Schweigen BRB722ST Silent Multi Purpose Square Integrated Exhaust Fan and Ducting Kit

User Manual - Page 7

For BRB722ST.

PDF File Manual, 24 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Page 7
Roof Installation
Recommended duct length: minimum 4 metres.
Mount 150mm (ISD) rigid PVC pipe securely to beams, trusses or other appropriate structures: refer gure 1.
The pipe should be mounted vertically with the roof penetration being sealed using a Dektite or other appropriate
sealing membrane or device.
Ensure that the PVC pipe protrudes a minimum of 50mm past the top of the Dektite, checking that the fan
assembly clears the roof cladding at upper edge as shown in gure 1 — Roof Mount Option.
Pass power cord and plug through mounting ange and pipe, then out the slotted PVC pipe for connection to the
socket. Refer to gure 4.
Do not insert plug into socket outlet or switch on until installation has been completed. Fit fan module to pipe and
x in position using side locking screw.
Certain external installation congurations may cause audible levels of noise to be heard due to the air being
expelled from the motor. To minimize external noise disturbance you can use between 4 to 8 metres of duct to
place the Isodrive motor in an appropriate position.
Please be aware that the 900 motor is capable of expelling air at 900m
3
/hr.
For more information on environmental noise limit and conditions please contact your local Council. We have a list
of experienced installers available on the Schweigen website.
Do not install the duct in a straight line and minimum of two gentle bends in the ducts is required.
4. Installation
Loading ...
Loading ...
Loading ...