GE AZ85E12EACW1 Zoneline® Single Package Vertical Air Conditioner

Owner's Manual and Installation Instructions - Page 12

For AZ85E12EACW1. Series: 8500 Series

PDF File Manual, 28 pages, Read Online | Download pdf file

AZ85E12EACW1 photo
Loading ...
Loading ...
Loading ...
Installation Instructions
DIRECT CONNECT APPLICATIONS
FOR 230/208 VOLT DIRECT CONNECT
APPLICATIONS ONLY
Directconnection to branch circuit wiring inside
the providedjunction box must be made by connecting
asfollows in steps 1-3 below.
FOR 265 VOLT DIRECT CONNECT
APPLICATIONS ONLY
IMPORTANT:Connection of a 265VACproduct
to a branch circuit MUSTbe done by direct connection
in accordance with the National ElectricalCode. Plugging
this unit into a building mounted exposed receptacle
isnot permitted by code.
These models must be installed usingthe appropriate
GEpower supply kit for the branch circuit amperage
and the electrical resistance heater wattage desired.
Seethe POWERCONNECTIONCHARTon page 13
to selectthe appropriate kit.
It isthe responsibility of the installer to ensure
the connection of components isdone in accordance
with electrical codes.
Direct connection to branch circuit wiring inside
the providedjunction box must be made by connecting
asfollows in steps 1-3 below.
m
l-_ REMOVE JUNCTION BOX COVER
. RemovethejunctJon box cover by taking out the front
two screws.
Junction box
box cover
[] ATTACH CONDUIT
Usethe round knockout hole at the top
of thejunction boxto install conduit coming
from the branch circuit. Installand clamp the conduit
through the conduit clamp and bring wire leads into
thejunction box. Leave8" of wire freefrom the end
of the conduit.
Conduit
II _Conduit clamp
12
Loading ...
Loading ...
Loading ...