Bunn 356000020 Multi-Hopper Stainless Steel Coffee Grinder & Storage System

Owner's Manual - Page 6

For 356000020.

PDF File Manual, 24 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
6
Grind Pad (a) – Pressing initiates a grind cycle.
Stop Pad (b) – Pressing ends the operation of the grinder.
® Pads (c) – Hidden” buttons used to navigate setup and programming menus.
Pads (d) – “Hidden” buttons used to navigate setup and programming menus.
Hopper/Batch Selector Pads (e) – Press button to select small, medium or large batch size.
These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads.
Selecting one of these pads will select the amount of grind and the side from which to grind.
OPERATING CONTROLS
a b
d
c
(left)
c
(right)
e
Grind Pad (a) Pressing initiates a timed grind cycle.
Stop Pad (b) Pressing ends the operation of the grinder.
Pads (c right) – Hold “Hidden” button 2 seconds to ENTER programming, then use to navigate
setup and programming menus.
(c left) – Use “Hidden” button to navigate setup and programming menus.
Pads (d) “Hidden” buttons used to navigate setup and programming menus.
Hopper/Batch Selector Pads (e) – Press buttons to select small, medium or large batch size.
These pads are located on the circles showing 1/3, 1/2 and full brews on each side of the grinder with a
total of 6 pads. Selecting one of these pads will select the amount of grind and the side from which to grind.
GRIND
STOP
a b
e
c
(left)
d
c
(right)
Early Models
Loading ...
Loading ...
Loading ...