Loading ...
Loading ...
Loading ...
122
2-2. Charging
Owner’s Manual_USA_M6718BE_en
■ Setting “Charge Now” to on
The “Charge Now” setting can
be changed by performing one
of the two following procedures.
Operation on “Charging
Schedule” screen
1 Perform step 1 to 4 of the
“Registering the charging
schedule” procedure
(P.119) and display
“Charging Schedule” screen.
2 Press or of the meter
control switches to select
“Charge Now”, and then
press .
Each time is pressed,
“Charge Now” switches between
on and off.
Operation on “Closing Dis-
play” screen
*
*
: If “Closing Display” is not set to
“Charging Schedule” on the
screen of the multi-information
display, the “Closing Display” is
not displayed. In this case, check
the settings on the multi-informa-
tion display.
1 Turn the power switch off.
The “Closing Display” screen
is displayed on the multi-
information display.
(If the door is opened while
waiting for charging sched-
ule, the same screen will be
displayed.)
2 Press to set “Charge
Now” to on.
After setting operations are
complete, charging starts when
the AC charging connector is
connected.
■ Displaying “Next Event”
1 Perform step 1 to 4 of the
“Registering the charging
schedule” procedure
(P.119) and display
“Charging Schedule” screen.
2 Press or of the meter
control switches to select
“Next Event”, and then press
.
The “Next Event” screen will be dis-
played.
■ When charging schedule set-
ting operations are canceled
When the vehicle is in the following
conditions, charging schedule set-
ting operations are canceled.
● The power switch is operated
before the settings are confirmed
● The vehicle starts off
● A display with a higher priority
than that of the charging schedule
setting is shown
NOTICE
■ While performing the setting
operation
When performing the setting
operation while the EV system is
stopped, be careful that the
12-volt battery will not be dis-
charged.
Loading ...
Loading ...
Loading ...