Loading ...
Loading ...
Loading ...
6
Installation Of The Beer Keg
Position the beer keg directly in front of the open door. Using keg handles only, carefully lift the
beer keg. (See Figure 5)
To place the beer keg inside the cabinet, brace your knees behind the beer keg. Lift the front of
the keg just enough so the front edge of the keg is resting on the front edge of the Beer Dispenser
bottom cabinet. (See Figure 6)
Grasp the keg handles and slide it all the way into the cabinet.
Fig. 4 Fig. 5 Fig. 6
Installation Of The Keg Coupler
Insert the keg coupler provided into the locking neck of the beer keg and turn it clockwise to lock
into position, making sure the keg coupler is in the closed position. (See Figure 7)
Installation Of The CO2 Air Line Hose
Attach the end of the air line (red) hose provided to the hose connection on the keg coupler.
Connecting the beer tower to coupler
Make sure the washer is properly inserted into the wing nut.
Make sure the small round bead is in place (dropped down into the top of the coupler).
Make sure the ball retainer is in place on the coupler, with the ‘arms’ down into the coupler.
Place wing nut into the top of the coupler turning until tight.
How to Tap a Keg of Beer
Make sure that the CO
2
is turned off, and the Secondary valve on the regulator is in the ‘Closed’
position.
Pull out and release the pressure release valve on the Coupler to purge any air pressure.
Make sure the beer tower faucet is in the closed position.
Pull tapping handle out and press downward until it locks into position. (See Figure 8) The keg is
now tapped.
Opening the CO
2
Cylinder Main Valve
Make sure the secondary shut-off valve (shown in figure 9 in ‘Open’ position) is closed. To open
the main CO
2
cylinder valve, slowly turn the main valve counter-clockwise until fully open.
Notice the needle on the regulator gauge start to climb.
Adjusting The CO
2
Regulator
The gauge monitors low internal keg pressure and should be adjusted to read between 10-12 psi.
(See Figure 10). The pressure can be adjusted as needed.
Release adjustment lock nut marked 2.
Using a flat screwdriver, turn regulator screw marked 3.
o To increase pressure, turn screw clockwise.
o To decrease pressure, turn screw counter - clockwise.
Retighten lock nut marked 2.
Open secondary shut off valve to let CO
2
flow into the keg.
Allow several minutes for the keg to properly pressurize. Regulator gauge may drop while this
happens. (Note: Listen for hissing along all connections to identify if there are any leaks)
Loading ...
Loading ...
Loading ...