Vevor CNH-PF-S721A CH Frameless Shower Door 58-59" x 75" SGCC Tempered Glass 5/16" Chrome

Product's Documents

Below are documents related to this product, you can read online or download:
CNH-PF-S721A CH photo

User Manual

This is the main product document for model CNH-PF-S721A CH.

The file format is pdf, 16 pages, you can download this manual here .

background
Technical Support and E-Warranty Certificate www.vevor.com/support
SHOWER DOOR
USER MANUAL
We continue to be committed to provide you tools with competitive price.
"Save Half", "Half Price" or any other similar expressions used by us only represents an
estimate of savings you might benefit from buying certain tools with us compared to the major top
brands and does not necessarily mean to cover all categories of tools offered by us. You are
kindly reminded to verify carefully when you are placing an order with us if you are actually saving
half in comparison with the top major brands.
background
- 1 -
MODEL: CNH-PF-S721A CH/ CNH-PF-S721A MB
Photo for reference
NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact us:
Technical Support and E-Warranty Certificate www.vevor.com/support
This is the original instruction, please read all manual instructions carefully before
operating. VEVOR reserves a clear interpretation of our user manual. The
appearance of the product shall be subject to the product you received. Please
forgive us that we won't inform you again if there are any technology or software
updates on our product.
SHOWER DOOR
background
- 2 -
SAFETY INSTRUCTION AND PRECAUTIONS
Please read this user manual carefully
Assembly Precautions
1. Carefully check the box for any damages. If damaged, please take a photo for
your record and contact our service team for help.
2. It is dangerous if not installed correctly.Fasten all screws, nuts before using it.
3.Please assemble according to these instructions. Improper assembly can create
hazards.
4. Wear ANSI-approved safety goggles and heavy-duty work gloves during
assembly.
5.Keep the assembly area clean and well-lit.
6. Please do not discard the box until after you have finished assembling the
shower door.
7.Do not assemble when tired or when under the influence of alcohol, drugs or
medication.
8.Do not alter this product in any manner.
9.The box contains some small components; please place them properly before
installation to keep them away from kids and ensure safety.
Installation instructions
1.Dimensional measurement
Before installing the bathroom door, it is necessary to first measure the size of the
door correctly. Firstly, measure the width and height of the door opening to
determine the dimensions of the door leaf and frame. It should be noted that
bathroom doors require more sealing than regular doors, so there may be some
special size requirements. It is important to measure carefully to ensure that the
door size meets the requirements.
2. Door frame installation
When installing the door frame, attention should be paid to the verticality and
levelness of the door frame. The verticality of the door frame can be achieved by
installing support blocks and adjusting the horizontal and vertical alignment, while
the levelness of the door frame needs to be calibrated on the basis of installing a
leveling instrument. In addition, in order to increase the waterproof performance of
the door frame, it is necessary to perform sealing treatment at the bottom and side
of the door frame, fill the gaps with waterproof adhesive, and install waterproof film
on the inside of the door frame.
background
- 3 -
After installation, you can choose to stick explosion-proof film on the glass door.
Even if the glass door breaks, its glass debris will not splash to various parts of the
bathroom, not only minimizing the probability of accidental injury, but also
facilitating people's cleaning.
NOTE: We recommend two people to assemble the shower door. It will need to
take about an hour,
Please check the parts carefully according to the parts list. If you are missing any
parts, please contact our customer service department.
Part List
background
- 4 -
The shower room in the above listed sizes can be installed on the floor or
on the shower plate that must be 100% balanced.
background
- 5 -
THIS SHOWER IS REVERSIBLE
background
- 6 -
background
- 7 -
background
- 8 -
background
- 9 -
background
- 10 -
background
- 11 -
background
- 12 -
background
- 13 -
Note: Before applying glass glue, make sure all surfaces are clean and dry, and let
it dry for 24 hours after finishing
background
- 14 -
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu,
shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW
2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place,
Rancho Cucamonga, CA 91730
REP
EC
E-CrossStu GmbH
Mainzer Landstr.69, 60329 Frankfurt am Main.
REP
UK
YH CONSULTING LIMITED.
C/O YH Consulting Limited Office 147, Centurion House,
London Road, Staines-upon-Thames, Surrey, TW18 4AX
background
Technical Support and E-Warranty Certificate
www.vevor.com/support

Specifications

Vevor CNH-PF-S721A CH Questions and Answers

See other models: SHK-004 VVSC001 A-809 2TJZ TH-40AXN