematerials(suppliedwithreplace)
maybeusedtocoverthemetalreplacefront.
NOTE: Allboardsarepre-drilledforyourconvenience.
Boards MUST be attached in the following order:
bottom,sides,andthenthetop,red-paintedsideout.
The topandbottom board should each have a hang
tagattached.Leavethemattachedforreferralforthe
nishingoperation.
• Attach the bottom board to the bottom of the outer
replaceoutershellwithenclosedscrews,ensuringthe
boardiscentered.DO NOT remove hang tags. Attach
thesidepiecestotheoutercanandframingmembers.
See Figure 3.11.
• Centerandattachthetopboardtotheoutershelland
framingmembers. DO NOT remove hang tags.
NOTICE: 1/8in.ofthefacingmaterialmaybevisible
afternishingmaterialsareapplied.This1/8in.must
bepaintedortheredwillshow.
Figure 3.11 Apply Non-combustible Materials
Top Board
Side Boards
Bottom Board
CAUTION! Risk of Fire or Asphyxiation! DO NOT draw
outsidecombustionairfromwall,oororceilingcavity,or
enclosedspacessuchasanatticorgarage.
• DO NOTplaceoutsideairinlethoodclosetoexhaust
ventsorchimneys.Fumesorodorcouldbedrawninto
theroomthroughthereplace.
• Locateoutsideairinlethoodtopreventblockagefrom
leaves,snow/ice,orotherdebris.Blockagescouldcause
combustionairstarvation.
I. Outside Air Kit
Anoutsideairkitmustbeusedforcombustion.Hearth&
HomeTechnologiesrecommendsyouutilizethe shortest
ductrunandinstallaP-trap(seeFigure3.18)tooptimize
the performance of the outside air kit with a maximum
lengthof40ft.Theoutsideairinlethoodshouldbeposi-
tioned in a manner that will not allow snow, leaves, etc. to
blocktheinlet.Insomeinstallationstheairductmayneed
toberunvertically.Insuchaninstallation,a3ft(914mm)
heightdi󰀨erence mustbemaintained fromthe topofthe
uppermost chimney section to the outside air inlet hood.
RefertoFigures3.19and3.20whenplacingtheoutside
air inlet hood.
NOTE: The minimum cross-sectional area of the inlet
hoodis17.5squareinches.
Theoutsideairkitcomesinstalledontherighthandside
ofthereplacebutmaybemovedtotheothersidebyfol-
lowingthesesteps:
1. Removeoutsideaircollar(Figure3.12)andtheoutside
aircoverplate(Figure3.13).
2. Install the cover plate on the right side and the collar
on the left side.
3. Open and remove the lower access panel.
4. Removethetwo(2)outerscrews(Figure3.16)toallow
theoutsideairboxtoberemoved.
5. Pulltheoutsideairboxstraightout.SeeFigure3.17.
6. Ontheleftside,removethecoverplatetwo(2)screws.
SeeFigure3.14.
7. Install the cover plate on the right side where the
outsideair boxwas andinstalltheoutsideairboxin
through the hole on the left side where the cover plate
was.
• Cut a 6-1/2 in. (165 mm) hole in outside wall to
accommodate air piping.
• Use6in.(152mm)UL181Class1orClass0rigidor
exibleducting(notsupplied)todirectlyconnectoutside
airtoreplaceintake.Insulatethepipetopreventfrost
condensation.SeeFigure3.18.
• Insulating thepipeisn’t required but will helpprevent
frost condensation.
• Use the supplied outside air inlet hood.
• Seal between the wall and the pipe with silicone to
prevent moisture penetration and air leaks.
• Sealbetweentheoutsideairinlethoodandthehouse
withsiliconetopreventairinltration.
15
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
►
background
Typical Outside Air
Installation
Typical CAK Installation
Seal
Seal
24” (610 mm) min.
48” (1220 mm) max.
Note: The pipe
cannot lay on top
of the unit.
4” Duct-Use UL181
Class 0 or Class 1
ducting
Recommend
around 24 inches
for a minimum bend
Figure 3.18 Outside Air Installation with Cold Air Trap
Remove the (2) outer screws if moving
the outside air to the left side
Figure 3.16 Outside air handle shown on right side
Figure 3.17 Outside Air Box
Figure 3.12 Right Side
Figure 3.13 Left Side
Figure 3.14 Remove Cover Plate (Left Side)
Outside Air
Outside Air
Cover Plate
Outer Cover
Plate for
Junction Box
Pull the outside air box straight out.
Remove the cover plate on the left side and
move it to the right side, then install the
outside air box on the left side.
7-3/8”
(187mm)
Adapter
Figure 3.15 Outside Air O󰀨set Adapter
NOTE:AnOutsideAirO󰀨setAdapter(OA-RD-6)isavail-
ableifneeded.SeeFigure3.15.
CAUTION! Risk of Cuts/Abrasions. Wear protective
glovesandsafetyglassesduringinstallation.Sheetmetal
edgesaresharp.
16
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Figure 3.19 Outside Air Inlet Locations
3 ft. (91cm) min. from
top of uppermost
chimney section to
outside air inlet.
Attic insulation shield
must be used to keep
insulation away from
chimney.
Ceiling firestop
on floor of attic
Locate outside air inlet
to prevent blockage
from leaves, snow/ice,
or other debris.
Figure 3.20 Outside Air Installation
Outlet blocked by
snow, leaves, etc.
NO
Garage or
combustible
liquids storage
NO
Attic space
NO
Outlet placed
higher than 3 ft
below the
termination cap
NO
Clear area
outside
house or in
ventilated
crawl space
YES
• Use UL181 Class 1 or Class 0 rigid or flexible ducting.
• Install with short run and add a P-trap which will help
prevent flow of cold air.
• Secure flex duct with screws or wire ties.
17
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
DUCT RUN REQUIREMENTS
MAXIMUMDuctRun=40-ft.(12m)
MINIMUMDuctRun=36in.(914mm)
DUCTING MATERIAL
6in.(152mm)B-ventOnly
DONOTductintoexistingfurnaceplenum
MINIMUM CLEARANCE TO COMBUSTIBLES
1in.(25mm)fromtheB-vent
0
in.(0mm)fromtop&bottomofoutletbox
0in.(0mm)fromthesidesofoutletbox
12in.(305mm)fromwallregistertoceiling
RefertoFigure3.24.
CAUTION! ALLwiringshouldbedonebyaqualiedelec-
trician and shall be in compliance with local codes and
withtheNationalElectricCodeNFPA/NECNo.70-current.
CSC22.1CanadianElectricCode.
Possible Air Duct Runs / Locations
Figure 3.24 Minimum Clearances to Combustibles
J. Heat-Zone-WD-C Kit (Optional)
TheHeat-Zone accessory kitconveys warmair from the
replace through air duct(s) to remote locations in the
sameroomorotherroomsofthebuilding.Youmayinstall
1or2Heat-Zonekitsonthereplace.Installationofthis
kit MUSTbeperformedbyaqualiedservicetechnician.
If any parts are missing or damaged, contact your local
dealerbeforestartinginstallation.DONOTinstalladam-
aged kit.
This kit is tested and safe when installed in accordance
withthisinstallationmanual.Itisyourresponsibilitytoread
all instructions before starting installation and to follow
these instructions carefully during installations.
TheHeat-Zone-WD-Ckitiscarefullyengineeredandmust
be installed only as specied. If you modify it or any of
its components you will void the warranty and you may
possiblycausearehazard.Installationmustbedoneac-
cordingtoapplicablelocal,state,provincialand/ornational
codes.
Planthelocationofthereplaceandwarmairductrun(s).
Ceiling Register
Wall Register
Floor Register
Two Duct Kits
Ceiling Register
12 in. (305mm) minimum clearance
from register to ceiling
17 in. (432mm) minimum
clearance to allow for
venting and heat zone box
18
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Fan Housing
Install Grill with
Louvers pointed
down
Mounting Bracket
can rotate 180°
45° Elbow
Secure B-Vent to Fan
Housing with sheet
metal screws
Secure B-Vent to
Adapter with sheet
metal screws
Adapter
Mounting Plate
Starter Pipe
Cover Plate
Installation
• Remove the knockout or cover plate from the top of the
replaceanddiscardit.SeeFigure3.25.
• Cut a 3 in. (76 mm) hole inthe insulation board and
removeitasperthedimensionsshowninFigure3.25.
4 in.
(102 mm)
3¾ in. (95 mm)
C
L
• Determine the necessary length of starter pipe from
Table3.1andcutasrequired.
Figure 3.25
NOTE: It is important the pipe length be adhered to
or it will a󰀨ect the performance of your replace.
• Onthemountingplate,handbendthetabsdownward.
Slidethetabsovertheoutsideofthestarterpipe.Secure
with four sheet metal screws included in fasteners
package.Figure3.26.
Table 3.1
Cut out and
remove the
insulation
Run Length Cut Pipe Length
20 - 40 ft (6-12 m) 16 in. (406 mm)
(1fullpieceofpipe)
10 - 20 ft (3 - 6 m) 24 in. (607 mm)
3 - 10 ft (1 - 3 m) 30-1/2 in. (775 mm)
(2fullpiecesofpipe)
• Slide the starter pipe into the replace, matching the
holesintheplatetotheholesonthereplace.
• Place the adapter on the mounting plate lining up holes.
Using four sheet metal screws included in the kit, secure
theadapterandmountingplateonthereplace.After
securingtothereplace,tapedowntheadapteredges
tothetopofthereplacewithaluminumtapetoprevent
leakage.
• Determine the location for the air register and fan
housingassembly.Cuta6-3/4in.x13-1/8in.(177mm
x333mm)holebetweenframingmembers(wallstudsor
oorjoists).Attachthebracketstothefanhousingwith
thescrewsprovided.Thebracketscanberotated180°
andmountedtothebacksideofthe2x4ifnecessary.
See Figure 3.27.
NOTICE: Thefanandelectricalconnectionsmustbe
accessibleforservicingperlocalcoderequirements.
• Attachenough6in.(152mm)B-Ventasrequiredforyour
installation to the fan housing. A maximum of (4) 90°
elbows are allowed. Screw the B-vent to the adapter.
AlsoscrewtheB-venttotheoutletboxonthefan
housing.SeeFigure3.28.
Support duct at intervals
ofnogreaterthan4ft(1m)asrequiredbylocalcode.
Figure 3.26
WARNING! Risk of Fire! Comply with all minimum
clearancesspecied.
• Aminimum1/2in.(13mm)airclearancemustbe
maintainedatthebackand1in.(25mm)tothesides
ofthereplaceassembly.
Pipe must be cut
to correct length.
See Table 3.1
19
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
NOTICE: Securetheductsothatclearancetothereplaceouterwrapismaintained.Tapeallseamswithaluminumtape
1-1/4in.(32mm)minimumwidthorasspeciedbylocalcodes.)
Figure 3.27
Figure 3.28
Bracket position for when drywall has been installed
Bracket position for when drywall has not been installed
Fan housing
Framing
14½ in. (368 mm)
13-1/8 in. (333 mm)
6¾ in.
(171mm)
Cut-out in wall, floor
or ceiling
Bracket mounting
holes
Fan Housing
Install Grill with
Louvers pointed
down
Mounting Bracket
can rotate 180°
45° Elbow
Secure B-Vent to Fan
Housing with sheet
metal screws
Secure B-Vent to
Adapter with sheet
metal screws
Adapter
Mounting Plate
Starter Pipe
Cover Plate
20
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
• Installthevariablespeedwallrheostat(withsettingon
“OFF”)inaconvenientlocation.Thisswitchwillcontrol
theHeat-Zone-WD-Cfanoperation.
• Remove the junction box. Wire 110 VAC service TO
the wall rheostat and FROM the wall rheostat to the
fanjunctionbox.Usewirenutstosecurethe110VAC
servicewirestothehot(black)andneutral(white)fan
wires and screw the 110 VAC ground wire to the junction
box.SeeFigure3.33.
• Secure the return air grille to the fan housing making
sure it is ush.The grille must be installed with the
louvers pointing down.
NOTICE: DONOTUSEADJUSTABLEREGISTERS.
Figure 3.33
White
Black
Junction Box Removed
White
White
Black
Black
Incoming Power
(110V)
14-2 w/ground
Installing Fan In Housing
• Insert fan into the fan housing starting with motor end
rst.Slipitbelowthe“L”mountingbracketontheleft
sideallowingtherightsidetodropin.SeeFigure3.29.
• Tiltthefanforwardtoclearthemountingbracketsthen
liftthefanontothebrackets.SeeFigure3.30.
“L” Bracket
Figure 3.29
Mounting Brackets
Figure 3.30
• Securethefantothemountingbracketswith(4)screws
provided. See Figure 3.31.
• Insert the fan wires through the grommet and into the
junctionbox.SeeFigure3.32.
Screws
Figure 3.31
Fan Wires
Grommet
Figure 3.32
21
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
4 4
Electrical Wiring
NOTICE: The manual override switch, rheostat speed
controlandcoverplatearesupplied.Youwillneedtosupply:
14-3wirewithground;14-2wirewithground;standardwall
mountjunctionbox;wirenuts.
• Removejunctionboxcoverplateonthebottomrightside
ofthereplacetoaccesstheoutletwires.SeeFigure
4.1.
WARNING! Risk of Fire! DO NOT applycombustiblen-
ishingmaterialsoveranypartofthefrontofthisreplace.
• The metal replace face may only be covered with
noncombustible materialssuchas ceramic tile, brick,
orstone.
• Donotcoverorblockanycoolingairslots.
NOTE:Thepowermayenterfromeithersidebyswitching
the cover plates on the outer shell and switching the
coverplatesinthebottomaccessareatotheopposite
sides.SeeFigure4.2.
14-2 w/ground
Standard wall mount with
Junction Box
14-3 w/ground
WIRE NUT
WHITE
GREEN
BLACK
BLACK
RED
WHITE
Match colors to wire
harness (red to red,
white to white, etc) and
secure with a wire nut
Incoming Power
(110V)
Power to the Fireplace
Snap Disc
bypass switch
Figure 4.3 Fan Wiring Diagram
Junction Box
Cover Plate
Figure 4.1 Junction Box Cover Plate
Switch
cover plate
to other
side.
• Threadthe14-3withgroundwirethroughtheopening
with the strain relief on the cover plate.
• Matchcolorstowireharness,(redtored,whitetowhite,
etc.)andsecurewithwirenuts.
NOTICE: Wiring for fans must be done before framed
enclosureiscompleted.IfusingaHeat-Zone-WD-Ckit,it
alsomustbeinstalledbeforeenclosureiscomplete.
Figure 4.2 Bottom Access Area
22
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
NOTICE: Amaximumoftwopairsofosetsandreturns
maybeused.
Minimumoverallstraightheight 13ft 3.96m
Minimumheightwithsingleoset/
return
14.5ft 4.42m
Doubleoset/returnminimumheight 20 ft 6.1m
Maximumheight 90ft 25.60m
Maximumchimneylengthbetweenan
osetandreturn
20 ft 6.1m
Maximumdistancebetweenchimney
stabilizers
35ft 10.67m
Maximumunsupportedchimney
lengthbetweentheosetandreturn
6 ft 1.83m
Maximumunsupportedchimney
heightabovethereplace
35ft 10.67m
Maximumunsupportedchimney
aboveroof
6 ft 1.83m
WARNING! Risk of Fire! Youmustmaintain2in.(51mm)
air space clearance to insulation and other combustible
materials around the chimney system. Failure to do so
maycauseoverheatingandre.
NOTICE:You must provide support for the pipe during
constructionandchecktobesureinadvertentloadinghas
notdislodgedthechimneysectionfromthereplaceorat
anychimneyjoint.
A. Chimney Requirements
Verticaldistancesaremeasuredfromthebaseofthe
replaceasshowninFigure5.1.
5 5
Chimney and Termination Requirements
Table 5.2 Chimney Component Dimensions
Table 5.1 Chimney Requirements
HEIGHT OF CHIMNEY COMPONENTS in. mm
Chimney Stabilizer
SL3 4-3/4 121
O󰀨sets/Returns
SL315 13-3/8 340
SL330 15-1/2 394
Chimney Sections*
SL306 4-3/4 121
SL312 10-3/4 273
SL318 16-3/4 425
SL324 22-3/4 578
SL336 34-3/4 883
SL348 46-3/4 1187
* Dimensions reect e󰀨ective height.
Note: 8in.DuraPluscanalsobeused.Seepage45.
6 ft (1.8 m) max.
unsupported
run
20 ft (6.10 m) max.
pipe between an
offset & return
Ceiling firestop
35 ft (10.7 m)
max. straight
unsupported
chimney height
6 ft (1.83 m) max.
unsupported chimney
above roof
40 1/2 in.
(1029 mm)
to top of
fireplace
Attic Insulation Shield
Chimney Air Kit
required with SL
chimney
13 ft (3.96 m) height straight up
14.5 ft (4.42 m) min. height/single offset-return
20 ft (6.10 m) min. height/double offset-return
90 ft (27.43 m) max. height
Figure 5.1 Chimney Requirements
23
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Table 5.3 O󰀨set Dimensions
B. O󰀨sets/Returns
A30°Elbow(measuredfromthevertical)isthelargestthatcanbeusedinano󰀨set.A30°Elbowmaynotbecombined
withanotherElbowtomakeasteepero󰀨set(e.g.two30°Elbowsarenotallowedtobeputtogethertoforma60°elbow.).
AvoidElbowsifpossible.Atotallyverticalchimneyismoree󰀩cient.WhenElbowsarenecessarytoavoidobstructions
suchasrafters,ridgepoles,orjoists,youareonlyallowedtouse2pairofElbowsinanyonechimneysystem.Horizontal
runsofchimneyviolatebuildingcodeandarenotallowed.
• Ano󰀨setandreturncanbeusedasasingleentityorseparatedbychimneysection(s).
WARNING! Risk of Fire! DO NOT useoset/returnsgreaterthan30°fromvertical.Chimneydraftwillberestrictedand
couldcauseoverheatingandre.
• Measuretheshiftneededtoavoidtheoverheadobstruction.RefertodimensionAinFigure5.2.
• FindtheappropriateAdimensionlistedinTable5.3.TheBdimensioncoincidingwiththeAdimensionmeasurementin
Table5.3representstherequiredverticalclearanceneededtocompletetheo󰀨set/return.
• Readacrossthecharttondthenumberofchimneysections/modelnumbersneededbetweentheo󰀨setandreturn.
A
B
1-1/4 in. (32 mm)
OVERLAP
Figure 5.2 Chimney O󰀨set/Return
Example:
Your“A”dimensionfromFigure5.2is14-1/2in.(368
mm).UsingTable5.3thedimensionclosestto,butnot
lessthan14-1/2in.(368mm)is14-1/2in.(368mm)us-
inga30°o󰀨set/return.
Youdeterminefromthetablethatyouneed34-1/8in.
(867mm)(Dimension“B”)betweentheo󰀨setandreturn.
Thechimneycomponentthatbesttsyourapplicationis
oneSL324.
15-degree 30-degree
SL306 SL312 SL318 SL324 SL336 SL348
A B A B
in. mm in. mm in. mm in. mm
15/8 41 133/8 340 35/8 92 151/2 394 - - - - - -
27/8 73 173/4 451 51/2 140 185/8 473 1 - - - - -
41/8 102 223/8 568 71/4 184 213/4 552 2 - - - - -
41/2 114 235/8 600 81/2 216 233/4 603 - 1 - - - -
53/4 146 281/4 718 101/4 260 27 686 1 1 - - - -
6 152 293/8 746 11 1/2 292 29 737 - - 1 - - -
71/4 184 34 864 131/4 337 321/8 816 - 2 - - - -
73/4 197 361/8 918 141/2 368 341/8 867 - - - 1 - -
83/4 222 393/4 1010 161/4 413 373/8 949 1 - - 1 - -
103/8 264 455/8 1159 191/4 489 421/2 1080 - - 2 - - -
105/8 270 463/4 1187 20 1/2 521 445/8 1133 - - - - 1 -
117/8 302 513/8 1305 221/4 565 473/4 1213 1 - - - 1 -
13 1/2 243 571/4 1454 251/4 641 527/8 1343 - - - 2 - -
133/4 349 583/8 1483 261/2 673 55 1397 - - - - - 1
15 381 63 1600 281/4 718 581/8 1476 1 - - - - 1
161/2 419 683/4 1746 311/4 794 631/4 1607 - 1 - - - 1
18 457 745/8 1895 341/4 870 681/2 1740 - - 1 - - 1
195/8 498 803/8 2042 371/4 946 733/4 1873 - - - 1 - 1
205/8 524 841/8 2137 391/8 994 767/8 1953 1 - - 1 - 1
223/4 578 917/8 2334 431/4 1099 841/8 2137 - - - - 1 1
24 610 961/2 2451 451/8 1146 871/4 2216 1 - - - 1 1
257/8 657 103 1/2 2629 491/4 1251 941/2 2400 - - - - - 2
Properassemblyofair-cooledchimneypartsresultinanoverlapatchimneyjointsof1-1/4in.(32mm).E󰀨ective
lengthisbuiltintothischart.
24
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Slanted Roofs
Flat Roofs
Chimney must
extend 3 ft (.9 m)
above the roof
Chimney must extend 2 ft (.6 m)
above any portion of the roof or
adjacent structures within
10 ft (3 m) of the chimney
Chimney must
extend 3 ft (.9 m)
above the roof
Chimney must extend 2 ft (.6 m)
above any portion of the roof or
adjacent structures within
10 ft (3 m) of the chimney
Multiple Chimney Locations
A B
18 in. minimum
457 mm
20 in. and over 0 in. minimum
Gas, Wood or Fuel Oil
Termination Cap
Wood
Minimum
(See
illustration
above)
B
Gas
Termination
Cap **
A *
Perpendicular Wall
*
If using decorative cap cover(s), this distance may need to be
increased. Refer to the installation instructions supplied with the
decorative cap cover.
**
In a staggered installation with both gas and wood terminations, the
wood termination cap must be higher than the gas termination cap.
Figure 5.3 Multiple Chimney Locations
C. Termination Requirements
• Installacapapprovedandlistedforthisreplacesystem.
• Locatecapwhereitwillnotbecomepluggedbysnoworothermaterials.
• Locate cap away from trees or other structures.
• Thebottomoftheterminationcapmustbeatleast3ft(.91m)abovetheroofANDatleast2ft(.61m)aboveanyportion
ofroofwithin10ft(3.05m)asshowninFigure5.3.
• ThedistancerequiredbetweencapsisshowninFigure5.3.
25
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
6 6
Chimney Installation
Figure 6.1 Typical Chimney System - Guidelines for Chimney System Installation
NOTICE: Chimneyperformancemayvary.
• Trees,buildings,rooflinesandwindconditionsaectperformance.
• Chimneyheightmayneedadjustmentifsmokingoroverdraftoccurs.
A. Typical Chimney System
TheSL300serieschimney(UL127approvedforusewiththisreplace)isshippedwithwraparound
warninglabelsinstalled.Theselabelsmayberemovedfromthesectionsofchimneyexposedabove
therooine.
Termination Cap
Additional
support for
tall chimneys
Storm Collar
Maintain minimum
clearances to
combustibles as
specified
Chimney must extend
beyond combustible
roof structure
Maintain minimum
height of chimney
above roof
Install roof flashing
according to minimum
requirements
Offsets/returns
may not exceed
30° from vertical
Support straps for offsets/
returns must be secured
to adequate framing
Ceiling firestops
are required where
chimney passes
through ceiling or
floor
Attic Shield is
required where chimney
passes through attic
The chimney must be
enclosed from the fireplace to
the attic maintaining the 2
inch clearances.
26
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
C. Install Chimney Air kit (CAK4A)
NOTICE: ChimneyAirKit,PartCAK4Aisrequiredwhen
using the SL-300 Pipe Series. Detailed instructions are
suppliedwiththekit.IfusingtheDura-PlusSystem(must
be 8in./203mm in diameter), the starter ring thatcame
withthereplacemustberemovedandreplacedwiththe
Dura-PlusBasePlate.TheCAK4Aisnotrequiredwitha
Dura-PlusSystem.
• Installthechimneypiperst.
• Handbend thetabsin positionbefore placingonthe
replace.
WARNING! Risk of Fire! DO NOT install substitute or
damagedchimneycomponents.
Figure 6.2 Assembling Chimney Sections
NOTICE: Chimneysectionscannotbedisassembledonce
lockedtogether.Planahead!
• Lockchimneysectionsand/oro󰀨sets/returnstogetherby
pushing downward until the top section meets the stop
beadonthelowersection.
• Pull on the top of each section as installed to make sure
it is fully engaged and will not separate.
• You may use #6 or #8 sheet metalscrewsno longer
than1/2in.(13mm)tofastenchimneyoutersections
together.DoNOTpenetrateinnerue.
• Verticalstraightrunsofchimneymustbesupportedevery
35ft(10.7m).
B. Assemble Chimney Sections
Useonlythosecomponentsdescribedinthismanual.
Attacheitherastraightchimneysectionorano󰀨settothe
topofthereplacestartingwiththeinneruefollowedby
the outer casing. Continue this order until termination cap
is reached (depending on your installation requirement).
Chimney sections arelockedtogether by pushing down-
warduntilthetopsectionmeetsthestopbeadonthelower
section.
Theinnerueisplacedtotheinsideoftheuesectionbe-
lowit.Theoutercasingisplacedoutsidetheoutercasing
ofthechimneysectionbelowit.SeeFigure6.2.
WARNING! Risk of Fire! DO NOT install substitute or
damagedchimneycomponents.
• Placetheboxontopofthereplacearoundthechimney
pipe,pushbothpiecestogetherandsecurewithscrews
provided.
• Usethepre-punchedholesinthetabsasguidesand
drillholesthroughthereplacetop.
• SecuretheCAK4Ainplace.SeeFigure6.3.
• Sealaroundthekitattheueandatthetopoftheouter
shellwithhightempcaulkwithaminimumratingof500
degrees.SeeFigure6.3.
NOTES:
• TheCAK4Aterminationcapmustbeaminimumof4ft
(1219mm)abovethegroundandkeptfreeofdebris.
• Ifthe CAK4A isinstalled ina chase,the CAK4A side
terminationcapmustbeatleast3ft(914mm)below
the chimney top.
• Sealaroundthecapandexwithcaulktostopairfrom
gettingintothechase.SeeFigure6.4.
• Thepipecannotlayontopoftheunit.
Attach
Flue First
CAK4A
Secure with Screws
Provided
Push Together
Secure to Top
Figure 6.3 Installing the CAK4A
27
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
P Traps
Whenusingthechimneyairkit(CAK)andtheoutsideair
kits, it is recommended that you install a P trap as shown
inFigure6.4bybendingtheexduct,orusing90°elbows
if using rigid duct to help prevent air circulation when the
replace is not in use. In colder climates, it is strongly
recommended to use an insulated duct.
Figure 6.4 P Trap Installation Using Flex Pipe
Typical Outside Air
Installation
Typical CAK Installation
Seal
Seal
24” (610 mm) min.
48” (1220 mm) max.
Note: The pipe
cannot lay on top
of the unit.
4” Duct-Use UL181
Class 0 or Class 1
ducting
Recommend
around 24 inches
for a minimum bend
D. Secure O󰀨set/Return
Wheno󰀨sets andreturnsare joinedto straightpipesec-
tions,theymustbelockedintopositionwithscrews(outer
only).Topreventgravityfrompullingthechimneysections
apart,thereturnsandthechimneystabilizershavehanger
straps for securing these parts to joists or rafters. See Fig-
ure6.5.
* Use#6or#8sheetmetalscrew,orlarger,nolonger
than1/2in.(13mm).
WARNING! Risk of Fire!
• Secureosetswithscrews(nottoexceed1/2in./13mm
Inlength).
• Securereturnswithstrapping.
• Straightchimneysectionsmaybesecuredwithscrew
(nottoexceed1/2in./13mmInlength)atthejoints.
• Keepchimneysectionsfromseparatingortwisting.
Ceiling
Firestop
Straps
Optional
Additional
Support
Joint
Band
(Optional)
Figure 6.5 Secure the Chimney
WARNING! Risk of Fire!
• Theexpipemustneverbecompressedordeformed!
• Restrictingtheairowinsidetheexpipemayincrease
uepipetemperaturescausingachasere.
28
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
ROOM ABOVE (non-insulated ceiling)
ATTIC ABOVE (insulated ceiling)
B
A
Ceiling firestop
attached to bottom
of framing
Ceiling firestop
attached to top of
framing
Note: Use same dimensional lumber for framing
ceiling firestop and joists.
2 in. (51mm)
clearance
2 in. (51mm)
clearance
WARNING! Risk of Fire! DO NOT seal area between
restopopeningandchimneypipeexceptwheretheyen-
tertheattic orleavethe warmairenvelope of thehome
(use600°Fsealant).
Figure 6.6 Installing the Ceiling Firestop
Catalog #
A B
in. mm in. mm
FS338 14-1/2 368 14-1/2 368
FS339 14-1/2 368 18-3/8 467
FS340 14-1/2 368 23 584
E. Install Firestops
WARNING! Risk of Fire! Firestops must be used
wheneverthechimneypenetratesaceiling/oor.
• Mark and cut an opening in ceiling/oor as shown in
Figure6.6.
• Frametheopeningwiththesamesizelumberusedin
the ceiling joists.
• Nailtherestoptothebottomoftheceiling/oorjoists.
• Provide a means to maintain the required air space
betweenthechimneyandinsulation orinstallan attic
insulation shield.
29
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
5 Tabs bent
in 90°
Tabs bent in to
rest against pipe
Attic Insulation Shield
Ceiling Firestop
10-1/2 in.
(267 mm)
14-1/2 in. (368 mm)
diameter
InsulationInsulation
Pipe
Pipe
2 in. (51 mm)
air space
Seal with tape
Installationofaceilingrestopisrequired:
Note:InCanadaaCAS8mustbeinstalled.Seeinstruc-
tions provided with kit.
• RefertoFigures6.6,6.7,6.8and6.9.
• Iftheatticshieldispre-rolledcontinue.Ifitisaatpart,
try and roll it up to aid in wrapping it around the chimney.
• Pre-bendallthetabsinatthetopto45°.
• Wraptheshield(aroundthechimneyifalreadyinstalled)
until you have an overlap and the three holes on each
sidematchup(largeholesontop).
• Insert three screws into the matching holes to form a
tubestartingatthebottom.
• Bendthetabsonthebottomofthetubeinwardto90°to
maintain chimney air space.
• Resttheinsulationshieldontheceilingrestopbelow.
• Tapeo󰀨anyopeningaroundthebottom.
Ifyouwishtomakeacustomshieldorbarrier,follow
theseguidelines:
• Metalispreferred,althoughanymaterialsti󰀨enoughto
holdbacktheinsulationcanbeused.
WARNING! Risk of Fire! Useofcardboardorother
materialsthatcandeectunderhumidityorotherenvi-
ronmentalconditionsisnotrecommended.
• The shield or barrier must be tall enough to extend
abovetheinsulationandpreventblown-ininsulationfrom
spilling into the cavity and accommodate the amount os
insulationasrequiredbytheNationalBuildingCode.
• Maintainspeciedairspacesaroundchimney.
• Check instructions and local codes for further details.
Insert three
screws
Pre-bend the tabs to
rest against pipe to
prevent insulation
from falling in.
(5)Tabs bent
in 90°
Figure 6.7 Prepare Attic Insulation Shield
F. Install Attic Insulation Shield
WARNING! Risk of Fire! YouMUSTinstallanatticinsu-
lationshield whenthere isany possibilityof insulationor
other combustible material coming into contact with the
chimney.
• DO NOTpackinsulationbetweenthechimneyandthe
atticinsulationshield.
• Failuretokeepinsulationandothermaterialsawayfrom
chimneypipecouldcausere.
• DO NOTosetchimneyinsideinsulationshield.
• Combustiblematerialmaycomeincontactwiththeattic
insulationshieldaslongastherequiredclearancesare
maintainedtothechimneypipe.
Double-check the Chimney Assembly
Continueassemblingthechimneysectionsupthrough
the ceiling restops as needed. While doing so, be
aware of the height and unsupported chimney length
limitationsgivenunderSection5.
Checkeachsectionbypullingupslightlyfromthetop
toensureproperengagementbeforeinstallingthesuc-
ceedingsections.Iftheyhavebeenconnectedcorrect-
ly, they will not disengage when tested.
Thechimneymustbeenclosedfromthereplacetothe
atticmaintainingthe2inchclearancestocombustibles.
Figure 6.8 Install Attic Insulation Shield (restop above ceiling)
5 Tabs bent
in 90°
Tabs bent in to
rest against pipe
Attic Insulation Shield
Ceiling Firestop
10-1/2 in.
(267 mm)
14-1/2 in. (368 mm)
diameter
InsulationInsulation
Pipe
Pipe
2 in. (51 mm)
air space
Seal with tape
Figure 6.9 Install Attic Insulation Shield (restop below ceiling)
30
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
G. Roof Penetration
• RefertoFigure6.10.
• Plumbfromrooftocenterofchimney.
• Drive a nail up through roof to mark center of pipe.
• Measuretoeithersideofnailandmarkthe14-1/2in.x
14-1/2in.(368mmx368mm)openingrequired.
• Measure opening on the horizontal; actual length may
belargerdependingonroofpitch.
• Cut out and frame opening.
Figure 6.11 Ceiling/Attic Construction
Install Flashing
• Assemblechimneysoitpassesthroughtheframed
opening.
• Sliptheashingoverthechimney.
NOTICE: Roongshinglesmustbebelowtheashing
plate onthelower side of a sloped roofandover the
ashingplateonthesidesandtop.
• Nailtheashingtotheroof.Keepgapsbetweenthe
ashingplateandtherooftoaminimum.
• Caulktheashingplateandroofjunctionaswellas
theverticalseamontheashing.Allnailheadsmust
becaulkedwitharoongsealant.
• Caulk the overlap seam of any exposed pipe sections
thatarelocatedabovetherooflinetopreventleaks.
CHIMNEY
FLASHING
PLATE
JOISTS
NAIL
THIMBLE
FLASHING
Figure 6.12 Installing Part: 12966A, Conguration 1
NOTICE: REQUIREDformanufacturedhomes.
• Locatethepointwherethechimneywillexittheroofby
plumbingdowntothecenterofthechimney.Layout,
cutand framea 14-1/2in.(368mm)square opening
(measuredonthehorizontal)throughtheceilingandroof
structure. Consult local codes for framing details.
H. Manufactured Home Installation
SL-300 Series Ceiling/Roof Thimble
• Centertheashingoverthechimneyandnailittothe
roof.Keepgapsbetweentheashingplateandtheroof
toaminimum.Caulktheashingplateandroofjunction
aswellastheverticalseamontheashing.Allnailheads
mustbecaulkedwitharoongsealant.
• Finish assembling the chimney storm collar and
termination cap following the installation instructions
provided with them.
• Thethimble mustextend completelythrough theroof
structureshieldingcombustiblematerials.Fivelocation
holeshavebeenprovidedtoallowforavarietyofceiling/
roofthicknesses.Athimbleextensionisrequiredwhen
theceiling/roofthicknessexceeds12-1/2in.(318mm).
Theextensionshouldoverlapthethimbleoneinch.
• Toattachtheextensiontothethimble,drill1/8in.(3mm)
holesthroughtheoutershieldofthethimbleusingthe
predrilled holes in the extension as guides. Attach the
extensiontothethimbleusingthescrewsprovidedwith
the extension.
• Installthethimbleassemblyandnailitsecurelytothe
framingmembers.
Termination Cap
Additional
support for
tall chimneys
Storm Collar
Maintain minimum
clearances to
combustibles as
specified
Chimney must extend
beyond combustible
roof structure
Maintain minimum
height of chimney
above roof
Install roof flashing
according to minimum
requirements
Figure 6.10 Install Flashing
31
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
NAIL
FLASHING
PLATE
CHIMNEY
THIMBLE
EXTENSION
SCREW
FLASHING
THIMBLE
ADJUSTABLE
EXTENSION
HOLES
Figure 6.14 Installing Part 12966A Conguration 3
I. Install Chase/Chase Top
• YouMUSTuseachasetopinachaseinstallation.
ChasetopsareavailablefromyourMajesticdealer
ormaybeeldconstructed.
• Include a turndown and drip edge to prevent water
from seeping into the chase.
• Includea2 in.(51 mm) soldered,welded orspun
collar around pipe opening to keep water out.
• Providea1/8in.(3mm)gaparoundtheuepipe.
• Slope the chase top downward away from the
opening.
WARNING! Risk of Fire! DO NOT caulkthepipetothe
chasetopcollar.
• Caulk all seams to prevent leaks.
Slope Downward
(1/4 in. per foot
minimum)
Turn-down
Drip Edge
Chase
2 in. (51 mm) Collar
on Chase Top
.018 (26 ga) min.
Galvanized
Chase Top
Figure 6.15 Chase Top Construction
FLASHING
CHIMNEY
FLASHING
PLATE
NAIL
THIMBLE
SCREW
THIMBLE
EXTENSION
Figure 6.13 Installing Part 12966A, Conguration 2
32
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Storm
Collar
Chimney
Pipe
Chase Top
Termination
Cap
Chase
6 in. (153 mm)
Minimum top of
chase to top of
chimney pipe
Collar
2 in. (51 mm)
Minimum Height
Do NOT
block air holes
Caulk gaps between
storm collar & pipe,
and storm collar
& chase top.
Termination cap pipe and chimney section must be snapped
together to maintain an overlap of 1-1/2 in. (38 mm).
Slip
storm collar
around chimney pipe
before termination
cap pipe is snapped
into the chimney
pipe.
Figure 6.16 Installing a TR344 Round Termination Cap
J. Install Termination Cap
Install the chimney sections up through the chase enclo-
sure.
• Using300°siliconesealant,caulktheoverlapseamof
anyexposedpipesectionsthatarelocatedabovethe
roof line to prevent leaks.
• Refer to termination cap instructions.
WARNING! Risk of Fire! Theminimumoverlapofcap
topipe(asshowninthefollowingillustrations)MUST
bemetorchimneymayseparatefromcap.Separation
allowssparks,heatandemberstoescape.
NOTICE: Painttheterminationcapwitharust-resistant
painttoprotectagainsttheeectsofcorrosiononthose
partsexposedtotheweather.
Figure 6.17 Installing a TR342-B Round Telescoping Termination
Cap
Storm
Collar
Chimney
Pipe
Chase Top
Termination
Cap
Chase
4 3/4 in. (121 mm)
Maximum
Collar
2 in. (51 mm)
Minimum Height
Caulk gaps between
storm collar & pipe,
and storm collar
& chase top.
Do NOT
block air
holes
3 clip brackets.
Slip over chase collar
and attach with screws
provided.
Assemble
storm collar
around extended
termination cap
pipe
once cap is
installed.
The last section of pipe must
stop between 2 in. (51 mm)
above the top of the chase and
4 3/4 in. (121 mm) below the
top of the chase.
2 in. (51 mm)
maximum
33
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Figure 6.18 Installing an ST375 Square Termination Cap
Chimney
Pipe
Chase Top
Termination Cap
Chase
Collar
2 in. (51 mm)
Minimum Height
Place waterproof
caulk or sealer under
each flange of the
termination cap and
on top of each screw
to help prevent leaks.
Flange
2 in. (51 mm)
maximum
4 3/4 in. (121 mm)
maximum
The last section of pipe
must stop between 2 in. (51
mm) above the top of the
chase and 4 3/4 in. (121
mm) below the top of the
chase.
Chimney
Pipe
Chase Top
Termination Cap
Chase
Collar
2 in. (51 mm)
Minimum Height
Place waterproof sealer under
each flange of the termination
cap and on top of each screw
to help prevent leaks.
2 in. (51 mm)
maximum
4 3/4 in. (121 mm)
maximum
The last section of pipe must
stop between 2 in. (51 mm)
above the top of the chase and
4 3/4 in. (121 mm) below the
top of the chase.
Figure 6.19 Installing a TS345/TS345P Square Termination Cap
Figure 6.20 Installing a TCT375 Terra Cotta Cap
Chimney
Pipe
Chase Top
Termination Cap
Chase
Collar
2 in. (51 mm)
Minimum Height
Remove 2 screws
from front & back
to lift the top off
Place waterproof sealer
under each flange of the
termination cap and on
top of each screw to
help prevent leaks.
The last section of pipe
must stop between 2 in.
(51 mm) above top of
chase and 4-3/4 in. (121
mm) below top of chase
2 in. (51 mm) maximum
4-3/4 in. (121 mm) maximum
Storm Collar
Chimney
Pipe
Chase Top
Termination
Cap (not shown)
Chase
Collar
2 in. (51 mm)
Minimum Height
Caulk gaps between
storm collar & pipe,
and storm collar
& chase top.
Do NOT block
air holes
3 clip brackets.
Slip over chase collar
and attach with screws
provided.
Assemble
storm collar
around extended
termination cap
pipe
once cap is
installed.
CT
4-3/4 in. (121 mm) maximum
2 in. (51 mm) maximum
The last section of pipe must stop
between 2 in. (51 mm) above the
top of the chase and 4 3/4 in. (121
mm) below the top of the chase.
Figure 6.21 Installing CT-3A Cap Adapter
34
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
7 7
Shrouds
3 in. (76 mm) tall legs
Ø 17-1/2 in. (445 mm) Round Hole to fit over cap
Length x Width to fit inside shroud
Figure 7.1 Radiation Shield
WARNING! Risk of Fire! Shroudsmustbeconstructedas
specied.Improperconstructionmayoverheatchasetop.
NOTICE: Someregionalcodesrequireanagency-Listed
shroud.Consultyourlocalbuildingocials.
Shroudsmaybeeldconstructedwherepermittedby
regionalbuildingcodes.
Theshroudsmustbeconstructedfromminimum.018in.
(26ga)thickaluminzedsteel.
Some shrouds require a radiation shield. Use where
specied.
A. Radiation Shield
Radiationshieldmustbeconstructedofminimum26ga
thick sheet metal.
B. Field Constructed Shrouds
Thefollowingeldconstructedshrouddesignshavebeen
testedforHHTreplacesystemsandterminationcaps.
3 in (76 mm)
minimum
Min.
Base Dim.
Min.
Base Dim.
Min.
Top Dim.
Min.
Top Dim.
Min. Opening
Width
Min. Opening
Width
Radiation
Shield
14 1/2 in. (368 mm)
maximum height
TR11/11T TR11/11T TV
Min. Base Dims.
in 32 x 32 26x26
mm 813x813 660x660
Radiation Shield
Required
Radiation
Shield Not
Required
Min. Top Dims.
in 29x29 23 x 23
mm 737 x 737 584x584
Min. Opening Width
in 26x26 20 x 20
mm 660x660 508x508
1. Open Top Shroud
TR11/TR11TTV(topvented)capsdonotrequireradia-
tion shield.
TR11/TR11T caps require radiation shield unless in-
stalledpartiallyabovetheshroud.TheTRcapmustbe
raisedtotheminimumdimensions(orgreater)above
the shroud. Refer to Figure 7.3.
6" Min.
Above the
Shroud.
Storm
Collar
Shroud
Leg
(SHROUD)
(TR Series)
Flue
Shroud
Leg
3 in (76 mm)
air space from
bottom of shroud
to top of chase.
Maximum Height
14 1/2 in. (368 mm)
Chase Top
Figure 7.3 Shroud & TR Series cap with no Radiation Shield
Figure 7.2 Open Top Shroud Dimensions (with Radiation Shield)
35
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
3 in. (76 mm)
Min. Opening Height
Min, Base Dim
Min. Height
above bottom of
termination
cap
Min.
Base Dim
3 in. (76 mm) Min.
Radiation Shield Height
from top of Chase
Min, Opening Width
Radiation
Shield
Minimum
Opening Height
Figure 7.4 Mailbox Style Shroud Dimensions
Minimum
Opening
Height
Minimum
Base Dimension
Min. Opening Width
Min. Base Dimension
Minimum
Height above
Bottom of Termination Cap
Chase Top
Radiation Shield
3 in. (76 mm)
Radiation
Shield Height
Termination
Cap
Figure 7.5 Roofed Style Shroud Dimensions
3. Roofed Style Shroud
Radiation shield required
2. Mailbox Style Shroud
Radiation shield required
TR11/11T
TR11/11T TV
Min. Base Dims.
in 34x34
mm 864x864
Min. Height
Above Bottom of
Termination Cap
in 23
mm 584
Min. Opening Width
in 28
mm 711
Min. Opening Height
in 12
mm 305
TR11/11T TR11/11T TV
Min. Base Dims.
in 34x34 28x30
mm 864x864 711x762
Min. Height Above Bottom of
Termination Cap
in 28-1/4 27-1/2
mm 718 698
Min. Opening Width
in 28 22
mm 711 559
Min. Opening Height
in 18-1/4 17-1/2
mm 464 445
36
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
8 8
Finishing
Figure 7.1 Install the Finishing Template
A. Template
Acardboardtemplateofthefrontisprintedontheoutside
oftheshippingbox.Cutoutthetemplatealongtheoutside
ofthelineforuseinyourinstallation.Ifusingthecardboard
template,itwillrequire1/4-20boltstoattachittothere-
place,(NOTINCLUDED).Ametaltemplate(seecatalog)
isavailableformoredurablecontinueduse,remainingac-
curateovertime.Bothmeasure1/8in.(3mm)largerallthe
way around than the actual front.
Note:This1/8in.ofthenon-combustiblematerialmustbe
paintedortheredwillbevisible.
Tools Required: 5/32in.Allenwrench.
• Remove the screws from the fascia and remove fascia
fromthereplace(ifinstalled).Savethescrews.Store
the fascia in a safe, protected area to prevent scratching
or other damage.
• Installthetemplateonthefrontofthereplace(Figure
8.1)withscrewsremovedorprovided.
NOTE:Donotovertightenthescrews,justtightenup
the template enough so that it comes in contact with the
outerangesonthefrontofthereplace.
You are now ready to continue your installation with the
desireddecorativematerial.Thetemplatealsoservesas
a protective covering and prevents damage to the front of
thereplace.
Figure 8.1 Install the Finishing Template
Note: DO NOT remove hang tags until installing nish
materials.
NOTE: Thedecorativefasciamustberemovableforfuture
serviceability.
Figure 8.2 Template Dimensions
ATTACH TEMPLATE HERE
31-3/8
[797]
37-1/4
[946]
26
[660]
R35-1/4
[895]
R29-1/8
[740]
31
[787]
20-1/8
[511]
15-5/8
[397]
37
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
B. Finish the Wall
Useawetordrytowelorasoftbrushtoremoveanydust
ordirtfromthenon-combustiblefacingmaterial.
Applyanon-combustibleadhesivetoattachtile,stoneor
othernon-combustiblenishingmaterialspermanufactur-
er’s instructions.
1. Stone, Brick Finish
WARNING! Risk of Fire! DO NOT applytarpaperorwater
resistivebarrierovernon-combustibleboard.
• Applymetallathtothe1/2in.thicknon-combustible
board with corrosion resistantself-tapping screws
capableofpenetratingthemetalsurfacebehindthe
non-combustibleboard.
• HHT recommends using type N or type S mortar.
Duetohightemperatures,reviewpolymermodiers
specicationsheetbeforeusing.
2. Tile, Granite, Marble Finish
• Duetohightemperatures,HHTrecommendsusing
unmodiedthinsetwhenapplyingtile.
• Whenapplyinggraniteormarble,HHTrecommends
usingthinsettoadhere.Ifusingadi󰀨erentadhesive,
review specication sheet for application in high
temperature areas.
C. Mantel and Wall Projections
Acombustiblemantelmaybepositionednolowerthan60
in.(1524mm)at12in.(305mm)deepfromthebaseofthe
replace.Combustiblemantelandwallprojectionsmaybe
appliedoverthenon-combustibleboardsuppliedwiththe
replacewhenfollowingthecombustibleprojectiongures
below.
Minimumclearancefaceplatetosidewallis16in.
Thecombustiblemantelmayhaveamaximumdepthof12
in.(305mm).Combustibletrimpiecesthatprojectnomore
than3/4in.(19mm)fromthefaceofthereplacecanbe
placednocloserthan6in.(152mm)fromthesideofthe
decorativefront.SeeFigures8.3and8.4.Surroundlegs
thatprojectmorethan3/4in.(19mm)mustbe16in.(406
mm)awayfromthesideofthedecorativefront.Combus-
tibletrimmustnotcover:
• themetalsurfacesofthereplace
• where the non-combustible board is placed over the
metal surfaces
• thespacebetweenthemetalfaceofthereplaceand
framingmembers
Figure 8.4 Mantel Specications - Combustible Mantel
Anoncombustiblemantelmaybepositionednolowerthan
38in.(965mm)fromthebaseofthereplace.
Figure 8.5 Mantel Specications - Non-Combustible Mantel
60 in.
(1524 mm)
Mantel
Clearances are from
bottom of appliance to
lower edge of mantel
or trim
Trim
48 in.
(1219 mm)
36 in. (914 mm)
Ceiling/enclosure
Trim 3/4 in.
max
12 in.
(305 mm)
Non-combustible
Mantel
Clearances are
from bottom of
appliance to
lower edge of
mantel or trim.
12 in.
(305 mm)
deep
38 in.
(965 mm)
Non-combustible
mantel may be
positioned
anywhere within
the shaded area.
60 in.
(1524 mm)
12 in.(305 mm)
Grid represents
1 in. squares
60 in.
(1524 mm)
Measured up from
the base of the
fireplace.
Non-combustible
Decorative Facing
such as: Steel, iron,
brick, tile, concrete,
slate, tile, plasters.
DO NOT cover any
air openings in the
face of the fireplace.
48 in.
(1219 mm)
Measured up from
the base of the
fireplace.
Non-combustible board
Combustible mantel may
be positioned anywhere
within the grid area in
front of non-combustible
board
56 in.
(1422 mm)
Measured up from
the base of the
fireplace.
8 in.(203 mm)
Combustible wall
Combustible mantel and wall projects
may be applied over the non-combustible
board supplied with the fireplace when
following the combustible projection
figures below.
WARNING:
Seal joint with non-combustible
sealant to prevent heat from
being drawn into the wall cavity
Figure 8.3 Mantel Height
38
Note:IfLintelBaris
used make sure it does
notcovercombustible
material.
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
8 in. (203mm) minimum
from each side of
fuel opening
A
B
Figure 8.6 Minimum Hearth Extension Dimensions
Model # WARMMAJIC A B
in.
41 20
mm
1041 508
• FireplaceandHearthExtensionushontheoor
Non-combustibleooringaminimumof20in.(508mm)
infrontofand8in.(203mm)toeithersideofthefuel
openingisrequiredasshowninFigure8.6.
The construction of, and materials used for a hearth
extensionareshowninFigure8.7.Ahearthextension
of this construction may be covered with any non-
combustible decorative material and may have a
minimumthicknessasperFigure8.7.Sealgapsbetween
thehearthextensionandthefrontofthereplacewitha
beadofnon-combustiblesealantorgrout.
Fascia
Outer Shell
Flange
Protective metal
hearth strip
Tile,marble or other
non-combustible finish material
Minimum 2 in. (51mm) Cement Board or
equivalent, (or one piece HX4)
Minimum 20 in. (508mm) in front and
8 in. (203mm) on sides to fuel opening
Combustible Floor
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . .
Non-combustible
material supplied
with unit.
. . . . . . . . . . .
Non-combustible sealant or grout
Tile,marble or other
non-combustible
finish material
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 8.7 Fireplace and Hearth Extension Flush on the Floor.
D. Finishing the Hearth Extension
Table 8.1
R = 1/k x inches of thickness
Table 8.2
WARNING! Risk of Fire! Hightemperatures,sparks,em-
bers or other burning material falling from the replace
mayigniteooringorconcealedcombustiblesurfaces.
• ProtectivemetalhearthstripsMUSTbeinstalled.
• Hearth extensions MUST be installed exactly as
specied.
Ahearthextensionmustbeinstalledwithallreplacesto
protectthecombustibleoorinfrontofthereplacefrom
bothradiantheatandsparks.
• YouMUSTuseahearthextensionwiththisreplace.
• RefertoFigure8.6forminimumdimensions.
• Thisreplacehasbeentestedandapprovedforusewith
a hearth extension insulated to a minimum R value of
1.03.
• ThehearthextensionmaterialMUSTbecoveredwith
tile,stoneorothernon-combustiblematerial.
• Manufactured hearth materials will usually have a
published R value (resistance to heat) or k value
(conductivityofheat).RefertotheformulainTable8.1
to convert a k value to an R value,
• Refer toTable 8.2 for hearth extension insulation
alternatives.
WARNING! Risk of Fire!
Youmust complywithallminimumair spaceclearances
tocombustiblesasspecied.Framingornishingmaterial
usedonthefrontof,orinfrontof,thereplacecloserthan
theminimumslistedmustbeconstructedentirelyofnon-
combustible materials (i.e., steel studs, concrete board,
etc.).Failuretocomplymaycausere.
• Fireplaceinstalledushontheoorandhearthextension
raisedtobottomoffascia:
Non-combustibleooringaminimumof20in.(508mm)
infrontofand8in.(203mm)toeithersideofthefuel
openingisrequired(seeFigure8.6).
Hearth Extension Insulation Alternatives, R Value = 1.03
Material
k per inch
thick
r per inch
thick
Minimum
thickness
required
Hearth&HomeHX3,HX4 0.49 2.06 1/2 in.
USG Micore 300™ 0.49 2.06 1/2 in.
USG Durock™ Cement Board 1.92 0.52 2 in.
Cement Mortar 5.0 0.20 51/8in.
Common Brick 5.0 0.20 51/8in.
CeramicTile 12.50 0.08 121/4in.
Armstrong™ Privacy Guard Plus 0.46 2.18 1 in.
Marble 14.3-20.0 0.07-0.05 14 5/8 in. - 20 3/8 in.
39
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
• RaisedHearthExtensionFraming
The hearth framing must be constructed of non-
combustible materials (such as metal framing or
equivalent material) and topped with one HX4, or
equivalentmaterial(Table8.2).
When creating the platform, allow for the thickness of
the non-combustible nishing materials (Figure8.8).
Outer Shell
Flange
Non-combustible
material supplied
with unit
Fascia
Protective metal
hearth strip
Minimum 2 in. (51 mm) Cement Board or
equivalent, (or one piece HX4)
Minimum 20 in. (508 mm) in front and
8 in. (203 mm) on sides to fuel opening
Combustible Floor
Non-combustible sealant or grout
Tile,marble or
other
non-combustible
finish material
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . .
Non-combustible
framing materials
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 8.8 Raised Hearth Extension to Bottom of Fascia
WARNING! Risk of Fire!
Hearthextensionsaretobeinstalledonlyasillustratedto
prevent high temperatures from occurring on concealed
combustiblematerials.
E. Non-Combustible Sealant Material
• After completing the installation of non-combustible
facingboardintherequirednon-combustiblezoneand
thenon-combustiblenishingmaterialoverthat,remove
the template.
• Abeadofnon-combustiblesealantmustbeusedtoclose
o󰀨anygapsatthetopandsidesbetweenthereplace
andnon-combustiblefacing(Figure8.9)topreventcold
airleaksandtheriskofre.Largegapscanbebridged
withberglassropegasket.
• When installation of the decorative material is complete,
replace/installthefasciaandreplacedoors.
WARNING! Risk of Fire!
• Maintainclearances.
• Useonlynon-combustiblematerialbelowstandos,
materialsuchascementboardisacceptable.
• Framingornishingmaterialusedonthefrontofthe
replace closer thantheminimums listed, must be
constructed entirely of non-combustible materials
(i.e.,steelstuds,concreteboard,etc.).
WARNING! Risk of Fire!
Hearth & Home Technologies is not responsible for
discoloration, cracking or other material failures of
nishingmaterialsduetoheatexposureorsmoke.
• Choosenishingmaterialscarefully.
WARNING! Risk of Fire!
Sealaroundnishingmaterialtoreplace.
Seal inside perimeter of
fireplace finished opening
with non-combustible grout
prior to installing front facia
to prevent risk of fire and
cold air infiltration.
46 in.
(1168 mm)
58-1/4in.
(1480 mm
)
NON-COMBUSTIBLE ZONE
Finished Wall
Figure 8.9
Note:Forinstallationswithvinylooring,
special clearance recommendations
apply.
VinylFlooringissensitivetoheat.A48inchminimum
depth hearth extension is recommended when using
vinylooringuptothewall.SeeFigure8.8.
Notice: Clearances that do not meet the minimum
guidelinescouldresultindamageorbucklingtothevinyl
ooringand isdone atthe installer’sor homeowner’s
risk.
HearthandHomeTechnologiesdoesnotrecommend
adhesivebasedvinylooringduetothermalexpansion.
Floating-style ooring can be used, but will reach
temperatures up to 110°F in a room with ambient
temperaturesof70°F.Consultooringspecicationsto
ensurecompatibility.
Vinyl Flooring
40
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
9 9
Fireplace Setup
A. Firebrick Placement
Thereboxofyourreplaceislinedwithhighqualityre-
brick,whichhasexceptionalinsulatingproperties.
Donotuseagrate;simplybuildareonthereboxoor.
Do not operate the replace without bricks. Make sure
bricksareinstalledasshown.
IMPORTANT:Becertainyouhavetheproperbrickinthe
correctlocation.Measurethebricksizeforaccuracy.
Figure 9.1 Fire Brick Congurations
Table 9.1
- Removenewbricksetfromboxandlayouttodiagram
asshowninFigure9.1.
- Laybottombricksinrebox.
- Installrearbricksonthetopofthebottombricks.Slide
topofbricksundercliponbackofreboxwalland
pushbottomofbrickback.
- Install sidebricks.Slide topofbrick underclipson
sideofreboxandpushthebottomofthebrickuntil
itisushwiththesideoftherebox.
ITEM PART NUMBER PART NAME QTY
1 4182-101 BRICK WRAP 8
2 4182-203 FIREBRICK 13.25 X 3.25 2
3 4182-301 FIREBRICK 13.25 X 4.50 X 1.25 10
4 4184-201 FIREBRICK 12.25 X 4.50 4
5 4184-203 FIREBRICK 12.25 X 3.25 2
2
3
3
3
3
3
1
3
3
3
5
4
4
4
2
4
3
5
3
# Brick Size Qty. in Set
1 Brick Wrap 8
2 Firebrick13.25x3.25 2
3 Firebrick13.25x4.50x1.25 10
4 Firebrick12.25x4.50 4
5 Firebrick12.25x3.25 2
41
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
B. Ba󰀪e and Blanket Placement
Ensurecorrectba󰀪eandba󰀪eprotectionchannelplace-
ment;replaceba󰀪ecomponentsifdamagedormissing.
Theceramicblanketandba󰀪eboardMUSTbeincontact
withthebackofthereboxandevenwitheachotherinthe
front.Theba󰀪eprotectionchannelMUSTbeinposition.
Figure 9.2
Ceramic Blanket
Back of Firebox
Baffle Board
Baffle Protection
Channel in position
C. Install Fascia (Fronts)
Front is required to complete the installation. Instructions
for attachment of the front is included with it. Contact your
localdealerwithanyquestionsono󰀨eringsorinstallation.
42
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
A. Chimney Components
ThefollowingdrawingsshowtheSL-300Serieschimneyandreplacecomponentswhichmaybesafelyusedwiththis
replace.The8in.DuraPluscanalsobeused.
ID4 Insulated Duct
UD4 Uninsulated Duct
42 in.
(1067 mm)
4 in. (102 mm) i.d.
42 in.
(1067 mm)
4 in. (102 mm) i.d.
8 in.
(203 mm)
10-1/2 in.
(267 mm)
A
B
10-1/2 in.
(267 mm)
12 in.
(305 mm)
5-1/4 in.
(133 mm)
4 in. (102 mm)
12 in.
(305 mm)
CAK4A Chimney Air Kit (shipped with replace)
10 10
Reference Materials
Catalog # Description
CAK4A ChimneyAirKit(shippedwithreplace)
ID4 InsulatedDuct(usedwithchimneyairkit)
UD4 UninsulatedDuct(usedwthchimneyairkit)
SL306 ChimneySection-6in.(152mm)long
SL312 ChimneySection-12in.(305mm)long
SL318 ChimneySection-18in.(457mm)long
SL324 ChimneySection-24in.(610mm)long
SL336 ChimneySection-36in.(914mm)long
SL348 ChimneySection-48in.(1219mm)long
CAS8 Attic Shield Kit
SL3 ChimneyStabilizer
SL315 ChimneyO󰀨set/Return-15deg
SL330 ChimneyO󰀨set/Return-30deg
FS338 Ceiling Firestop - Straight
FS339 CeilingFirestop-15deg
FS340 Ceiling Firestop - 30 deg
AS8
SL300StraightAtticInsulationShield,24in.
(610mm)(shippedwithreplace)
JB877 Chimney Joint Band
CB876 Chimney Bracket
RF370 RoofFlashing-Flatto6/12Pitch
RF371 RoofFlashing-6/12to12/12Pitch
DTO134/146 Octogonal Decorative Caps
DTS134/146 Square Decorative Caps
ST375 SquareTerminationCap
TCT375 TerraCottaTerminationCap
TR344 RoundTerminationCap
TR342-B RoundTelescopingTerminationCap
TR-TVK TRTopVentKit
TS345 SquareTerminationCap
TS345P SquareTerminationCap-Painted
12966A ManufacturedHomeThimble
MH841
ManufacturedHomeThimbleExtension20
in./508mm
HX4 MicoreHearthExtension,20in./508mmwide
LDS33 DecorativeShroud-3ftx3ft(.91mx.91m)
LDS46
DecorativeShroud-4ftx6ft(1.22mx1.83
m)
LDS-BV
DecorativeShroud-26in.x26in.(660mmx
660mm)
FieldConstructedShrouds(See“Woodburning
TerminationCap”)
CT-3A-B Adapter-Maybeusedwiththefollowingcaps
CTSeries
DTSeries
8DP-BP
DuraplusBasePlate(requiredifusing
DuraPlusChimney)
Catalog #
A B
in mm in mm
SL306 6 152 4-3/4 121
SL312 12 305 10-3/4 273
SL318 18 457 16-3/4 425
SL324 24 610 22-3/4 578
SL336 36 914 34-3/4 883
SL348 48 1219 46-3/4 1187
Storm Collar
Attic Collar
Attic Spacer
Attic Shield Kit
43
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
RF370 - Roof Flashing Flat to 6/12 Pitch
RF371 - Roof Flashing 6/12 to 12/12 Pitch
Firestop Spacer
A = Actual Length
B=E󰀨ectivelength(lengthofchimneypart
afterithasbeensnappedtoanother)
A
B
14-1/2 in.
(368 mm)
24-5/8 in.
(625 mm)
27-3/8 in.
(695 mm)
12 in.
(305 mm)
31 in.
(787 mm)
24-5/8 in.
(625 mm)
12 in.
(305 mm)
Catalog # A B
FS338 0-deg. 14-1/2in. 368mm
FS339 15-deg. 18-3/8in. 467mm
FS340 30-deg. 23 in. 584mm
20-3/4 in.
(527 mm)
Inside
Diameter
8 in.
(203 mm)
Outside
Diameter
10-1/2 in.
(267 mm)
4-3/4 in. (121 mm)
Effective Height
SL3 Chimney Stabilizer
AS8 SL300 Straight Attic Insulation Shield (shipped with unit)
2 in. (51 mm)
10-1/2 in.
(267 mm)
JB877 Chimney Joint Band
10-1/2 in.
(267 mm)
CB876 Chimney Bracket
MH841 Manufactured Home Thimble Extension
24-5/8 in.
(625 mm)
16-5/8 in.
(422 mm)
29 in.
(737 mm)
16-5/8 in.
(422 mm)
12966A Manufactured Home Thimble
Assembled
Diameter: 14 1/2 in./368 mm
Height: 24 in./610 mm
20 in.
(508 mm)
66 in.
(1676 mm)
1/2 in.
(13 mm)
HX4 Micore Hearth Extension
Inside
Diameter
8 in. (203 mm)
Outside
Diameter
10-1/2 in.
(267 mm)
SL315 Chimney O󰀨set/Return - E󰀨ective Height 13-3/8in. (340 mm)
SL330 Chimney O󰀨set/Return - E󰀨ective Height 15-1/2in. (394 mm)
44
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
B
A
C
B
C
A
DTS134/DTS146 DTO134/DTO146
Decorative Caps
DTO134
A B C
in
34 20 24
mm
864 508 610
DTO146
in
46 22.7 26
mm
1168 576 660
DTS134
A B C
in
34 21.18 24
mm
864 538 610
DTS146
in
46 21.18 26
mm
1168 538 660
15-3/4 in.
(400 mm)
TR344 Round Termination Cap
TCT375 Terra Cotta Cap
TR342-B Round Telescoping Termination Cap
ST375 Square Termination Cap
45
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
TR-TVK Top Vent Kit
A
B
C
D
Catalog #
A B C D
in. mm in. mm in. mm in. mm
LDS33 36 914 36 914 8.5 216 11 279
LDS46 48 1219 72 1829 8.5 216 11 279
LDS33/LDS46 Decorative Shroud
Catalog # A B C D E
LDS-BV
in. 26 12.5 15.5 22 23
mm 660 318 394 559 584
E
D
A
C
B
LDS-BV Decorative Shroud
TS345/TS345P Square Termination Cap
CT-3-B
46
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Catalog # Description
DV-8DP-BP 8"DuraPlusbaseplate
DV-8DP-E15 8"DuraPlus15°elbowkit
DV-8DP-E30 8"DuraPlus30°elbowkit
DV-8DP-E15KSS 8"DuraPlus15°elbowkit(SS)
DV-8DP-E30KSS 8"DuraPlus30°elbowkit(SS)
DV-8DP-WS 8"DuraPluswallstrap
DV-8DP-ES 8"DuraPluselbowstrap
DV-8DP-AWS 8"DuraPlusadjustablewallstrap
DV-8DP-WSSS 8"DuraPluswallstrap(SS)
DV-8DP-FRS 8"DuraPlusrestopradiationshield
DV-8DP-XRB 8"DuraPlusextendedroofbracket
DV-6DP-SC 6-8Stormcollar
DV-8DP-F6 8"DuraPlusashing0/12-6/12
DV-8DP-FF 8"DuraPlusatroofashing
DV-8DP-F12 8"DuraPlusashing7/12-12/12
DV-8DP-06 8x6DuraPluspipe
DV-8DP-09 8x9DuraPluspipe
DV-8DP-12 8x12DuraPluspipe
DV-8DP-24 8x24DuraPluspipe
DV-8DP-24SS 8x24DuraPluspipe(SS)
DV-8DP-36 8x36DuraPluspipe
DV-8DP-36SS 8x36DuraPluspipe(SS)
DV-8DP-VC 8"DuraPluschimneycap
DV-6DP-IS Attic Insulation Shield
DuraPlus Venting
B. Accessories
Lintel Bar
LINTELBAR-HHT
Finishing Template
TMP-MED-ARC
Heat-Zone-WD-C
Outside Air O󰀨set Adapter
OA-RD-6
Mesh-HHT-C Firescreen
47
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
C. O󰀨set Diagrams
53
[1346]
38
[965]
2
[51]
2
[51]
91
[2311]
3-1/2
[89]
1/2
[13]
1/2
[13]
54
[1372]
41
[1041]
2
[51]
2
[51]
95
[2413]
5-1/2
[140]
1/2
[13]
1/2
[13]
O󰀨sest for 2x4 Wall Construction
O󰀨sest for 2x6 Wall Construction
48
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26
background
Majestic,abrandofHearth&HomeTechnologies
1915WestSaundersStreet,MountPleasant,Iowa52641
www.replaces.com
Please contact your Majestic dealer with any questions or concerns.
ForthelocationofyournearestMajesticdealer,pleasevisitwww.replaces.com.
49
Majestic • WARMMAJIC-D Install Manual • 4188-903 • Rev D • 2/26

Specifications

Indexed Terms: Wood Fireplace, Heat Zone

Majestic WARMMAJICD Questions and Answers

Questions and Answers

Related Products