Premier BFK5S9BP

User Manual - Page 16

For BFK5S9BP.

PDF File Manual, 32 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
INSTALLATION INSTRUCTIONS
PORCELAIN BACKGUARD INSTALLATION
1. Remove range main top. (See Page 11)
2. Position backguard down over flue box onto range main sides.
3. Assemble backguard to range main sides with (2) (A) bolts and (2) (C)
sheet metal screws.
4. If backguard has a clock, connect plug (D) from backguard to plug (D)
from back of range.
5. Replace range main top.
THERMOPLASTIC END CAP BACKGUARD INSTALLATION
1. Remove range main top. (See Page 11)
2. Position backguard down over backguard support and flue box.
3. Screw (2) (A) black sheet metal screws through backguard end caps into
backguard support ends.
4. From rear of unit, screw (2) (B) long sheet metal screws through back of
backguard end caps into backguard support.
5. If backguard has a clock, connect plug (D) from backguard to plug (D)
from back of range.
VENT RAIL BACKGUARD INSTALLATION
1. Remove range main top. (See Page 11)
2. Lower vent rail over flue box and down on range main side matching
up holes in vent rail with holes on the top rear flange of range main sides.
3. Fasten vent rail to top flange of main side with (2) (A) bolts and (2) (A) sheet
metal screws.
14
Loading ...
Loading ...
Loading ...