Loading ...
Loading ...
Loading ...
DETAIL A
Secure with plastic ties 2 per
side
2 Plastic tubes ensure tubes
drain into pan
5/8”
(15mm)
PLASTIC TIE
PLASTIC TUBE
PLASTIC TIE
PLASTIC TUBE
CORRECT INCORRECT
Model Tube Length
SVZ-KP12, 18, 24 4.9 in. (125 mm)
SVZ-KP30, 36 6.9 in. (175 mm)
DETAIL A
Reinstall the coil assembly along with bracket(s) that secure(s) it. Failure to reinstall the brackets will result
in capacity loss and condensation formation inside the cabinet. Reconnect the waterproof connector inside
the coil section.
Refer to 10.3. Step 1 to 3 in reverse order to reassemble the panels. Ensure the proper knockouts are re-
moved for drainage and electrical connections.
CAUTION
For Horizontal installation, an auxiliary drain pan must be installed.
SVZ-KP12,18, 24, 30, 36NA
Specifications are subject to change without notice. 21 © 2022 Mitsubishi Electric US, Inc.
ENGLISH
Loading ...
Loading ...
Loading ...