Loading ...
Loading ...
Loading ...
En-6
4-2.GASCHARGE
Perform gas charge to unit.
1)Connectgascylindertotheserviceportofstopvalve.
2) Perform air purge of the pipe (or hose) coming from refrigerant gas cylinder.
3)Replenishspeciedamountoftherefrigerant,whileoperatingtheairconditionerforcooling.
Note:
Incaseofaddingrefrigerant,complywiththequantityspeciedfortherefrigeratingcycle.
CAUTION:
When charging the refrigerant system with additional refrigerant, be sure to use liquid refrigerant.
Adding gas refrigerant may change the composition of the refrigerant in the system and affect
normal operation of the air conditioner. Also, charge the liquid refrigerant slowly, otherwise the
compressorwillbelocked.
To maintain the high pressure of the gas cylinder, warm the gas cylinder with warm water (under
104°F(40°C))duringcoldseason.Butneverusenakedreorsteam.
Union
Stopvalve
Liquid
pipe
Indoor
unit
Stopvalvewith
serviceport
Gas
pipe
Refrigerant gas
cylinder
operatingvalve
(for R410A)
Gaugemanifold
valve(forR410A)
Charge hose
(for R410A)
Refrigerant gas cylinder for R410A with siphon
Electronic scale for refrigerant charging
Refrigerant (liquid)
Outdoor
unit
Union
Union
Union
Model Indoor unit
MXZ-2C20NA2
AB
4-3.REMOVINGTHEMAINTENANCEPANEL
The setting of Dip Switch on the outdoor controller board can be changed
withoutremovingthefrontpanel.
Followtheproceduresbelowtoremovethemaintenancepanelandset
the Dip Switch.
1)Removescrew(s)whichxthemaintenancepanel.
2)Removethemaintenancepanel,andperformnecessarysettings.
3) Install the maintenance panel.
Note:
Makesuretoxthemaintenancepanelsecurely.Incompleteinstallation
could cause malfunction.
Maintenance panel
BH79A325H03_en.indd 6 2018/08/06 13:12:25
Loading ...
Loading ...
Loading ...