Loading ...
Loading ...
Loading ...
16
Installation
Commissioning
1. Before leaving the new installation;
a. Check the following functions in accordance with operating instructions specified in ‘Operation’
section of this manual.
 Lighting the Griddle.
 Light the Open Burners. (F - Flame Failure Option).
 Light the Open Burners. (PF - Pilot and Flame Failure Option).
 Check the Low Fire Burner Operation.
b. Ensure that the operator has been instructed in the areas of correct lighting, operation, and
shutdown procedure for the appliance.
2. This manual must be kept by owner for future reference and a record of
Date of Purchase,
Date
of Installation
and
Serial Number of Appliance
recorded and kept with this manual. (These
details can be found on the Rating Plate;
For Bench, Cabinet Base and Leg Stand Models, Rating Plate is attached to underside of
right hand side, front Cooktop lower trim.
For the Refrigerated Base Model, Rating Plate is located inside right hand front panel and can
be viewed through upper grille. Refer to ‘Gas Connection’ section and ‘Dimensions’ section.
NOTE: If for some reason it is not possible to get the appliance to operate correctly, shut off gas
supply and contact supplier of this appliance.
For Refrigeration Cabinet Installation details refer to Refrigeration Cabinet Installation in Operation
Manual supplied with appliance.
Loading ...
Loading ...
Loading ...