
Thank you for ordering our product. If you have any issue, please email it and your order ID
to [email protected] or call (888) 680-2849
SKU:TDA-0651


1

2
Mounting handle bars & drill
Install the bar holder (I-1) and operation handle (i-7) as shown in Fig.L.
Tighten the bar holder (I-1) and operation handle (i-7) with screws and nuts as shown in Fig.M.
To mount the drill (Fig. M) turn the aggregate upside down,
Put the drill to the drill adapter
that you can plug the shear pin through the holes(Fig.N).
Insert the shear pin through the drill and drill adapter and secure the shear pin with the
split pin(Fig. O).
Install the fish
tail shaped small part(Fig.P) and the other end of the drill bit along the
thread and tighten it on the drill bit(Fig.Q).
Fig.L Fig.N
Fig.M
Fig.O
Fig.Q
Fig.P

3

4

5

6

7

8

9

10

11

90

