Saswell T21STK-2 Single Stage 5-2 Programmable HVAC Thermostat

OPERATING INSTRUCTION - Page 15

For T21STK-2.

PDF File Manual, 41 pages, Read Online | Download pdf file

T21STK-2 photo
Loading ...
Loading ...
Loading ...
15
CHECK THERMOSTAT OPERATION------------------------------------------------------------------
If at any time during testing your system does not operate properly, contact a qualified
service person.
Turn on power to the system.
Fan Operation
Move the system switch to the OFF position. If your system does not have a ā€œGā€ (Fan)
terminal connection, skip to the Heating System.
1. Move the fan switch to the ON position. The blower should begin to operate.
2. Move the fan switch to the AUTO position. The blower should stop
immediately.
Heating System
1. Move the SYSTEM switch to the HEAT position. If the auxiliary heating
system has a standing pilot, be sure to light it.
Loading ...
Loading ...
Loading ...