Follett 15CI100AIWCFST00 15CI100A-IW-CF-ST-00 15 15 Series Ice & Water Dispenser Chewblet Style Ice, 125 lb

User Manual - Page 8

For 15CI100AIWCFST00.

PDF File Manual, 48 pages, Read Online | Download pdf file

15CI100AIWCFST00 photo
Loading ...
Loading ...
Loading ...
8 7CI100A/7FS100A, 15CI100A/15FS100A
Installation
CAUTION!
No service or maintenance should be performed until the technician
has thoroughly read this service manual. Except for routine cleaning
and sanitizing, only qualied technicians should attempt to service
or maintain this equipment.
Countertop Installation
The 7 Series countertop model is designed to t on counters underneath
standard mounted cabinets, this does not apply to 15 Series models. See
page 4 for dimensions. Installation instructions for freestanding model
may be found on page 9.
1. A clearance of at least 3" (7.62 cm) is required behind and on
each side of the dispenser for electrical connection and ventilation
(Fig.1).
2. Rough-in the electrical service and water line.
§ Electrical: 115 V, single phase, 15A receptacle required. The dispenser
has an integral 8 ft (2.4 m) cord and plug.
§ Water: supply line (with shut-off valve) connects to the dispenser's
1/4" MPT inlet.
NOTICE!
If installing optional Drip Tray Drain Kit or Leg Accessory,
complete those steps before proceeding. Refer to instructions
included with the Drip Tray Drain Kit, or see
page 9 for Leg
Accessory instructions.
Fig. 1
3. Connect water line. Recommended routing (Fig. 2) allows easy access
to water for cleaning and sanitizing procedure.
4. If installing the optional internal water lter*, please see
Maintenance/Cleaning Mode on page 12 before proceeding. If
not, proceed to step 5.
* If your dispenser has the internal water lter option, the water lter must be
installed for the dispenser to operate. Because internal components will need to
be accessed for both procedures, Follett recommends installing the water lter
just prior to initial sanitizing.
5. Connect power supply.
6. Sanitize the dispenser prior to use (see the Initial Sanitizing Kit
instructions shipped with this unit).
Fig. 2
countertop models
minimum 3" (7.62 cm)
clearance required
1/4" MPT
3' (91.4 cm)
Plug
Valve
Loading ...
Loading ...
Loading ...