Loading ...
Loading ...
Loading ...
6
ENG
FUNCTIONS OF THE CHIMNEY HOOD
Control Panel
Installation Of Outer Duct
Installation of Inner Duct Mounting Bracket
Fix the inner duct to inner duct connection plate with 2 screws.
Put the outer duct on the chimney hood and fix to it by 2 screws (Figure 5)
2 fixing holes are drilled on the wall with Ø 6 mm electric drill at a suitable height and place to fix the inner duct
hanger plate onto the wall. 6mm drywall anchors are nailed into those holes and inner duct mounting brackrets are
pinned down. (Figure 6)
At the last step of chimney hood installation, the inner duct is screwed on the inner duct mounting brackets.
NOTE
Digital Control: Touch the symbols on the keys. (On/Off
function and timer are on the same key; if pressed for 1
sec on-off function will operate.
If pressed for 3 sec. 15 minutes timer will operate.
Packaging may not include inner duct according to model.
Figure 2 Figure 3 Figure 4
Figure 5 Figure 6
Loading ...
Loading ...
Loading ...