Loading ...
Loading ...
Loading ...
13
Step 2: Installing the Upper Handle
1.
When installing the Upper Handle, please note that the Drive & Auger Cables will already be
pre-attached to Upper Handle.
2.
Attach Upper Handle using the Frame Handle Assembly Hardware (4 sets /Knob, Saddle
Washer, M8 Nut, T-Screw) for your Upper & Lower Handle connection.
3.
When attaching Assembly Hardware, make sure ALL cables are underneath the Frame (Upper &
Lower) Handles after installation as indicated in Figure 3. VERY IMPORTANT!!!***
***Assembling Drive & Auger Cables over the top of the Frame
Handle will cause unnecessary tension in the cables, resulting in the Snow
blower propelling forward whenstarting the engine and may causedamagetothe
drive&augercontrol
(levers) when trying to engage them.
4.
Cut and remove all tie wraps that are on Cables, Frame Handles, Drive Control (Lever) &
Auger Control (Lever).
5.
Verify that the connection for the Upper & Lower Drive/Auger Cables is accurate. (See
Figure 3)
Figure
3
Loading ...
Loading ...
Loading ...