Blue Seal Evolution GT46E Series 450mm Gas Fryer

Installation Operation Manual - Page 12

For GT46E.

PDF File Manual, 39 pages, Read Online | Download pdf file

GT46E photo
Loading ...
Loading ...
Loading ...
10
10. Verify that supply pressure is still correct.
11. Check Main Burner operating pressure (Adjust,
using Operating Pressure Adjusting Screw on
Gas Control Valve, see Fig 2), and as shown in
Gas Conversion and Specifications section,
Main Burner Operating Pressure
Adjustment.
NOTE: Insufficient gas supply line capacity,
indicated by operating pressure drop
during maximum gas supply demand,
is NOT ACCEPTABLE and may
invalidate manufacturers warranty for
this appliance.
Carry out the following commissioning checks before handing over the fryer for use, to ensure
that the fryer operates correctly and operator(s) understand correct operating procedure.
1. Before leaving the new installation;
a. Check the following functions in accordance with operating instructions specified in Operation
section of this manual.
Light Pilot Burners.
Light Main Burners.
Check Fryer Operation (Refer to Operation section of this manual).
b. The thermostat operation check should be carried out by filling fryer with oil / shortening to oil
FILL LEVEL mark at rear of tank (refer to Filling the Tank in Operation Section of Manual)
and set thermostat temperature to 180°C. (Refer to Controller Programming section). Light pilot
burners and turn On m ain burners in accordance w ith Operation Instructions in this
manual.
c. Once the oil is up to temperature, check the calibration of the thermostat. If a discrepancy is
found, thermostat calibration should be referred to the supplier.
d. Ensure each operator has been instructed in methods of correct lighting, operation, and
shutdown procedures for appliance.
Initial Start-Up
Before using the fryer;
a. For first time use of the fryer, prior to using fryer for cooking product, fill the fryer with oil and
operate for about 1 hour at the Full Flame setting to remove any fumes or odours which may be
present from the new appliance.
b. Refer to the Operation Section of this manual for details on how to operate the fryer.
2. This manual must be kept by the owner for future reference and a record of
Date of Purchase
,
Date of Installation
and
Serial Number of Appliance
is recorded and kept with this manual.
(These details can be found on the Rating Plate attached to the rear of the access door.
Refer to 'Installation' section).
NOTE: If for some reason it is not possible to get appliance to operate correctly, shut Off gas
supply and contact the appliance supplier.
Supply Pressure
Test Point
Operating Pressure
Test Point
Operating Pressure
Adjusting Screw
Pilot Burner
Adjusting Screw
Fig 2
IMPORTANT:
Loading ...
Loading ...
Loading ...