Loading ...
1
INSTALLATION & OPERATION
IMPORTANT!!! PLEASE READ BEFORE
INSTALLATION
■ If the unit has recently been transported, please let unit stand still for a
minimum of 24 hours before plugging it in.
■ Make sure that the unit drops down to the desired temperature before
loading the unit with product.
■ Make sure that there is proper ventilation around the unit in the area
where it will operate.
■ Make sure all accessories are installed (i.e. shelves, shelf clips, casters)
before plugging the unit in.
■ Please read through the Operation / Owner’s Manual in its entirety
before installation.
CABINET LOCATION AND INSTALLATION
GUIDELINES
■ Install the unit on strong and leveled surfaces.
■ Unit may make noises if the surface is uneven.
■ Unit may malfunction if the surface is uneven.
■ Install the unit in an indoor, well-ventilated area.
■ Unit performs more efficiently in a well-ventilated area.
■ For best performance, please maintain clearance of 4” on the back
of the unit.
■ Outdoor use may cause decreased efficiency and damage to the
unit
■ Avoid installation in a high humidity and/or dusty area.
■ Humidity could cause unit to rust and decrease efficiency of the
unit.
Loading ...
Loading ...
Loading ...