Tripp Lite SC240RT Eaton Supercharger for 9PX 8kVA and 11kVA UPS Systems, 240VDC, 3U Rack/Tower

Users Guide - Page 12

For SC240RT.

PDF File Manual, 28 pages, Read Online | Download pdf file

SC240RT photo
Loading ...
Loading ...
Loading ...
4 User’s Guide P-164000628 P-164000628—Rev 05
22..33 RRaacckkmmoouunntt IInnssttaallllaattiioonn
The BPM distributes high density power in a small form factor.
Read the complete installation procedure before beginning any electrical wiring.
To install the BPM in a rack:
1. Install the 4-post rail kit included with the BPM (see Figure 2).
Figure 2. Install Rail Kit
2. Place the BPM on the rails and push the BPM into the rack.
Verify that the breakers are facing the front of the rack and the BPM wiring terminals are facing the rear of
the rack.
3. Push the BPM past the back of the rack to allow access to the rear wire access-point covers and the wire
access panel cover (see Figure 3).
Figure 3. Push BPM into the Rack
4. Remove the wire access-point covers (see Figure 4).
Rackmount Installation
Loading ...
Loading ...
Loading ...