Avid Power ACD318-DB Cordless Drill Set 20V Power Drill/Screwdriver

Operator's Manual - Page 11

For ACD318-DB.

PDF File Manual, 18 pages, Read Online | Download pdf file

ACD318-DB photo
Loading ...
Loading ...
Loading ...
10
OPERATING
7. Insert the switching adapter/plug into a correct household current
receptacle.
8. The end of the battery pack has positive and negative terminal
markings on it. Align these with the identical markings on the top of
the charging stand and insert pack into base. (Pack will not insert
properly if reversed)
9. The green light is the power indicator. When the charger is
connected to AC household current, the green light is on (Fig.3).
10. The red light is the charge indicator. When the battery is properly
inserted into the charger and charging, the red light is on.
11. Normal charging time is 3 to 5 hours. The charger will charge the
battery at the normal rate until charging is complete. The red light will
turn off once charging is complete. After the battery is fully charged
according to the charging time provided in the instructions, remove
the battery pack from the charging stand immediately.
Battery temperature will cool to normal.
12. When charging more than one battery pack, allow 15 minutes
between charges.
13. After many charge/discharge cycles, your battery will lose its ability
to hold a charge. It should then be replaced. Dispose of batteries at
an appropriate waste disposal facility. Do not throw batteries away in
common trash receptacles.
When the machine is obstructed, please turn off the switch right
away and check if the work piece is right. An obstruction may
cause the machine motor to be burned.
REMEMBER: This tool is cordless and does not need to be connected
to a power supply.
Loading ...
Loading ...
Loading ...