Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/84685179-gt1113/bge.png)
13
F) On either side, align the ends of the upper and lower hopper side tubes and
fasten these together with P clevis pins (Ø9.5x25). Secure with N R Pins (Ø3).
G) Locate the stitched sleeve at the front edge of the bag floor. Insert the bag
frame strap into the sleeve. (In some models, the bag frame strap is already
inserted into the sleeve.)
H) Once inserted, mount the bag frame strap onto the lower hopper side tubes
using Q clevis pins (Ø6X37). Secure with O R Pins (Ø2).
Loading ...
Loading ...
Loading ...