XOGRILL30 GRILL30 ,849 PRO LUXURY 30″ GRILL HEAD

XOGRILL30 User Manual - Page 18

For XOGRILL30.

PDF File Manual, 48 pages, Read Online | Download pdf file

XOGRILL30 photo
Loading ...
Loading ...
Loading ...
island vent
REQUIRED FOR NATURAL GAS
&
LP GAS
Ground to
Vent Bottom
LP Gas
on
BOTH SIDES
of Island
INSULATED SLEEVE INSTALLATION INSTRUCTIONS
IMPORTANT:
Before you build the frame, you must take into consideration the total
weight of the sleeve, grill and any finishing materials
Review the table on the next page for the
proper framing dimensions for the insulation
sleeve. Determine the entry point for both
the gas inlet and electric connections. Make
the 4" square holes for gas and electrical
connections (rear or bottom access) based
on your requirements. Note that the gas and
electrical connections are located on the
right side.
A "Level" should be used to assure that
the framing is level, both front to back and
side to side.
NOTE: Never under any circumstance
should you install the transformer or run a
gas hose in between the grill and the
SLEEVE INSTALLATION
Position the sleeve into the frame. No part
of the combustible enclosure can protrude
above the top surface or in front of the face
surface of the liner.
GRILL INSTALLATION
Use the proper equipment to support the
grill. Place the grill into the sleeve and place
it over the sleeve lip across the back and
sides. The liner is designed to support the
grill without additional fasteners.
FINISHING
If desired any gap remaining between the
sleeve and the combustible enclosure may
be filled with a non-combustible sealant
insulated sleeve
10 Square Inch Minimum
Each Register. 2 Per
Side. 1 High And 1 Low
2 1
/4"
Minimum
Page 1
8
Loading ...
Loading ...
Loading ...