Premium Levella PAC12060 12,000 BTU Split A/C

Product Manual - Page 23

For PAC12060.

PDF File Manual, 51 pages, Read Online | Download pdf file

PAC12060 photo
Loading ...
Loading ...
Loading ...
(1). Unscrew and remove caps from 2 and 3-way valves.
(4). Start vacuum pump for 10-15 minutes until reaching a vacuum of 10 mm Hg absolutes.
(6). Open 2-way valve 1/4 turn then close it after 10 seconds. Check tightness of all joints using liquid
soap or an electronic leak detector.
(7). Turn 2 and 3-way valves stem to fully the valves. Disconnect vacuum pump flexible hose.
(8). Replace and tighten all valve caps.
(5). With vacuum pump still running close the low pressure knob on vacuum pump manifold. Then stop
vacuum pump.
(2). Unscrew and remove cap from service valve.
(3). Connect vacuum pump flexible hose to the service valve.
How to Purge Air Tubes:
17
Installation instructions
Loading ...
Loading ...
Loading ...