Waldorf RNB8813G Bold 1200mm Gas Range Static Oven

Installation Operation Manual - Page 7

For RNB8813G.

PDF File Manual, 32 pages, Read Online | Download pdf file

RNB8813G photo
Loading ...
Loading ...
Loading ...
5
Specifications
- All Other Markets:
NOTE:
 (*) Measure Burner operating pressure at manifold test point with 2 burners operating at
'High Flame' setting.
 NAT, LPG & Butane Only - Operating pressure is ex-factory set and is not to be adjusted,
unless when converting between gases, if required.
 (**) TOWN GAS Only - Adjust burner operating pressure using adjustable gas regulator
supplied.
 Refer to ‘Gas Conversion and Specifications' section in this manual for further details.
Gas Connection
Gas supply connection point is located at rear of appliance, approximately 130mm from right hand
side, 32mm from rear and 655mm from floor and is reached from beneath appliance. (Refer to
‘Dimensions’ section).
Connection is ¾" BSP male thread.
Electrical Supply Requirements
230-240 V a.c, 50 Hz, 1.6A, 1P+N+E.
0.4kW.
Oven Fan Motor - 100W.
Natural Gas Town Gas (**)
Input Rate (N.H.G.C.)
- each Open Burner
28MJ/hr 28MJ/hr
- each 300mm Griddle Section 21MJ/hr 21MJ/hr
- Oven 30 MJ/hr 30 MJ/hr
Supply Pressure 1.13 - 3.40kPa 0.75 - 1.50kPa
Burner Operating Pressure (*) 0.95kPa 0.63 Pa
Gas Connection See ‘Gas Connection’ information overleaf
LP Gas (Propane) Butane
Input Rate (N.H.G.C.)
- each Open Burner
28MJ/hr 28MJ/hr
- each 300mm Griddle Section 21MJ/hr 21MJ/hr
- Oven 30 MJ/hr 30 MJ/hr
Supply Pressure 2.75 - 4.50kPa 2.75 - 4.50kPa
Burner Operating Pressure (*) 2.6kPa 2.6kPa
Gas Connection See ‘Gas Connection’ information overleaf
Loading ...
Loading ...
Loading ...