Loading ...
Loading ...
Loading ...
12
6
109
108
6 Set the left handrail assembly (C) on the floor in
the position shown.
Attach the Push Bar Bottom (109) to the left
handrail assembly (C) with two 5/16" x 3/4"
Patch Screws (108); do not fully tighten the
Patch Screws yet.
Attach the Push Bar Bottom (109) to the right
handrail assembly (D) in the same way.
C
D
108
7
7. Set the handrail assembly (E) on the floor in the
position shown. Attach the Push Bar Top (110)
with six #8 x 5/8" Machine Screws (106); start
all six Machine Screws, and then tighten
them. Do not overtighten the Machine Screws.
106
106
106
E
110
Loading ...
Loading ...
Loading ...